California Department of Transportation
Main Page | Search | You are not logged in | Login | Register | Instructions
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
8 - 1C3901 SBD - 10 - .3-29.8 NEAR MONTCLAIR AND REDLANDS FROM 0.32 MI E/O LOS ANGELES COUNTY LINE RESURFACE BRIDGE DECKS AND REPLACE JOINT SEALS Rehabilitate Bridge Deck 0 – 1 April 2014 View Details January 02, 2014
6 - 0E680_ MAD - 99 - R0.9/28.2 IN MADERA COUNTY IN MADERA AND CHOWCHILLA AT VARIOUS LOCATIONS FROM SOUTH MADERA OC TO AVENUE 26 SEPARATION 99 CORRIDOR-BRIDGE ENHANCEMENT Clean and Paint Bridge 0 – 1 May 2014 View Details March 20, 2014
2 - 4F2305 TEH - 005 - R000.0/R022.2 0 – 1 February 2013 View Details August 02, 2012
11 - 416401 SD - 078 - 17.0/17.4 Pavement Rehab Asphalt Concrete Surfacing 0 – 1 90 March 2014 View Details September 13, 2013
12 - 0M0901 ORA - 74 - 0.0/1.8 RTE 74 FROM THE I-5/RTE 74 I.C. TO THE CITY OF SAN JUAN CAPISTRANO CITY LINE PM 1.8. UPGRADE PEDESTRIAN FACILITIES WITHIN THE CT ROW TO CURRENT ADA STANDARDS 0 – 1 September 2013 View Details November 30, 2011
5 - 0T270_ MON - 68 - 19.2 PROJECT LOCATED ALONG ROUTE 68 NEAR SALINAS IN MONTEREY COUNTY AT THE HITCHCOCK ROAD INSTAL TRAFFIC SIGNAL Earthwork, Grading and Paving, Signals 0 – 1 60 March 2015 View Details
Has special requirements.
April 22, 2014
3 - 4M4404 ED - 050 - 049.0/ 052.0 NEAR KYBURZ FROM SILVER FORK ROAD TO 36 MILE STONE ROAD 0 – 1 January 2014 View Details December 20, 2011
1 - 0C1204 MEN - 001 - 0 – 1 June 2014 View Details June 12, 2012
3 - 4M4604 SIE - 089 - 025.9/ 027.9 NEAR CALPINE AT VARIOUS LOCATIONS FROM CALPINE SUMMIT TO SULPHUR CREEK ROAD 0 – 1 December 2013 View Details December 20, 2011
7 - 283904 LA - 210 - 25.4/28.7 In Pasadena, Irwindale, Azusa and Glendora at various locations. Vine planting Highway Planting 0 – 1 80 July 2014 View Details December 28, 2010
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
5 - 1C300_ MON - 1 - 72.9/74.8 NEAR MONTEREY FROM CARMEL VALLEY ROAD TO 0.2 MI NORTH OF CARPENTER STREET INSTALL RUMBLE STRIP Asphalt Concrete Surfacing 0 – 1 20 June 2014 View Details
Has special requirements.
March 12, 2014
11 - 2T2601 SD - 805 - 004.4/010.0 IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY FROM ORANGE AVE OVERCROSSING TO 18TH STREET OVERCROSSING PM ***4.4-10.0*** CONSTRUCT EXPRESS LANES Widening, Concrete Barrier, Freeway and Structures 0 – 1 January 0000 View Details
Has special requirements.
June 24, 2013
11 - 415101 SD - 078 - 0.90/09.1 Exit Ramps Widening Modify Ramp, Widening 0 – 1 250 January 0000 View Details
Has special requirements.
August 09, 2013
12 - 0L7501 ORA - 91 - 0.3/0.3 OC. EB RTE 91 OFF-RAMP TO ORANGTHROPE AVE. SHOULDER WIDENING, SIGNING, STRIPING AND GURDRAIL MODIFICATION 0 – 1 260-330 June 2013 View Details November 30, 2011
11 - 415601 SD - 008 - 46.2/46.5 Checkpoint Improvements Building 0 – 1 125 January 0000 View Details
Has special requirements.
August 09, 2013
7 - 000003 - VAR - In Los Angeles and Ventura County on various routes. Minor A (between $250,001 and $1 million) and Minor B (up to $250,000) projects. See link for a listing of upcoming projects: http://www.dot.ca.gov/dist07/travel/projects/D7MinorProjects_Jan-2011.pdf 0 – 1 January 2013 View Details January 23, 2013
4 - 2G3624 ALA - 92 - R5.1/R5.8 IN ALAMEDA COUNTY ON ROUTE 92 IN HAYWARD FROM INDUSTRIAL BOULEVARD UNDERCROSSING TO HESPERIAN BOULEVARD OVERCROSSING REPLACEMENT PLANTING AND IRRIGATION Highway Planting, Establish Existing Planting 0 – 1 200 July 2014 View Details July 01, 2014
11 - 416101 SD - 015 - 20.3/20.9 Ramp Reahb Asphalt Concrete Surfacing 0 – 1 90 March 2014 View Details September 13, 2013
10 - 0P670_ VAR - VAR - 0.0 IN TUOLUMNE COUNTY AT THE OLD SONORA MAINTENANCE STATION CLEANUP SOIL AND GROUNDWATER 0 – 1 February 2015 View Details April 10, 2014
10 - 0P800_ MER - 140 - 11.3 IN MERCED COUNTY ABOUT 5.2 MILES EAT OF GUSTINE ON STATE ROUTE 140 AT NORTH BRANCH MUD SLOUGH BRIDGE, BR. NO. 39-0091 BRIDGE SCOUR MITIGATION 0 – 1 January 2015 View Details April 10, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
4 - 1G4204 SON - 116 - 13.6/13.9 IN SONOMA COUNTY AT GUERNEVILLE FROM 1.1 MILES EAST OF MAYS CANYON ROAD TO 0.1 MILE WEST OF OLD FELLOWS PARK ROAD CONSTRUCT RETAINING WALL, PLACE ROCK PROTECTION, MODIFY DRAINAGE Rock Slope Protection, Retaining Wall, Drainage 0 – 1 130 December 2014 View Details July 01, 2014
4 - 1SS224 SON - 128 - 2.36,2.85 IN SONOMA COUNTY ON ROUTE 128 NEAR CLOVERDALE AT PM 2.36 AND PM 2.85 WEST OF CLOVERDALE BLVD CONSTRUCT SOLDIER PILE WALL, SLOPE PROTECTION, AND DRAINAGE Repair Slope, Drainage, Retaining Wall 0 – 1 80 September 2014 View Details July 01, 2014
4 - 3G7604 NAP - 128 - 20.2 IN NAPA COUNTY ON ROUTE 128 NEAR SPANISH FLAT AT CAPELL BRIDGE CREEK BRIDGE INSTALL SLOPE INDICATORS AND UPGRADE DRAINAGE SYSTEM Earthwork, Asphalt Concrete Surfacing, Modify Drainage 0 – 1 60 September 2014 View Details July 01, 2014
12 - 0L2901 ORA - 1 - 28.7/29.7 ORANGE COUNTY. IN CITY HUNTINGTON BEACH, SR-001 REMOVE TEMPORARY K-RAILS AND PLACE APPROXIMATELY 500 FEET OF MBGR 0 – 1 70-80 November 2011 View Details November 30, 2011
4 - 0G2214 ALA - 13 - VAR IN ALAMEDA AND CONTRA COSTA COUNTY ON ROUTE 13,24,61,160,580,AND 680 AT VARIOUS LOCATIONS CONSTRUCT CURB RAMPS, PASSAGEWAYS, AND SIDEWALKS Wheelchair Ramps 0 – 1 100 August 2014 View Details July 01, 2014
2 - 4F4005 TRI - 036 - 015.8/016.5 0 – 1 January 2014 View Details June 12, 2012
11 - 2M6101 IMP - 8 - 042.5/081.8 IN IMPERIAL COUNTY AT VARIOUS LOCATIONS CLEAN AND TREAT BRIDGE DECKS WITH METHACRYLATE AND REPAIR JOINT SEALS Seal Cracks, Rehabilitate Bridge Deck 0 – 1 February 2014 View Details September 13, 2013
5 - 1F480_ SB - 101 - 47.3/47.9 IN SANTA BARBARA COUNTY ON ROUTE 101 IN THE SOUTHBOUND LANES, APROXIMATELY 1.1 MILE SOUTH OF JCT ROUTE 1/101 PLACE HIGH FRICTION SURFACE TREATMENT 0 – 1 April 2014 View Details April 08, 2014
4 - 2G8704 MRN - 1 - 1.4 IN MARIN COUNTY ON ROUTE 1 IN MILL VALLEY AT PM 1.4 PLACE ROCK SLOPE PROTECTION Rock Slope Protection, Earthwork 0 – 1 80 September 2014 View Details July 01, 2014
12 - 0K3301 ORA - 91 - 18/18 IN ORA COUNTY AT COAL CANYON ROAD INTERCHANGE WILDLIFE CORRIDOR CONNECTIVITY ENHA NCEMENT (INSTALL VEGETATION) 0 – 1 130-160 November 2012 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0L77U1 ORA - 39 - 7.1/13.8 ON SR-39 @ HAZARD AVE, LAMPSON AVE, AND LA PALMA AVE. INSTALL ADDITIONAL SAFETY LIGHTING AND MODIFY SIGNALS 0 – 1 March 2013 View Details November 30, 2011
10 - 0K021_ MER - 99 - 15.8/17.3 ON ROUTE 99 IN AND NEAR MERCED FROM NORTH OF "V" STREET TO BLACK CANAL INSTALL ABOUT 220 TREES AND 800 GROUNDCOVER SHRUBS AND IRRIGATION SYSTEM Irrigation System, Highway Planting 0 – 1 870 June 2014 View Details
Has special requirements.
March 12, 2014
7 - 272404 LA - 005 - 14.9/16.8 IN LA COUNTY IN LA FROM INDIANA STREET UC TO BOYLE STREET ST OC STORM WATER SOURCE CONTROL Highway Planting 0 – 1 980 July 2013 View Details December 16, 2011
5 - 0T760_ MON - 1 - R77.6 AT NORTHBOUND AGUAJITO ROAD UC ON-RAMP IN MONTEREY ON STATE ROUTE 1 IN MONTEREY COUNTY WET WEATHER IMPROVEMENT Concrete Barrier, Asphalt Concrete Surfacing 0 – 1 120 June 2014 View Details
Has special requirements.
January 16, 2014
7 - 209704 LA - 5812 - LE.ND/A.N 943 W. DORAN STREET - GLENDALE UPGRADE MAINTENANCE STATION 0 – 1 290 August 2014 View Details January 23, 2013
7 - 265204 LA - 405 - 34.3/34.6 LA COUNTY ON S/B AT SEPULVEDA BOULEVARD ON-RAMP CONSTRUCT ACCELERATION LANE 0 – 1 320 November 2014 View Details February 07, 2012
12 - 0L6901 ORA - 1 - 28.3/28.3 PCH AT THE INTERSECTION OF BOLSA CHICA SB RD. REMOVE & REPLACE EXISTING PAVEMENT DELINEATION, MARKINGS, ROADSIDE PANELS, UPDGRADE TRAFFIC SIGNALS. 0 – 1 130-160 February 2012 View Details November 30, 2011
1 - 0B3304 DN - 199 - 026.3/ IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.9 MI NORTH OF SISKIYOU FORK RD 0 – 1 March 2014 View Details August 03, 2012
11 - 275601 SD - 015 - 54.0 IN SAN DIEGO COUNTY IN RAINBOW ON ROUTE 15 AT THE RAINBOW TRUCK INSPE UPGRADE ELECTRICAL AND MODIFY OFFICE Modify Building, Modify Lighting, Scale Facility 0 – 1 250 January 2014 View Details January 13, 2014
12 - 0A4301 ORA - 1 - 12.1/12.2 NB RTE 001 (PCH) & EL MORRO SCHOOL INTERSECTION PROVIDE RIGHT TURN LANE AT NB/PCH 0 – 1 170-220 September 2012 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0L7001 ORA - 90 - 2.3/2.3 OC, IN LA HABRA AT VILLAGE DRIVE INVERT PAVING SSPA MAINTENANCE. MAINTENANCE 0 – 1 May 2012 View Details November 30, 2011
12 - 0L9701 ORA - 39 - 2.1/6.2 OC. ON SR-39 AT MCFADDEN AVE (PM: 6.14), MAIN/ELLIS ST. (PM: 3.12) & YORKTOWN AVE (PM: 2.14) ADD SAFETY LIGHTING, MODIFY SIGNALS AND PAVEMENT MARKING, ADA UPDATE 0 – 1 July 2013 View Details November 30, 2011
1 - 0B4704 MEN - 001 - 035.7/ IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD- 132 0 – 1 December 2013 View Details November 21, 2011
12 - 0L3001 ORA - 405 - 17.9/0 SB I-405; IN CITY OF WESTMINSTER_AT THE INTERSECTION OF GOLDEN WEST ST. AND SB I-405 ON RAMP. REMOVE/REPLACE PAVEMENT DELINEATION MARKINGS, ROADSIDE PANELS, CURBSIDE RAMPS & UPGRADE TRAFFIC SIGNAL. 0 – 1 130-160 January 2013 View Details November 30, 2011
11 - 416201 SD - 015 - R36.2/R37.0 I-015 Deer Springs Road Ramps Cold Plane and Overlay Ramps Repair Ramp 0 – 1 90 March 2014 View Details September 13, 2013
7 - 183124 LA - 710 - 09.4/18.4 IN LA COUNTY, LB CITY/SGT FROM RTE 405/FIRESTONE BOULEVARD LANDSCAPE Repair Irrigation System, Highway Planting 0 – 1 510 December 2014 View Details December 16, 2011
7 - 258804 LA - - 00.0/00.0 LA COUNTY IN LA AT VARIOUS LOCATIONS SOIL STABILIZATION AND REVEGATION 0 – 1 210 February 2013 View Details
Has special requirements.
January 23, 2013
9 - 35060_ INY - 168 - 16.8/17.5 IN INYO COUNTY NEAR BISHOP FROM BARLOW LANE TO 0.1 MILES WEST OF PIONEER LANE CONSTRUCT SIDEWALKS 0 – 1 May 2015 View Details April 10, 2014
11 - 409901 SD - 076 - 020.2/020.7 IN SAN DIEGO COUNTY NEAR OCEANSIDE FROM 0.8 MILE EAST OF COUSER CANYON ROAD TO 2.3 MILES WEST OF PALA MISSION ROAD. HIGHWAY RE-ALIGNMENT Realignment, Roadway 0 – 1 250 January 0000 View Details
Has special requirements.
June 24, 2013
8 - 0P2801 RIV - 60 - 1.56 BETWEEN 0.45 MI E/O ETIWANDA AVE. UC AND 0.55 MI W/O WINEVILLE RD UC SIGNALIZE & REALIGN LEFT-TURN LANES Signals, Widening 0 – 1 60 May 2014 View Details July 08, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 213404 LA - 010 - 18.4/21.0 IN LA COUNTY IN LA FROM STATE STREET OC TO CAMPUS ROAD OC HIGHWAY PLANING RESTORATION 0 – 1 980 January 2015 View Details February 03, 2012
12 - 0F5501 ORA - 405 - 6.4/7.4 OC. IN IRVINE ON RTE 405 FR. SAN DIEGO CREEK TO VON KARMAN AVE OVERCROSSING. HIGHWAY PLANTING, EROSION CONTROL, AND MINIMIZE EXPOSURE OF HIGHWAY WORKERS TO TRAFFIC 0 – 1 March 2012 View Details November 30, 2011
12 - 0M2201 ORA - 57 - 11.8/13.4 SR-57 INTERCHANGE AT ORANGEWOOD AVE AND AT KATELLA AVE. ADA IMPROVEMENTS ON ROUTE 57 TO MEET CURRENT STANDARDS 0 – 1 March 2012 View Details November 30, 2011
1 - 0B5604 MEN - 253 - 001.5/ 001.8 IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.2 MI WEST TO 0.1 MI EAST OF SINGLY CATTLE PASS 0 – 1 February 2014 View Details August 02, 2012
12 - 0M1201 ORA - 5 - 28.4/28.4 NB I-5 ON-RAMP FROM TUSTIN RANCH RD , CITY OF TUSTIN CONVERT THE TWO-LANE ON-RAMP TO THREE-LANE ON-RAMP (ONE HOV & TWO GP LANES) 0 – 1 January 2013 View Details November 30, 2011
8 - 0P8201 RIV - 215 - 9.2/15.4 IN AND NEAR MURRIETA AT VARIOUS LOCATIONS FROM 0.8 MILES N/O JUNCTION 15/215 TO SCOTT ROAD REPAIRS CULVERTS Repair Culverts 0 – 1 40 November 2013 View Details November 22, 2013
12 - 0L8701 ORA - 5 - 19.4/19.5 IN LAKE FOREST AT THE NORHTBOUND OFF-RAMP TO LAKE FOREST DRIVE. MODIFY TRAFFIC SIGNALS. SAFETY/TRAFFIC OPERATION 0 – 1 June 2013 View Details November 30, 2011
12 - 0L9101 ORA - 405 - 7.5/7.8 OC. IN THE CITY OF IRVINE ON I-405 FOR NB & SB MACARTHUR ON-RAMPS. REPAIR SLOPE EMBANKMENT & DISTRESSED ASPHALT CONCRETE ROADWAY ON-RAMPS 0 – 1 January 2012 View Details November 30, 2011
7 - 281104 LA - 110 - 24.7/24.9 LA COUNTY IN LA BETWEEN STADIUM WAY UC & FIGUEROA ST TUNNEL (SOUTHBOUND) Retrofit Stadium Way Sidehill Viaduct Repair Bridge 0 – 1 125 February 2015 View Details February 07, 2012
12 - 0M1401 ORA - 405 - 0.3/7.8 I-405 FROM IRVINE CENTER DR. TO MACARTHUR BLVD. ADA UPGRADES. OFF-RAMP 0 – 1 April 2012 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0L7101 ORA - 405 - 1.1/9.0 RTE-55 IN SANTA ANA FR. I-405 TO MCARTHUR & ON RTE 405 IN IRVINE & COSTA MESA FROM IRVINE CENTER DR. TO MACARTHUR CONCRETE DITCH PREVENTATIVE MAINTENANCE 0 – 1 May 2012 View Details November 30, 2011
12 - 0M2401 ORA - 74 - 1.1/2.0 OC. IN CITY OF SAN JUAN CAPISTRANO FROM CALLE ENTRADERO RD TO SAN JUAN CAPISTRANO CITY LIMIT. REMOVE/REPLACE AC 0 – 1 April 2012 View Details November 30, 2011
12 - 0L6601 ORA - 5 - 10.9/15.2 OC. ON RTE 5 FR. PM 10.9 TO 15.2. IN CITIES OF JAN JUAN CAPISTRANO & MISSION VIEJO. REPLACE R/W CHAIN LINK FENCE 0 – 1 February 2012 View Details November 30, 2011
12 - 0L6101 ORA - 1 - 19/0 IN NEW PORT BCH CAMPUS AND DOVER ST PEDESTRIAN BRIDGE OVERCROSSING PEDESTRIAN BRIDGE OVERCOSSING 0 – 1 260-330 December 2012 View Details November 30, 2011
7 - 291004 LA - 14 - 32.1R/59.2R IN LA IN SANTA CLARITA TO SIERRA HWY,INSTALL ADA RAMPS UPGRADE ADA ADA INFRASTRUCTURE Wheelchair Ramps, Modify Signals 0 – 1 270 September 2014 View Details
Has special requirements.
January 27, 2012
3 - 4M2604 SIE - 089 - 027.8/ 029.6 NEAR CALPINE FROM SULPHUR CREEK ROAD TO THE SIERRA/PLUMAS COUNTY LINE 0 – 1 October 2013 View Details January 06, 2012
3 - 4M2004 COL - 005 - R022.3/ IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS Rock Slope Protection  Rock Slope Protection 0 – 1 February 2014 View Details
Has special requirements.
June 12, 2012
12 - 0M0001 ORA - 55 - 12.7/12.7 IN OC. ON RTE-55 SB CONNECTOR ON- RAMP FROM EB RTE-22. OVERLAY THE CONNECTOR WITH OCGA, MODIFY DRAINAGE, UPGRADE METAL BEAM GUARDRAIL, AND RESTRIPE THE RAMP 0 – 1 September 2012 View Details November 30, 2011
10 - 0W110_ SJ - 4 - R16.2 ON STATE ROUTE 4 IN SAN JOAQUIN COUNTY AT PM R16.1 IN THE CITY OF STOCKTON HIGH FRICTION SURFACE TREATMENT & INSTALL CONCRETE GUARDRAIL 0 – 1 January 2015 View Details January 17, 2014
12 - 0M1601 ORA - 57 - 13.4/14.8 SR-57 INTERCHANGE AT BALL RD. SR-57 INTERCHANGE AT LINCOLN AVE. ADA IMPROVEMENTS ON SR-57 TO MEET CURRENT STANDARDS 0 – 1 April 2012 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0M1301 ORA - 405 - 5.0/5.6 NB I-405 AT OFF-RAMP TO CULVER DR. IN CITY OF IRVINE WIDEN RAMP FOR DECELERATION LANE 0 – 1 August 2012 View Details November 30, 2011
6 - 0N560_ KER - 58 - R94.4 IN KERN COUNTY IN THE CITY OF TEHACHAPI ON ROUTE 58 AT THE WESTBOUND TEHACHAPI SUMMIT INTERCHANGE(EXIT 151) WIDEN INTERSECTION 0 – 1 February 2015 View Details April 10, 2014
11 - 416501 IMP - 008 - 94.8/95.1 In Imperial County @ Winterhaven Interchange Cold Plane and Overlay Off-ramps and On-ramps Asphalt Concrete Surfacing, Repair Ramp 0 – 1 90 March 2014 View Details September 13, 2013
8 - 0R1901 RIV - 74 - 22.9/23.3 IN RIVERSIDE COUNTY NEAR PERRIS FROM 0.2 MI WEST OF THEDA STREET TO 0.1 MI EAST OF MAPES ROAD IN STALL TRAFFIC SIGNALS Lighting, Signals, Flashing Beacons, Guard Railing 0 – 1 40 January 2014 View Details January 02, 2014
3 - 2F4004 ED - 049 - 020.2/020.4 0 – 1 April 2014 View Details August 06, 2012
5 - 0S030_ SB - 1, 101, 154 - 0.0, 0.0, 0.0 PROJECTED LOCATED IN SANTA BARBARA COUNTY ALONG HIGHWAY 1, 101, 154, 192 AND 246 AT VATIOUS LOCATIONS CURB RAMPS AND MINOR SIDWALK EXTENSIONS Wheelchair Ramps 0 – 1 105 August 2014 View Details January 14, 2014
10 - 0X300_ MER - 140, 99, 108 - 40.7, 22.8, 33.1 IN MERCED COUNTY NEAR MERCED ON STATE ROUTE 140 AT ARBOLEDA DRIVE, IN ATWATER ON STATE ROUTE 99 AT APPLEGATE ROAD, AND IN STANISLAUS COUNTY IN RIVERBANK ON STATE ROUTE 108 AT EIGHTH STREET INSTALL FLASHING BEACONS 0 – 1 August 2014 View Details April 22, 2014
10 - 0X350_ AMA - 16, 88, 120 - R0.0/R2.5, 0.0/3.1, 7.9/13.2 ON ROUTE 16, 88 AND 120 IN AMADOR AND TUOLUMNE COUNTY AT VARIOUS LOCATIONS INSTALL RUMBLE STRIPS 0 – 1 September 2014 View Details April 10, 2014
2 - 1E0004 MOD - 299 - 022.4/ IN MODOC COUNTY AT CANBY AT CANBY MAINTENANCE STATION 0 – 1 January 2014 View Details December 20, 2011
11 - 056341 SD - 11 - 2.40/2.40 IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 2.4 MILES EAST OF SANYO AVENUE UNDERCROSSING TO MEXICO BORDER CONSTRUCT LAND PORT OF ENTRY Building 0 – 1 110 August 2014 View Details
Has special requirements.
March 15, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
5 - 0T001_ SB - 154 - R7.8/R8.3 IN SANTA BARBARA COUNTY NEAR SANTA YNEZ AT AND NEAR ROUTE 246 INTERSECTION LANDSCAPING Irrigation System 0 – 1 800 August 2014 View Details
Has special requirements.
March 12, 2014
5 - 0T500_ Var - Var - Var/Var DEVELOPMENT AND INSTALLATION OF 22 INTERPRETIVE DISPLAYS AT VARIOUS DISTRICT 5 VISTA POINT LOCATIONS VISTA POINT INTERPRETIVE DISPLAYS Signs 0 – 1 450 August 2014 View Details
Has special requirements.
March 12, 2014
2 - 0E3604 TEH - 005 - 010.5/ IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA Replace Building,Erosion Control,Highway Planting,Replace Irrigation System,Replace Lighting,Retaining Wall,Wheelchair Ramps  Replace Building, Erosion Control, Highway Planting, Replace Irrigation System, Replace Lighting, Retaining Wall, Wheelchair Ramps 1 – 10 300 July 2013 View Details August 16, 2012
1 - 0B4104 HUM - 101 - R040.9/ IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP 1 – 10 December 2013 View Details June 25, 2012
8 - 1C8401 RIV - 91 - 17.4 IN RIVERSIDE @ BROCKTON (PM 17.43 )& MISSION INN AVE UC (PM 20.53) & NEAR ONTARIO @ VALLEY BLVD OFF-RAMP UC (PM 11.50) PRESSURE WASH, SPOT BLAST CLEAN AND FULL PAINT BRIDGE. Clean and Paint Bridge 1 – 10 April 2014 View Details January 02, 2014
7 - 000002 VEN - VAR - VAR In Ventura County on various Routes 3 Pavement Rehabilitation Projets (Profile Grinding, Cold In-place Recycling, and RHMA) Asphalt Concrete Surfacing, Slurry Seal Coat 1 – 10 February 2013 View Details
Has special requirements.
January 14, 2013
1 - 0B3604 HUM - 036 - 035.5/ 040.5 IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4-119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4-129 1 – 10 December 2013 View Details June 25, 2012
1 - 0B3504 HUM - 036 - 030.2/ IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010 1 – 10 December 2013 View Details November 21, 2011
7 - 277204 LA - 170 - 17.7R/20.3R IN LA CNTY IN LA ON N/B RTE 170 FR VANOWEN ST TO SHELDON ST EROSION CONTROL Erosion Control, Highway Planting 1 – 10 250 April 2015 View Details
Has special requirements.
October 07, 2010
7 - 287204 LA - 134 - 1.6/2.7 IN LA CNTY IN BRBNK FR CLYBOURN AVE TO BOB HOPE DR STORM WATER SOURCE CONTROL Erosion Control, Irrigation System 1 – 10 1000 August 2014 View Details
Has special requirements.
January 20, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0J6701 ORA - 241 - 32.5/39 IN ORANGE COUNTY - FROM SANTIAGO CANYON ROAD TO RTE 91 REVEGETATION OF EXPOSED SLOPES FOR NPDES CONCERNS AND SOURCE CONTROL 1 – 10 1040-1300 June 2012 View Details November 30, 2011
7 - 275704 LA - 103 - 0.0 /1.0 IN LOS ANGELES COUNTY IN LOS AANGELES CITY, BR#53-2626 - UNION PACIFIC OVERHEAD PAINT STEEL PORTION OF STRUCTURE Clean and Paint Bridge 1 – 10 April 2014 View Details
Has special requirements.
December 15, 2009
5 - 0T980_ SCR - 17 - 8.2/10.1 ON ROUTE 17 BETWEEN 0.9 MILE NORTH OF VINEHILL ROAD AND 0.5 MILE SOUTH OF GLENWOOD DRIVE SHOULDER WIDENING AND CONCRETE GUARDRAIL Asphalt Concrete Surfacing, Drainage, Earthwork, Retaining Wall, Viaduct 1 – 10 230 March 2015 View Details April 22, 2014
11 - 404301 SD - 5 - 024.2/025.5 IN SAN DIEGO COUNTY IN SAN DIEGO FROM MISSION BAY OVERCROSSING TO 0.5 MILE SOUTH OF LA JOLLA PARKWAY VIADUCT OUTER SEPARATION BARRIER Concrete Barrier 1 – 10 350 August 2013 View Details June 24, 2013
1 - 0B2704 DN - 101 - 015.1/ 015.3 IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY FROM 1.3 TO 1.5 MILES NORTH OF RUDISILL ROAD 1 – 10 November 2013 View Details March 26, 2012
11 - 2T2701 SD - 805 - 012.6/015.9 IN SAN DIEGO COUNTY IN SAN DIEGO FROM GREENWOOD UNDERPASS TO UNIVERSITY AVE OVERCROSSING ***PM 12.6-15.9*** CONSTRUCT FREEWAY TO FREEWAY CONNECTOR Interchange, Freeway and Structures, Drainage, Bridge, Asphalt Concrete Surfacing 1 – 10 500 September 2015 View Details October 08, 2014
8 - 0R4001 SBD - 2 - 0.0-6.4 VARIOUS LOCATIONS; SBD 2 PM 0.0/6.4, SBD 18 PM 99.9/115.9, SBD 138 PM 0.0/6.6 PLACE SEAL COAT ON RTES 18 & 138. OVERLAY ON RTE 2 Seal Coat, Asphalt Concrete Surfacing 1 – 10 40 March 2014 View Details January 02, 2014
4 - 3G4434 SF - 80 - 5.8/7.8 IN THE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 80 AT THE SAN FRANCISCO-OAKLAND BAY BRIDGE WEST SPAN REPLACE GRATING SHIELDS, LADDERS, PLATFORMS, AND GREASELINES Freeway and Structures 1 – 10 100 July 2014 View Details July 01, 2014
11 - 410301 SD - 8 - 037.9 ON ROUTE 8 IN SAN DIEGO COUNTY ABOUT 9 MILES EAST OF ALPINE AT DESCANSO MAINTENANCE STATION PAVEMENT REHABILITATION Rehabilitate Pavement 1 – 10 125 April 2014 View Details September 13, 2013
11 - 2M4301 SD - 008 - 006.3/009.0 IN SAN DIEGO COUNTY IN SAN DIEGO AND LA MESA ON ROUTE 8 AT 0.3 MILE WEST OF LAKE MURRAY BOULEVARD SLAB REPLACEMENT, AC SHOULDER AND AUX LANE AC Replace PCC Pavement, Rehabilitate Pavement, Asphalt Concrete Surfacing 1 – 10 250 March 2014 View Details September 13, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
8 - 0J8501 SBD - 138 - 24.1 NEAR SILVERWOOD LAKE AT HORSETHIEF CREEK BRIDGE #54-816 REPLACE BRIDGE Replace Bridge 1 – 10 190 April 2014 View Details July 08, 2013
6 - 0P970_ MAD - 152 - R0.1/1.1 ABOUT 17 MILES EAST OF LOS BANOS FROM ROUTE 59/152 SEPARATION TO ROAD 4/LINCOLN ROAD MEDIAN BARRIER AND RUMBLE STRIPS Earthwork, Reconstruct Drainage, Asphalt Concrete Surfacing, Erosion Control, Grading and Paving, Pavements Markings, Reconstruct Signs 1 – 10 50 September 2014 View Details
Has special requirements.
March 12, 2014
11 - 282301 SD - 005 - R20.1/R23.9 IN SD CNTY IN SD ON RTE 5 FROM SD RIVER BR TO MBAY OC AND ON RTE8 VAR STORM WATER DETENTION BASINS RETROFIT Rock Slope Protection, Channelize, Modify Drainage 1 – 10 60 March 2015 View Details August 20, 2014
7 - 290904 LA - 210 - 7.1/7.8 IN LA CNTY IN LA BET TERRA BELLA AND MOBIL HOMES REPLACING MBGR TO CONCRETE BARRIER Concrete Barrier 1 – 10 150 August 2013 View Details January 23, 2013
7 - 2777U4 LA - 5 - 25.2/27.0 IN LOS ANGELES ON ROUTE 5 FROM COLORADO EXTENSION TO HAZEL STREET PUC AND ON ROUTE 134 FROM VICTORY BOULEVARD/RIVERSIDE DRIVE TO SAN FERNANDO ROAD EROSION CONTROL Erosion Control, Highway Planting 1 – 10 250 July 2013 View Details
Has special requirements.
January 23, 2013
7 - 288904 LA - 19 - 4.8/8.4 In Los Angeles along Lakewood Boulevard (LA-019) from Del Amo Boulevard to Gardendale Street. 33 Intersections (86 Curb Ramps) 1000 Linear Feet of New Sidewalks 10 Pedestrian Push Buttons 64 Pedestrian Countdowns at 11 Signalized Intersections 10 Pedestrian Crosswalks Modify Signals, Wheelchair Ramps 1 – 10 220 September 2014 View Details
Has special requirements.
January 20, 2012
8 - 0Q4901 SBD - 40 & 95 - 56.1-64.5 NEAR NEEDLES FR 0.4 W/O OCOTILLO WASH TO 0.3 MI W/O BEAL WASH; SBD 95 PM 56.1/64.5 FR 0.6 MI S/O MORAN DR TO 0.5 MI N/O GOFFS RD REPLACE PAVEMENT Rehabilitate Pavement 1 – 10 30 March 2014 View Details January 02, 2014
6 - 0M820_ FRE - 41/180 - R25.2/R31.7, R58.0 IN FRSNO COUNTY IN FRESNO AT RAMP LOCATIONS OF ABBY AVE, MCKINLEY AVE, SHIELDS AVE, SHAW AVE, HERNDON AVE AND FRIANT AVE. INSTALL CONCRETE BARRIERS Repair Concrete Barrier, Widening 1 – 10 70 May 2014 View Details
Has special requirements.
December 19, 2013
7 - 4Y7004 LA - 405 - 8.7 IN LA, LA-405 @ DOLORES YARD OH PAINT STEEL GIRDERS Clean and Paint Bridge 1 – 10 100 July 2015 View Details
Has special requirements.
January 23, 2013
11 - 288701 IMP - 111 - R04.6/R04.9 IN IMP CNTY NEAR CALEXICO ON SR-111 FROM 0.3 M SOUTH OF RTE 86 ROADWAY WIDENING FOR DEDICATED LEFT AND RIGHT TURN LANES Widening 1 – 10 90 January 0000 View Details
Has special requirements.
June 20, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 293404 LA - 5 - 25.2 /25.9 IN GNDL ON COLORADO BL MEDIAN BARRIER/CURVE CORRECTION Concrete Barrier, Modify Drainage 1 – 10 300 April 2015 View Details January 02, 2013
1 - 0B4304 HUM - 101 - 111.4/ 111.6 IN HUMBOLDT COUNTY NEAR BIG LAGOON FROM 1.9 TO 2.1 MILES NORTH OF GEORGIA PACIFIC RD 1 – 10 December 2013 View Details November 21, 2011
3 - 1A8454 ED - 089 - 024.9/027.2 NEAR TAHOMA FROM MEEKS CREEK BRIDGE TO WILSOM AVENUE. STORM WATER MITIGATION   Asphalt Concrete Surfacing,Reconstruct Culverts,Culverts,Reconstruct Drainage,Earthwork,Rehabilitate Pavement,Repair Roadway,Rock Slope Protection  Reconstruct Drainage, Reconstruct Culverts, Asphalt Concrete Surfacing, Earthwork, Rehabilitate Pavement, Repair Roadway, Rock Slope Protection 1 – 10 110 May 2014 View Details August 16, 2012
8 - 1C4001 RIV - 215 - 22.3-43.2 NEAR PERRIS FROM ROMOLAND FLOOD CONTROL CHANNEL TO SB 215 TO EB 215 CONNECTOR IN RIVERSIDE SANBLAST/CLEAN AND APPLY METHACRYLATE SEALING TO DECK. REPLACE DAMAGED JOINT SEALS. INSTALL G-11 SIGNS. Repair Bridge 1 – 10 April 2014 View Details January 02, 2014
10 - 0W560_ SJ - 12 - 5.1/11.0 IN SAN JOAQUIN COUNTY ON ROUTE 12 NEAR TERMINOUS FROM EAST END OF LITTLE POTATO SLOUGH BRIDGE TO 0.2 MILE EAST OF FLAG CITY BOULEVARD REPAIR STRUCTURAL SECTION Asphalt Concrete Surfacing, Replace Drainage, Reconstruct Guard Railing, Pavements Markers, Pavements Markings, Repair Roadway, Seal Coat, Seal Cracks 1 – 10 October 2014 View Details
Has special requirements.
March 12, 2014
10 - 0W690_ SJ - 4, 4, 5, 99, 99 - 0.0, R15.7/R16.6, 0.0, 3.3/49.1,0.0, 6.6/14.6 ON VARIOUS STATE ROUTES AT THIRTEEN (13) BRIDGES IN SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS REPLACE JOINT SEALS, BEARING PADS, & TREAT BRIDGE DECKS AND TREAT BRIDGE 1 – 10 May 2014 View Details January 17, 2014
6 - 32551_ KIN - 198 - 8.6/9.7 IN LEMOORE ON ROUTE 198 AT 19TH AVENUE LANDSCAPING AND PLANT ESTABLISHMENT Retaining Wall, Irrigation System 1 – 10 160 July 2014 View Details
Has special requirements.
January 03, 2014
1 - 0B8304 MEN - - 047.2/047.4 1 – 10 August 2014 View Details June 12, 2012
1 - 0B3904 HUM - 096 - 008.5/ 008.7 IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4-289 1 – 10 February 2014 View Details March 26, 2012
7 - 278204 LA - 10 - 18.3/46.8 LA CNTY @ VAR LOC ON RTE 10, 14, 30 , 57, 71, 110, 118, 134, 210, & 710 INSTALL ADA CURB RAMPS Wheelchair Ramps 1 – 10 260 August 2013 View Details January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 236504 LA - 210 - 29.5/29.6 IN LA COUTY IN PASADENA AT .06KM E/O SIERRA MADRE VILLA AVE CONSTRUCT PEDESTRIAN OVERCROSSING Bridge 1 – 10 270 February 2020 View Details December 16, 2011
11 - 2M5601 SD - 078 - N17.2/19.2 IN SAN DIEGO COUNTY IN ESCONDIDO FROM LINCOLN PARKWAY TO OAK HILL DRIVE COLD PLANE AND PLACE A HOT MIX ASPHALT OVERLAY Asphalt Concrete Surfacing, Rehabilitate Pavement 1 – 10 90 August 2014 View Details April 17, 2013
8 - 1C8901 RIV - 10 - 110-1530 NEAR AND IN BLYTHE FROM 4.9 MI E/O JCT RTE 177 TO 3.8 MI E/O JCT RTE 78 PLACE POLYESTER OVERLAY, REPLACE JOINT SEALS, REPAIR CONCRETE SPALLS, AND REHAB RAILING Building, Repair Bridge 1 – 10 April 2014 View Details January 02, 2014
1 - 0B5404 MEN - 162 - 013.9/ 022.7 IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.2 MILES WEST OF MID FK EEL RIVER #10-252 TO 2.8 MILES EAST OF SAND BANK CREEK Reconstruct Roadway  Reconstruct Roadway 1 – 10 67 February 2014 View Details
Has special requirements.
August 16, 2012
3 - 1E7604 VAR - 070 - 00.0/00.0 IN MARYSVILLE ON ROUTE 20 FROM I STREET TO F STREET AND ON ROUTE 70 FROM 4TH STREET TO 5TH STREET REMOVE MEDIAN LANES AND INSTALL LEFT TURN LANES AND CHANNELLIZE THRU LANE 1 – 10 August 2015 View Details
Has special requirements.
February 05, 2014
3 - 0E9604 ED - 049 - 11.7/12.4 NEAR PLACERVILLE FROM PLEASANT VALLEY ROAD TO BRADLEY DRIVE (KP 18.8/20.0) REALIGN AND REDESIGNATE ROADWAY 1 – 10 June 2015 View Details December 04, 2013
7 - 281604 VEN - 118 - 15.9 /16.5 IN VENTURA COUNTY IN MOORPARK JUST WEST OF GABBERT ROAD ROAD WIDENING Widening 1 – 10 300 August 2014 View Details
Has special requirements.
February 03, 2012
5 - 0S250_ SB - 101 - 13.2/27.1 IN AND NEAR THE CITIES OF SANTA BARBARA AND GOLETA, FROM SALSIPUEDES STREET TO 0.3 MILES NORTH OF CATHERAL OAKS ROAD ROADSIDE SAFETY IMPROVEMENTS Signs, Lighting 1 – 10 50 February 2015 View Details April 22, 2014
7 - 203804 LA - 118 - 4.8R/4.8R IN LA CNTY ON W/B RTE 118 AT TAMPA AVE OFF-RAMP WIDENING OFF-RAMP, ADDING AUX LN Sound Wall, Retaining Wall, Widening 1 – 10 250 April 2017 View Details February 03, 2012
6 - 0E340_ KER - 99 - 21.6/24.7 IN KER CO IN BAKERSFIELD AT VARIOUS LOCATIONS FROM THE PLANZ RD OC TO 0.1 MI NORTH OF THE CA AVE UC (KP 34.8/39.7) FREEWAY MAINTENANCE ACCESS 1 – 10 March 2015 View Details April 10, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
5 - 1C330_ MON - 101 - 57.1/60.8 IN MONTEREY COUNTY SOUTH OF SOLEDAD ON ROUTE 101 FROM 1.2 MILES NORTH OF HUDSON ROAD TO SALINAS RIVER BRIDGE (BR NO. 44-02) CONSTRUCT MEDIAN BARRIER AND RUMBLE STRIPS Asphalt Concrete Surfacing 1 – 10 80 June 2014 View Details
Has special requirements.
April 08, 2014
11 - 298201 SD - 905 - 06.2 /10.6 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE WEST OF CALIENTE AVE. TO SR-125. ROADWAY REHABILITATION Rehabilitate Pavement 1 – 10 120 May 2014 View Details January 13, 2014
11 - 408501 SD - 125 - 09.7 /12.1 IN SAN DIEGO COUNTY NEAR SAN DIEGO AND IN LEMON GROVE FROM EKELTON PLACE UNDERCROSSING TO TROY STREET OVERCROSSING. INSTALL MEDIAN BARRIER Concrete Barrier 1 – 10 90 July 2014 View Details January 13, 2014
7 - 280704 LA - 101 - 25.3 IN LA/VEN COUNTY BETWEEN RTE 27 AND RTE 23 BRIDGE CONSTRUCTION Bridge 1 – 10 400 July 2013 View Details December 14, 2009
6 - 0Q580_ KER - 5 - R15.8/82.3 IN KERN COUNTY ON ROUTES 5, 99, 58 AND 204 AT VARIOUS LOCATIONS WIRE THEFT RESTORATION Pumping Plant Equipment, Electrical Facilities 1 – 10 120 October 2014 View Details
Has special requirements.
January 03, 2014
2 - 2E7404 SHA - 299 - 083.0/ 084.0 NEAR BURNEY FROM 1.0 MILE WEST OF HAT CREEK BRIDGE TO HAT CREEK BRIDGE. CURVE IMPROVEMENT Realignment, Realign Curve, Grading and Paving, Earthwork 1 – 10 120 April 2014 View Details August 16, 2012
7 - 276104 LA - 110 - 3.8 /6.5 IN LA COUNTY ON LA 110, FROM PACIFIC COAST HIGHWAY TO 223RD STRET OC GROSS SOLID REMOVAL DEVICES AND OTHER PERMANENT TREATMENT BMP'S Reconstruct Drainage, Retaining Wall 1 – 10 350 February 2015 View Details February 07, 2012
6 - 0N960_ KER - 204 - 5.4/6.7 ON ROUTE 204 GOLDEN STATE AVENUE BETWEEN SR-99 AND SR-178 IN KERN COUNTY AT VARIOUS LOCATIONS PLACE DECK OVERLAY, REPLACE JOINT SEALS & PAINT 1 – 10 May 2015 View Details April 10, 2014
7 - 290404 VEN - 101 - 29.9 IN VEN AT ASH ST POC (PM 29.9) UPGRADE ADA RAMPS & ACCESSIBILITY 1 – 10 500 January 2016 View Details January 27, 2012
11 - 401401 SD - 005 - R12.6/R72.2 IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS REMOVE EXISTING MBGR AND REPLACE WITH CONCRETE BARRIER AND UPGRADE Remove Guard Railing, Concrete Barrier 1 – 10 125 August 2013 View Details June 24, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
11 - 287901 SD - 094 - 32.8 /40.3 IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 1.0 MILE WEST OF COCHERA VIA DRIVE TO 1.0 MILE WEST OF POTRERO VALLEY ROAD. RECONSTRUCT METAL BEAM GUARD RAIL AND END TREATMENT Reconstruct Guard Railing 1 – 10 90 September 2013 View Details December 09, 2013
11 - 2M6501 IMP - 86 - 043.1/067.8 IN IMPERIAL COUNTY NEAR SALTON CITY FROM 0.5 MILE SOUTH OF NORTH JUNCTI ON ROUTE 78 TO RIVERSIDE COUNTY LINE APPLY ASPHALT RUBBER CHIP SEAL Rehabilitate Pavement, Seal Coat 1 – 10 250 May 2015 View Details April 17, 2013
11 - 409601 SD - 054 - 0.0/13.0 Roadside Safety Improvement Widening 1 – 10 180 July 2015 View Details October 08, 2014
11 - 263901 SD - 805 - 010.0/010.6 IN SAN DIEGO COUNTY IN NATIONAL CITY FROM 0.5 KM SOUTH TO 0.5 KM NORTH OF PLAZA BOULEVARD UNDERCROSSING REVISE INTERCHANGE Modify Interchange 1 – 10 125 April 2018 View Details
Has special requirements.
April 17, 2013
6 - 0J530_ TUL - 190 - 20.9/21.3 ON ROUTE 190, IN TURLARE COUNTY, NEAR PORTERVILLE BETWEEN 0.2 MILE WEST OF ROAD 284 AND 0.2 MILE EAST OF ROAD 284 INTERSECTION IMPROVEMENT Drainage, Flashing Beacons, Grading and Paving, Roadway 1 – 10 55 July 2015 View Details
Has special requirements.
March 12, 2014
6 - 0M050_ FRE - 168 - T29.0/T29.4 IN FRESNO COUNTY, NEAR PRATHER FROM 1.2 MILES WEST OF AUBERRY ROAD TO 0.8 MILES WEST OF AUBERRY ROAD REALIGN CURVE Drainage, Earthwork, Realign Curve 1 – 10 80 August 2014 View Details
Has special requirements.
December 19, 2013
7 - 3X0204 Ven - 150 - 27.4/29.4 Near Sulphur Springs, between Camp Bartlett and Rancho La Cuesta. Construct soldier pile walls Repair Slope, Retaining Wall 1 – 10 250 June 2013 View Details January 23, 2013
12 - 0J4401 ORA - 405 - 0.0/24.2 IN ORANGE COUNTY. I-5 IN IRVINE TO I-605 IN SEAL BEACH REMOVE EXISTED HOV BUFFER. RESTRIPE FREEWAY TO PROVIDE A CONTINUOUS HOV ACCESS, STANDARD GP LN & SHOULDERS 1 – 10 June 2013 View Details November 30, 2011
7 - 220504 LA - 001 - 23.7/23.9 IN MANB/ESEG FROM 33RD STREET /ROSECRANS AVENUE ROADWAY WIDENING 1 – 10 270 June 2014 View Details January 23, 2013
7 - 259404 LA - 210 - 00.0/09.8 LA COUNTY, CITY OF LA/SAN FERNANDO & LA CANADA FLINTRIDGE AT VAR LOC STORM WATER MITIGATION (TRASH TMDL) 1 – 10 520 September 2015 View Details January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
6 - 43260_ FRE - 33 - 10.9/11.1 IN FRESNO COUNTY 4 MILES EAST OF CITY OF COALINGA AT JACALITOS CREEK BRIDGE BRIDGE REPLACEMENT 1 – 10 June 2014 View Details January 03, 2014
11 - 401100 SD - 15 - 005.6/006.1 IN SAN DIEGO COUNTY, IN SAN DIEGO, FROM THE ADAMS AVENUE OVER CROSSING TO 0.5 MILES NORTH OF THE ADAMS AVENUE OVERCROSSING PAVEMENT REHABILITATION Rehabilitate Pavement 1 – 10 250 May 2014 View Details June 24, 2013
7 - 277904 VEN - 23 - 22.8/23.5 In Ventura County Between Guiberson Road and Santa Clara River DRAINAGE SYSTEM RESTORATION Repair Culverts 1 – 10 200 December 2014 View Details January 23, 2013
1 - 0B3104 DN - 199 - 008.7/ IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1-8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND   1 – 10 January 2014 View Details June 25, 2012
7 - 4H9004 LA - 060 - 20.6/ IN LA COUNTY IN ROWLAND HEIGHTS FROM W/B OFF-RAMP TO NOGALES STREET WIDEN OFF-RAMP Widening, Modify Interchange 1 – 10 190 July 2013 View Details January 23, 2013
1 - 0B0804 DN - 101 - R004.4/009.4 1 – 10 December 2013 View Details August 02, 2012
1 - 0B3004 DN - 101 - 022.0/ IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070   1 – 10 December 2013 View Details November 21, 2011
8 - 3348V1 RIV - 215 - 37.4/38.5 RIV-60-12.4/14.0; IN RIVERSIDE ON RTE 215 FROM EUCALYPTUS AVENUE TO 215/60 INTERCHANGE, AND ON ROUTE 60 E/O 215/60 INTERCHANGE TO W/O 215/60 INTERCHANGE REPLACEMENT HIGHWAY PLANTING Highway Planting 1 – 10 250 April 2014 View Details August 08, 2013
7 - 276004 VEN - 101 - 14.0/21.0 15 LOC AT VEN CNTY RTE 101 TMDL IMP (PROV STRCT BMP'S RTE 101 IN TRSH) PSSR FOR BMP'S IN VEN TRASH TMDL Modify Drainage, Erosion Control 1 – 10 200 December 2014 View Details
Has special requirements.
February 17, 2012
11 - 2M4401 IMP - 111 - 040.5/065.4 IN IMPERIAL COUNTY NEAR NILAND FROM MAIN STREET TO IMPERIAL COUNTY LINE PROFILE GRIND AR CHIP SEAL AND WARM MIX ASPHALT Slurry Seal Coat, Grading and Paving 1 – 10 180 February 2014 View Details September 13, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
10 - 0T820_ SJ - 5 - 0.0 ON ROUTES 4, 6, 12 AND 26 AT VARIOUS LOCATIONS IN SAN JOAQUIN COUNTY INSTALL ADA CURB RAMPS 1 – 10 July 2014 View Details April 10, 2014
11 - 408901 SD - 5 - R.54.4/R72.2 IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS CLEAN AND TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEALS Replace Joint Seals, Rehabilitate Bridge Deck 1 – 10 180 May 2013 View Details April 18, 2013
7 - 276904 LA - 210 - 17.7/20.3 IN LA CNTY IN LA ON S/B RTE 170 FR VANOWEN ST TO SHELDON ST, EROSION CONTROL 1 – 10 250 April 2015 View Details
Has special requirements.
October 07, 2010
1 - 488604 LAK - 020 - 008.1/ 008.6 IN LAKE COUNTY NEAR UPPER LAKE AT THE INTERSECTION OF ROUTES 20/29 Asphalt Concrete Surfacing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Flashing Beacons,Grading and Paving,Highway Planting,Lighting,Pavement Markers,Pavement Markings,Realignment,Signals,Widening  Asphalt Concrete Surfacing, Culverts, Channelize, Electrical Facilities, Erosion Control, Flashing Beacons, Grading and Paving, Highway Planting, Lighting, Drainage, Earthwork, Pavements Markers, Pavements Markings, Realignment, Signals, Widening 1 – 10 110 May 2014 View Details
Has special requirements.
August 06, 2012
5 - 33076_ SB - 46 - 36.6/41.2 IN SAN LUIS OBISPO COUNTY NEAR PASO ROBLES FROM 0.5 MILES EAST OF GENESEO ROAD TO 0.2 MILE WEST OF ALMOND DRIVE LANDSCAPE MITIGATION 1 – 10 April 2014 View Details January 16, 2014
11 - 260411 SD - 008 - 37.8R/39.4R Drainage Improvements Modify Drainage 1 – 10 250 March 2015 View Details August 21, 2014
1 - 0A4904 HUM - 299 - 025.0/ 025.7 IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD Curve Improvement 1 – 10 120 July 2014 View Details
Has special requirements.
August 02, 2012
1 - 0B3404 HUM - 036 - 022.8/ 027.7 IN HUMBOLDT COUNTY NEAR SWAINS FLAT FROM 1.3 MILES WEST TO 3.9 MILES WEST OF VAN DUZEN RIVER BR#4-293 Asphalt Concrete Surfacing,Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Repair Storm Damage,Rock Slope Protection  Drainage, Asphalt Concrete Surfacing, Earthwork, Repair Storm Damage, Pavements Markings, Pavements Markers, Erosion Control, Rock Slope Protection 1 – 10 90-130 December 2013 View Details August 16, 2012
8 - 1C1301 RIV - 111 - 47.2-50 IN PALM SPRINGS FROM ELKS DR TO NORTH HERMOSA DR REHABILITATE MAINLINE PAVEMENT Rehabilitate Pavement 1 – 10 March 2014 View Details January 02, 2014
3 - 0F3704 GLE - 005 - 15.92/28.56 ABOUT 14 MILES NORTH OF WILLOWS AT COUNTY ROAD 16 OVERCROSSING, COUNTY ROAD 7 OVERCROSSING, AND COUNTY ROAD 3 OVERCROSSING RAISE STRUCTURE OR LOWER ROADWAY PROFILE TO IMPROVE VERTICAL CLEARANCE 1 – 10 August 2015 View Details December 04, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
11 - 287701 SD - - IN SAN DIEGO COUNTY IN SAN DIEGO AT THE KEARNY MESA MATERIALS LAB UPGRADE MATERIALS LAB FACILITY Building 1 – 10 250 June 2013 View Details
Has special requirements.
April 17, 2013
4 - 1SS024 ALA - 13 - 8.3 IN ALAMEDA COUNTY ON ROUTE 13 IN OAKLAND AT MORGAN AVENUE INSTALL TIEBACK RETAINING WALL Earthwork, Retaining Wall 1 – 10 200 September 2014 View Details
Has special requirements.
July 01, 2014
6 - 0H630_ TUL - 198 - R12.0 ON ROUTE 198 AT VISTA AVENUE PEDESTRIAN OVERCROSSING ADA COMPLIANCE UPGRADES Replace Overcrossing 1 – 10 220 August 2014 View Details
Has special requirements.
December 19, 2013
6 - 0H640_ KER - 99/178 - 49.6, R4.4 ON ROUTE 99 AND 178 IN KERN COUNTY AT KERN AVENUE PEDESTRIAN OC ON ROUTE 99, PM 49.6 & SUNNY LANE PEDESTRIAN OC ON ROUTE 178, PM R4.4 ADA COMPLIANCE UPGRADES Replace Overcrossing 1 – 10 250 August 2014 View Details
Has special requirements.
March 12, 2014
7 - 291104 LA - 101 - 30.9/38.2 IN LA FR CALBASAS/AGURA HILLS INSTL & MODIFY ADA RAMPS,CONST SIDEWALKS, ADA IMPROVEMENTS Modify Signals, Wheelchair Ramps 1 – 10 250 October 2015 View Details
Has special requirements.
January 23, 2013
7 - 3X0004 Ven - 33 - 15.7/15.8 In Meiners Oaks, near North Folk Matilija Creek. Construct soldier pile wall with tie-backs. Retaining Wall 1 – 10 300 August 2013 View Details January 23, 2013
4 - 4S0504 SCL - 9 - 4.2 IN SANTA CLARA COUNTY ON ROUTE 9 NORTH OF SARATOGA GAP 0.8 MILES WEST OF SANBORN ROAD CONSTRUCT TIE-BACK WALL Retaining Wall 1 – 10 120 August 2014 View Details July 01, 2014
11 - 407601 SD - 052 - 2.3 Upgrade Bridge Rail Trreatment Modify Guard Railing, Modify Bridge Railing 1 – 10 60 September 2015 View Details October 08, 2014
11 - 409801 SD - 078 - 0.6/10.9 Roadside Safety Improvement Widening 1 – 10 180 December 2015 View Details October 08, 2014
11 - 406401 SD - 078 - 1.3/1.3 Upgrade Bridge Rail End Treatment Type 8 Modify Bridge Railing, Modify Guard Railing 1 – 10 90 November 2015 View Details October 08, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 282704 LA - 101 - 00.0/39.5 IN LA FR JCT ST 5 TO CNTY LN INSTALL MBGR - GAP CLOSURES Guard Railing 1 – 10 250 March 2015 View Details February 07, 2012
7 - 291304 VEN - 33 - 7.6 IN VEN CNTY ON RTE 33 AT SAN ANTONIO CREEK SUB-SCOUR MIT AND RAILING UPGRADE Repair Bridge, Replace Bridge Railing 1 – 10 600 August 2016 View Details
Has special requirements.
November 09, 2012
1 - 0B4204 HUM - 101 - 110.6/ IN HUMBOLDT COUNTY NEAR TRINIDAD AT 1.9 MILES SOUTH OF KANE ROAD AND AT 1.3 MILES NORTH OF KANE ROAD Repair Storm Damage Repair Storm Damage 1 – 10 30 January 2014 View Details August 16, 2012
7 - 240704 LA - VAR - VAR IN LOS ANGELES COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS Install new Highway Advisory Radio (HAR) systems and upgrade the existing HARs and HAR flashing beacon signs. 1 – 10 600 October 2016 View Details
Has special requirements.
January 30, 2013
5 - 1C900_ SLO - 46 - 50.2/60.9 IN SAN LUIS OBISPO COUNTY NEAR CHOLAME FROM 0.3 MILES WEST OF LUCY BROWN ROAD TO KERN COUNTY LINE PAVEMENT PRESERVATION Pavements Markings, Rehabilitate Pavement, Pavements Markers, Guard Railing, Asphalt Concrete Surfacing 1 – 10 80 October 2014 View Details
Has special requirements.
January 16, 2014
7 - 280304 LA - 5 - 16.2 /63.4 IN LOS ANGELES CNTY AT VAR LOC (LA-5, 10, 101, 110, 134, 170, 405) INSTALL ADA CURB RAMPS Wheelchair Ramps 1 – 10 130 June 2014 View Details January 23, 2013
7 - 291404 LA - 1 - 56.0/58.0 IN MAL AT TRANCAS CREEK BRIDGE (53- 0027) BRIDGE REPLACEMENT Replace Bridge 1 – 10 300 January 2018 View Details
Has special requirements.
February 08, 2013
12 - 0L7601 ORA - 405 - 1.5/24.1 OC. ON I-405 AT PM 1.5/24.1 & ON VARIOUS RTES AT VARIOUS POSTMILES. PLACE METHACRYLATE DECK SEAL TREATMENT, POLYESTER CONCRETE OVERLAY, JOINT SEALS 1 – 10 April 2012 View Details November 30, 2011
12 - 0H1601 ORA - 1 - 25.9/33.7 N SR-1 FROM GOLDENWEST ST TO LOS ANGELES/ORANGE COUNTY LINE CAPITAL PREVENTIVE MAINTENANCE - RESURFACE THE PAVEMENTS 1 – 10 June 2013 View Details November 30, 2011
4 - 0G7104 SM - 280 - R21.3 IN SAN MATEO COUNTY ON ROUTE 280 IN SAN BRUNO AT THE SNEATH LANE OVERCROSSING BRIDGE SEISMIC RETROFIT Modify Bridge 1 – 10 240 July 2014 View Details July 01, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
1 - 0B3704 HUM - 036 - 044.4/ IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT- TRINITY COUNTY LINE   Asphalt Concrete Surfacing,Earthwork,Erosion Control  Erosion Control, Earthwork, Asphalt Concrete Surfacing 1 – 10 50 December 2013 View Details August 16, 2012
1 - 0B4004 HUM - 101 - R015.0/ IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4-213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4-117 Repair Storm Damage Repair Storm Damage 1 – 10 30 December 2013 View Details August 16, 2012
3 - 1F2604 SIE - 89 - 000.0/002.3 IN SIERRA COUNTY ON ROUTE 89 FROM NEVADA COUNTY LINE TO LITTLE TRUCKEE RIVER BRIDGE 13-09 1 – 10 April 2014 View Details
Has special requirements.
January 31, 2014
3 - 0F6904 BUT - 070 - 024.3/ ABOUT 9.5 MILES EAST OF OROVILLE AT FLAG CANYON CREEK BRIDGE 12-140   REPLACE BRIDGE Culverts, Earthwork, Erosion Control, Flashing Beacons, Grading and Paving, Pavements Markers, Pavements Markings, Rock Slope Protection, Slurry Seal Coat, Asphalt Concrete Surfacing, Replace Bridge 1 – 10 230 October 2014 View Details November 06, 2013
1 - 474904 MEN - 001 - 070.5/ IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE Repair Slope,Repair Storm Damage Repair Slope, Repair Storm Damage 1 – 10 45 December 2012 View Details March 26, 2012
7 - 284501 LA - 2 - 14.2/23.1 In Antelope Valley at the Lamont Odett Vista Point. Install lighting, native vegetation, and interpretive signs, and provide stormwater mitigation. Highway Planting, Lighting 1 – 10 100 October 2013 View Details December 28, 2010
12 - 0M3601 ORA - 55 - 2.0/11.8 SR-55 FROM 19TH ST IN COSTA MESA TO 17TH ST. IN SANTA ANA. CONSTRUCT CONCRETE MEDIAN BARRIER IN PLACE OF TEMPORARY K-RAIL TO CLOSE GAPS 1 – 10 April 2013 View Details November 30, 2011
7 - 127244 LA - 138 - 59.7/60.2 IN LA CNTY IN PMDL FR 126TH ST E TO LONGVIEW RD(SEG 9) WIDEN CONVENTIONAL HIGHWAY Widening 1 – 10 200 November 2014 View Details February 03, 2012
7 - 260404 LA - 039 - 31.0/33.0 IN LA COUNTY AT THE NF SAN GABRIEL BRIDGE BRIDGE SCOUR MITIGATION Replace Bridge Railing, Repair Bridge 1 – 10 360 December 2015 View Details January 23, 2013
7 - 294604 LA - 101 - 0.0/1.4 IN LA CTY FR E/7TH ST TO N/FIGUEROA ST ROADSIDE SAFETY IMPROVEMENTS Erosion Control, Highway Planting, Modify Bridge Railing 1 – 10 250 April 2015 View Details
Has special requirements.
January 30, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
2 - 3E7904 TRI - 299 - 012.3/ 012.7 IN TRINITY COUNTY NEAR BURNT RANCH FROM 1.4 MILES TO 1.1 MILES WEST OF MILL CREEK ROAD. Realignment  Realignment 1 – 10 170 May 2014 View Details
Has special requirements.
August 16, 2012
7 - 250304 LA - 126 - 00.0/04.6 IN LA COUNTY FROM COUNTY LN TO COMMERCE CTR DR IC MODIFY INTERSECTIONS 1 – 10 210 May 2015 View Details February 03, 2012
7 - 251904 VEN - 101 - 40.4R/43.6R IN VEN COUNTY FROM .6M N/O MOBIL PIER UC TO VEN/SBRA COUNTY LINE PAVEMENT REHABILITATION Asphalt Concrete Surfacing, Groove Pavement, Replace PCC Pavement 1 – 10 280 November 2013 View Details February 03, 2012
3 - 4M5804 SAC - 160 - R044.5/ 047.1 IN THE CITY AND COUNTY OF SACRAMENTO FROM AMERICAN RIVER BRIDGE 24-001 TO 0.8 MILE NORTH OF TRIBUTE ROAD 1 – 10 February 2013 View Details December 20, 2011
7 - 290004 LA - 405 - 13.2 /21.2 IN LA CNTY ON 1-405 BTWWN VRMNT AVE PM13.28 & NB OFF-RAMP TO NB CLLTR, INSTALL CONCRETE BARRIER & UPGRADE EXISTING MBGR Replace Guard Railing, Concrete Barrier 1 – 10 350 September 2016 View Details
Has special requirements.
May 24, 2012
7 - 2759U4 LA - 110 - 23.5/23.9 IN LA CNTY IN LA ON N/B RTE 110 AT THE RTE 101 IC SOURCE CONTROL Erosion Control, Highway Planting 1 – 10 250 July 2013 View Details
Has special requirements.
January 30, 2013
11 - 2M4901 SD - 079 - 35.1 /53.0 IN SD COUNTY AT WARNER SPRING, SUNSHINE SUMMIT AND OAK GROVE FROM APPLY RAC OVERLAY Rehabilitate Pavement, Asphalt Concrete Surfacing 1 – 10 45-60 January 2014 View Details
Has special requirements.
September 13, 2013
7 - 278804 LA - 5 - 54.4R/54.8R IN LOS ANGELES COUNTY IN SCTA BETWEEN RYE CANYON ROAD AND RTE 5/126 IC UPGRADE WEIGH STATION Modify Scale Facility 1 – 10 150 April 2013 View Details January 23, 2013
7 - 257104 LA - 001 - 01.0/01.0 IN LA COUNTY AT VARIOUS LOCATIONS/RTS UPGRADE TCRMS-INST CHNGBL MESSG SIGN 1 – 10 580 March 2015 View Details
Has special requirements.
January 30, 2013
7 - 264904 LA - 001 - 23.7/23.8 LA COUNTY, MANHATTAN UC BRIDGE 53-00 62 I MANHATTAN BEACH CITY BRIDGE SEISMIC RESTORATION 1 – 10 280 July 2014 View Details February 07, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 256604 L - 010 - 00.0/48.2 LA COUNTY IN LA ON ROUTE 10 VARIOUS LOCATIONS SAFETY LIGHTING CONVERSION 1 – 10 230 January 2014 View Details December 16, 2011
3 - 4E5404 SIE - 049 - 048.3/ 049.2 ABOUT 10 MILES SOUTH OF LOYALTON FROM 0.5 MILE TO 1.3 MILES NORTH OF LEMON CANYON ROAD UPGRADE CULVERTS AND PAVE LOW SPOTS. Modify Culverts Asphalt Concrete Surfacing, Culverts 1 – 10 50 January 2013 View Details June 12, 2012
11 - 2M6401 SD - 67 - R 005.8/R 018.5 IN SAN DIEGO COUNTY IN AND NEAR SANTEE AND POWAY FROM SAN DIEGO RIVER BRIDGE TO ARCHIE MOORE ROAD REPLACE ASPHALT CONCRETE SURFACING Asphalt Concrete Surfacing, Rehabilitate Pavement 1 – 10 180 December 2016 View Details April 17, 2013
12 - 0H20U1 ORA - 55 - 2.0/5.9 IN ORANGE COUNTY ON RTE 55 FROM 17 TH STREET TO RTE 405 AND ON RTE 73 (PM 10.0/15.20,23.4/27.8) FROM RTE5 TO GLENWOOD DRIVE AND FROM BISON AVENUE TO RTE 405 REMOVE DISEASED TREES AND UPGRADE HIGHWAY PLANTING 1 – 10 November 2013 View Details November 30, 2011
12 - 0L3801 ORA - 39 - 1.1/19.6 ON SR-39 FROM INDIANAPOLIS TO IMPERIAL HWY. INSTALL NEW & UPGRADE CURB RAMPS AT VARIOUS LOCATIONS 1 – 10 May 2013 View Details November 30, 2011
7 - 225904 LA - 101 - 24.7/25.8 IN LOS ANGELES AT NORTHBOUND EXIT TO CANOGA AVENUE & SOUTHBOUND EXIT VENTURA/TOPANGA CANYON BOULEVARD Widen exit ramps Modify Ramp 1 – 10 290 March 2014 View Details February 07, 2012
1 - 0B5104 MEN - 101 - R087.4/R100.4 IN MENDOCINO COUNTY ABOUT 18 MILES NORTH OF LAYTONVILLE FROM 0.3 MI SOUTH OF THE ROUTE 101/271 JUNCTION TO RED MOUNTAIN CREEK BR#10-35 Earthwork,Retaining Wall,Reconstruct Roadway  Earthwork, Reconstruct Roadway, Seal Cracks 1 – 10 100. January 2014 View Details
Has special requirements.
August 16, 2012
9 - 35120_ INY - 395 - R20.3/R22.3 ON US 395 IN INYO COUNTY FROM ROSE VALLEY RANCH ROAD (PM 20.3)TO 1.0 MILES NORTH OF LA AQUEDUCT BRIDGE #48-15L (PM 22.3) SHOULDER WIDENING AND CONSTRUCT RUMBLE STRIP 1 – 10 March 2015 View Details April 10, 2014
7 - 3X7104 LA - 60 - 7.7 @ PARAMOUNT BL OC REALIGN RAMP & APPROACHES TO NEW BR Reconstruct Ramp 1 – 10 250 May 2014 View Details
Has special requirements.
January 30, 2013
11 - 296901 SD - 54 - T 011.0/T 014.2 IN SAN DIEGO COUNTY FROM ROUTE 94 TO GROVE ROAD PLACE MICROSURFACING Rehabilitate Pavement 1 – 10 180 January 2016 View Details June 20, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0L6401 ORA - 1 - 23.7/25.9 OC. IN HUNTINGTON BEACH FROM BEACH BLVD TO GOLDEN WEST AVE. RHMA-TYPE G OVERLAY 1 – 10 December 2011 View Details November 30, 2011
11 - 2M6601 IMP - 98 - 032.3/039.6 IN IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111 TO ROUTE 7 APPLY ASPHALT RUBBER CHIP SEAL Rehabilitate Pavement, Asphalt Concrete Surfacing 1 – 10 180 February 2014 View Details September 13, 2013
10 - 0A830_ SJ - 88 - 6.1/8.9 ON ROUTE 88 IN SAN JOAQUIN COUNTY AT THE CALAVERAS RIVER, MOSHER SHOUGH AND BEAR CREEK BRIDGES (KP 9.8/15.0) UPGRADE BRIDGE APPROACH GUARDRAIL AND EXTEND CULVERTS 4 LOCATIONS Modify Guard Railing, Modify Culverts 1 – 10 70 September 2014 View Details
Has special requirements.
April 22, 2014
3 - 3F0004 YUB - 020 - 013.3/020.3 ABOUT 12 MILES EAST OF MARYSVILLE FROM MARYSVILLE ROAD TO 0.3 MILE EAST OF LOWER SMARTVILLE ROAD 1 – 10 September 2014 View Details August 02, 2012
5 - 0161H_ MON - 101 - R91.2/100.4 IN AND NEAR SALINAS, FROM BORONDA ROAD TO SOUTH OF SAN JUAN ROAD LANDSCAPE MITGATION Highway Planting, Irrigation System 1 – 10 1000 June 2015 View Details
Has special requirements.
April 22, 2014
7 - 000001 LA - VAR - VAR In Los Angeles County on various routes. 7 Pavement Rehabilitation Projects (Profile grinding, Replace Slabs, HMA, RHMA, sealing, etc.) Slurry Seal Coat, Asphalt Concrete Surfacing, Groove Pavement, Seal Cracks 1 – 10 January 2013 View Details
Has special requirements.
January 14, 2013
12 - 0L6001 ORA - 39 - 8.8/12.4 OC. IN ANAHEIM AND STANTON FROM ACACIA AVE. TO LINCOLN AVE. REMOVE AND REPLACE RHMA-TYPE O 1 – 10 February 2012 View Details November 30, 2011
11 - 294201 IMP - 86 - 001.9/ 002.3 IN IMPERIAL COUNTY NEAR CALEXICO FROM 0.2 MILE EAST TO 0.2 MILE WEST OF DOGWOOD ROAD INTERSECTION ROADWAY WIDENING AND INSTALLATION OF TRAFFIC SIGNALS Signals, Widening 1 – 10 125 January 0000 View Details August 20, 2014
7 - 292304 LA - 5 - 25.6 IN LA NB LA-5 OFF-RAMP TO COLORADO FWY EXTENTION WIDENING OFF-RAMP AND BRIDGE Widening 1 – 10 250 January 2017 View Details
Has special requirements.
February 22, 2013
7 - 289904 LA - 19 - 4.0/8.4 IN LA, ALONG LA 19 UPGRADE CURB RAMPS ADD SIDEWALKS UPGRADE CURB RAMPS AND SIDEWALKS 1 – 10 400 September 2014 View Details
Has special requirements.
January 27, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 274804 LA - 18 - 0.1 /0.1 IN LA CNTY ON RTE 18 REPLACE BRIDGE DECK AND RAIL 1 – 10 400 August 2013 View Details December 16, 2011
7 - 2768U4 LA - 210 - 0.8R/04.9R IN LA CNTY IN LA ON S/B RTE 210 FR MACLAY AVE TO YARNELL ST EROSION CONTROL Erosion Control, Highway Planting 1 – 10 250 June 2013 View Details
Has special requirements.
January 23, 2013
7 - 274904 LA - 110 - 23.5/23.9 IN LA CNTY IN LA ON S/B RTE 110 AT THE RTE 101 IC SOURCE CONTROL Erosion Control, Highway Planting 1 – 10 250 August 2013 View Details
Has special requirements.
January 23, 2013
6 - 0P150_ KIN - 198 - 0.0/7.2 ON ROUTE 198 FROM FRESNO/KINGS COUNTY LINE TO 0.04 MILE EAST OF THE SOUTH ROSSI OVERHEAD OVERLAY 2R Asphalt Concrete Surfacing 1 – 10 75 November 2014 View Details December 19, 2013
10 - 0J920_ SJ - 12 - 0.0 ON STATE ROUTE 12 ON MOKELUMNE RIVER BRIDGE IN SAN JOAQUIN COUNTY AT PM 0.01 REPLACE DAMAGED BEAM AND CONTROL HOUSE Guard Railing, Signs, Flashing Beacons, Modify Building, Modify Bridge, Erosion Control, Water Supply System 1 – 10 125 April 2014 View Details
Has special requirements.
March 20, 2014
7 - 287304 LA - 210 - 39.8/41.9 IN LA CNTY IN AZUSA FR AZUSA AVE TO BIG DALTON WASH STORM WATER SOURCE CONTROL Highway Planting, Erosion Control, Reconstruct Drainage, Irrigation System 1 – 10 1000 September 2014 View Details
Has special requirements.
January 23, 2012
5 - 0T640_ SBT - 25 - 18.8/19.5 IN SAN BENITO COUNTY ABOUT 32 MILES SOUTH OF HOLLISTER FROM 0.8 MILE NORTH OF SAN BENITO LATERAL TO 2 MILES SOUTH OF ROUTE 146 CURVE CORRECTION Asphalt Concrete Surfacing, Realign Curve 1 – 10 120 August 2014 View Details January 16, 2014
5 - 1A730_ MON - 101 - 49.8/55.3 ON ROUTE 101 IN AND NEAR GREENFIELD FROM LAGOMARSINO AVENUE TO 0.7 MILE SOUTH OF HUDSON ROAD PAVEMENT PRESERVATION (CAPM) Earthwork, Expressway, Freeway, Guard Railing, Pavements Markers, Pavements Markings, Ramp, Replace PCC Pavement, Asphalt Concrete Surfacing, Concrete Barrier, Drainage, Wheelchair Ramps, Roadway 1 – 10 125 June 2014 View Details January 16, 2014
7 - 283804 LA - 101 - 1.4 /15.6 IN LOS ANGELES COUNTY IN AT VARIOUS LOCATIONS VINE PLANTING TRANS ENHANCEMENT Highway Planting 1 – 10 200 November 2015 View Details April 01, 2010
7 - 129994 LA - 30 - 00.0R/02.7 IN GEDR/LVN FROM JCT 210/66 AND LA-60; R25.4/30.5 AND LA-71; RI.3-R4.8 INSTALL COMM/TOS #4 FIELD HARDWARE Electrical Facilities 1 – 10 480 September 2014 View Details January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
1 - 0B4604 HUM - 299 - 032.0/ IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4-115 1 – 10 December 2013 View Details November 21, 2011
7 - 259204 LA - 010 - 05.5R/14.8 LA COUNTY IN LA @ BALLONA CREEK METALS AND TOXICS TMDL SAND FILTERS AND INFILTRATION DEVICES 1 – 10 200 June 2013 View Details January 23, 2013
7 - 120944 LA - 710 - 15.7R/27.5 IN LYNWOOD TO ALHAMBRA FROM 105 TO VALLEY BOULEVARD INSTALL COMMUNICATION SYSTEMS Electrical Facilities 1 – 10 400 October 2015 View Details January 23, 2013
7 - 226504 LA - 001 - 00.0/34.0 LA/VEN AT VARIOUS LOCATION ON ALL UC AND OC STRUCTURES INST. VERT CLEARANCE AND WARNING SIGNS 1 – 10 410 December 2014 View Details January 23, 2013
7 - 265904 LA - 101 - 01.0/11.0 LA COUNTY IN LA BETWEEN GRAND AVENUE AND VINELAND AVENUE UPGRADE BRIDGE RAILS Replace Bridge Railing 1 – 10 340 April 2013 View Details January 23, 2013
7 - 256704 LA - 005 - 44.4/46.5 IN LA COUNTY IN LA ON RTE 5, 10, 14, AND 60 (VARIOUS LOCATIONS) SAFETY LIGHTING CONVERSION 1 – 10 230 January 2016 View Details February 07, 2012
7 - 256504 LA - 405 - 00.0/48.6 LA COUNTY IN LA ON RTE 405 VARIOUS LOCATIONS SAFETY LIGHTING CONVERSION 1 – 10 420 October 2015 View Details January 23, 2013
7 - 258404 LA - 5 - 16.5 IN LA NAD BURBANK FROM RTE 60 TO RTE 170 STORM WATER MITIGATION (TRASH TMDL) Reconstruct Drainage 1 – 10 180 January 2015 View Details
Has special requirements.
February 17, 2012
7 - 206904 LA - 005 - 47.0/47.7 IN LA COUNTY FROM .4 KM N/O WELDON CANYON OC TO .4 KM S/O GAVIN CANYON UC RECONSTRUCT PCC PAVEMENT 1 – 10 450 February 2015 View Details April 01, 2010
12 - 0F9701 ORA - 39 - 15.1/15.9 IN THE CITY OF BUENA PARK ON SR-39 FR MANCHESTER AVE TO CRAIG AVE REMOVE/REPLACE THE EXISTING CURB & GUTTERS, SIDEWALK & CURB RAMPS AT VARIOUS LOCATIONS ON SR-39 1 – 10 August 2013 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 256804 LA - 005 - 15.1/15.2 IN LA COUNTY SB RTE 5 BETWEEN ESPERANZA STREET AND CALZONA STREET WIDEN OFF RAMP 1 – 10 240 March 2020 View Details
Has special requirements.
January 20, 2012
8 - 0R9701 RIV - 91 - 6.1 IN CORONA AT CORONA MAINTENACE STATION RECONSTRUCT WASHRACK SYSTEM Building 1 – 10 100 November 2013 View Details November 22, 2013
7 - 240404 LA - 5531-OS.AN/G.A - MATERIALS LABORATORY AT 1616 S. MAPLE AVENUE, LOS ANGELES CA 90015 REHAB MATERIAL LAB BLDG Building 1 – 10 320 September 2017 View Details
Has special requirements.
December 16, 2011
9 - 36390_ INY - 127 - 34.5/41.8 IN INYO COUNTY NEAR DEATH VALLEY JUNCTION ON ROUTE 127 FROM 7.6 MILES SOUTH OF ROUTE 190 TO 0.3 MILES SOUTH OF ROUTE 190 CAPM COLD IN PLACE RECYCLE 1 – 10 April 2015 View Details April 10, 2014
7 - 288204 LA - 60 - 0.3/3.1 IN LA CNTY IN AND NEAR LA FR BOYLE AVE TO RTE 60/710 IC STORM WATER SOURCE CONTROL Erosion Control, Highway Planting 1 – 10 125 August 2014 View Details
Has special requirements.
January 23, 2012
1 - 0B5504 MEN - 162 - 016.1/ IN MENDOCINO COUNTY NEAR DOS RIOS AT 0.9 MI EAST OF LAYTONVILLE-DOS RIOS 1 – 10 January 2014 View Details August 02, 2012
9 - 33500_ MNO - 395 - 52.3/53.7 IN MONO COUNTY NEAR LEE VINING FROM 0.4 MILES N OF VISITOR CENTER ROAD TO 0.7 MILES N OF PICNIC GROUNDS RD MITIGATE MONO LAKE ROCKFALL Erosion Control 1 – 10 150 February 2015 View Details
Has special requirements.
March 20, 2014
9 - 34650_ MNO - 266 - 2.2/2.6 IN MONO COUNTY NEAR THE CALIFORNIA/NEVADA STATE LINE FROM STATE LINE ROAD TO 0.2 MILES NORTH OF POWER LINE ROAD CURVE CORRECTION/COLLISION SEVERITY REDUCTION Asphalt Concrete Surfacing, Realign Curve, Modify Roadway 1 – 10 40 May 2014 View Details
Has special requirements.
March 20, 2014
11 - 294801 IMP - 186 - 00.0 /00.4 IN IMPERIAL COUNTY AT ANDRADE FROM MEXICO BORDER TO 0.4 MILE NORTH OF MEXICO BORDER. PEDESTRIAN/TRANSIT FACILITIES -(TE) Wheelchair Ramps, Asphalt Concrete Surfacing, Park and Ride Facility 1 – 10 150 July 2013 View Details April 17, 2013
11 - 2M6701 SD - 76 - R2.9/R8.5 IN SAN DIEGO COUNTY NEAR OCEANSIDE ON ROUTE 76 FROM MISSION AVENUE UC TO 0.7 MILE EAST OF MELROSE DRIVE CONSTRUCT A BWC - HMA CONCRETE OVERLAY Asphalt Concrete Surfacing, Rehabilitate Pavement 1 – 10 180 January 2014 View Details September 13, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
8 - 383501 RIV - 74 - 62.5-63.4 IN GARNER VALLEY, 3.7 MI E/O MOUNTAIN CENTER AT POST MILE 63.0 REPLACE HURKEY CREEK BRIDGE Replace Bridge 1 – 10 200 March 2014 View Details January 02, 2014
11 - 2M4601 IMP - 086 - 21.9 /26.9 IN IMPERIAL COUNTY NEAR WESTMORLAND FROM 0.1 MILE N OF BRANDT RD TO 0.2 PCC SLAB REPLACEMENT AND REPAIR Replace PCC Pavement, Rehabilitate Pavement 1 – 10 125 February 2014 View Details August 09, 2013
5 - 0R830_ SB - 1, 101, 135 - 49.9, 0.0, 0.0 IN SAN LUIS OBISPO AND SANTA BARBARA COUNTIES AT VARIOUS LOCATIONS ADA CURB RAMPS AND MINOR SIDEWALKS Reconstruct Electrical Facilities, Modify Culverts, Highway Planting, Wheelchair Ramps 1 – 10 August 2014 View Details
Has special requirements.
January 14, 2014
7 - 288504 LA - 405 - 11.7 NB 405 at Carson Commercial Vehicle Enforcement Facility. Improve and Upgrade Commercial Vehicle Enforcement Facility. Repair Inspection Facility 1 – 10 250 February 2014 View Details
Has special requirements.
January 23, 2013
1 - 463924 HUM - C09 - 1 – 10 July 2014 View Details May 15, 2012
6 - 42471_ KER - 119 - R10.0/R13.3 IN KERN COUNTY FROM 0.75 MILE WEST OF CHERRY AVE TO TUPMAN ROAD ADD TRUCK CLIMBING LANES 1 – 10 May 2015 View Details April 10, 2014
11 - 2M6301 SD - 76 - 024.1/034.9 IN SAN DIEGO COUNTY FROM PALA MISSI ON ROAD TO 2,0 MILES WEST OF RED GATE ROAD COLD IN-PLACE RECYCLING Rehabilitate Pavement 1 – 10 180 October 2014 View Details April 17, 2013
7 - 2487U4 LA - 210 - 29.2/31.5 IN LA COUNTY AT VARIOUS LOCATIONS FROM SIERRA MADRE STN TO SANTA ANITA PGL FOOTHILL EXTENSION SEG I Modify Bridge 1 – 10 210 September 2013 View Details
Has special requirements.
July 27, 2009
7 - 234504 LA - 110 - 00.0/21.2 FROM 9TH & GAFFEY STREET IN SAN PEDRO TO WAHSINGTON BOULEVARD IN DOWNTOWN LA REPL OH GUIDE-RETRO-REFL SIGN PANEL 1 – 10 200 November 2014 View Details January 23, 2013
10 - 0F740_ MER - 5 - 17.5 IN MERCED COUNTY NEAR LOS BANOS AT THE ROUTE 5/152 SEPARATION GIRDER DIAPHRAGM RETROFIT Clean and Paint Bridge, Freeway and Structures, Repair Bridge 1 – 10 120 April 2014 View Details
Has special requirements.
March 20, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 204904 LA - 405 - 39.1/ ON S/B ROUTE 405 AT VENTURA BOULEVARD ON-RAMP ADDING A LANE TO THE ON-RAMP Widening 1 – 10 290 February 2015 View Details January 23, 2013
7 - 249704 LA - 101 - 23.4/24.1 IN LA COUNTY IN LA BETWEEN WINNETKA AVENUE NB AND DE SOTO AVENUE NB ADDING AUXILIARY LANE Sound Wall, Retaining Wall, Reconstruct Interchange 1 – 10 310 April 2015 View Details January 23, 2013
7 - 273104 LA - 110 - 09.0/14.0 LA COUNTY BRIDGES ALONG LA-105 PM 7/8 AT LA-105/110 IC & LA-110 PM STRUCTURE REHABILITATION 1 – 10 360 March 2014 View Details February 03, 2012
7 - 239704 LA - 001 - 51.0/52.0 IN LOS ANGELES FROM WEST OF LATIGO CANYON TO EAST OF MALIBU COVE COLONY DRIVE CONSTRUCT RETAINING WALL 1 – 10 520 March 2015 View Details January 23, 2013
7 - 105964 VEN - 118 - 10.9/11.0 AT SOMIS FROM ROUTE 34 TO DONLON ROAD B7 MODIFY INTERSECTION Widening 1 – 10 330 April 2025 View Details January 14, 2013
7 - 205604 LA - 001 - 44.0/44.2 IN MAL AT LAS FLORES CANYON BETWEEN PM 44.0 AND 44.2 DRAINAGE FACILITY IMPROVEMENTS 1 – 10 280 November 2015 View Details January 23, 2013
12 - 0J61U1 ORA - 5 - 19.2/22.2 IN ORANGE COUNTY - ON RTE 5 FROM LAKE FOREST DR. TO ALTON PKWY AND ON RTE 405 FROM RTE 5 TO 0.2M NORTH OF IRVINE CENTER DRIVE REVEGETATION OF EXPOSED SLOPES FOR NPDES CONCERNS AND SOURCE CONTROL 1 – 10 November 2013 View Details November 30, 2011
3 - 4M6104 NEV - 080 - 028.0/ NEAR FLORISTAN AT TRUCKEE RIVER BRIDGE 17-0063 R/L 1 – 10 October 2013 View Details December 30, 2013
11 - 402801 SD - 052 - 05.0 /06.2 IN SD CNTY IN SD FROM 0.5 M W OF CONVOY ST OC TO 0.4 M W OF RTE163 PAVEMENT REHABILITATION Rehabilitate Pavement 1 – 10 50-175 June 2013 View Details June 24, 2013
5 - 1A870_ SCR - 1 - 16.9/17.2 IN SANTA CRUZ COUNTY ON ROUTE 1 FROM THE NB MERGE WITH ROUTE 17 TO THE NB OFF-RAMP TO OCEAN STREET RE-STRIPING AND SHOULDER WIDENING Reconstruct Concrete Barrier, Asphalt Concrete Surfacing 1 – 10 40 September 2014 View Details
Has special requirements.
January 16, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
2 - 4F1004 PLU - 070 - 023.7/023.9 1 – 10 April 2014 View Details August 06, 2012
1 - 378174 MEN - 128 - 000.2/ 011.1 NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS REPLACE CULVERTS Replace Culverts 1 – 10 150 March 2014 View Details
Has special requirements.
June 25, 2012
3 - 0F2704 YUB - 065 - 002.2/ NEAR WHEATLAND AT DRY CREEK BRIDGE 16-2 SCOUR MITIGATION BRIDGE REHAB Rock Slope Protection, Pavements Markers, Earthwork, Asphalt Concrete Surfacing, Replace Guard Railing, Rehabilitate Bridge Deck, Erosion Control 1 – 10 60 December 2014 View Details December 04, 2013
7 - 278304 LA - 405 - 3.5/5.5 IN LA COUNTY IN LONG BEACH AT TEMPLE AVE OC BRIDGE REHAB Replace Bridge 1 – 10 500 May 2013 View Details January 23, 2013
7 - 278401 LA - 210 - 22.5/24.6 IN PASADENA FROM ARROYO BLVD TO ORANGE GROVE SOUNDWALL CONSTRUCTION Sound Wall 1 – 10 210 April 2013 View Details
Has special requirements.
January 23, 2013
7 - 278604 LA - 210 - 20.8/21.5 IN LCF FROM FOOTHILL BLVD TO BIRKSHIRE PL UC SOUNDWALL CONSTRUCTION Sound Wall 1 – 10 210 October 2014 View Details
Has special requirements.
January 23, 2013
7 - 278704 LA - 710 - 18.2/18.5 IN LOS ANGELES COUNTY, IN SOUTH GATE CITY ON I-710 AT FIRSTONE BLVD INTERCHANGE Modify Ramp 1 – 10 230 March 2014 View Details April 01, 2010
12 - 0H2081 ORA - 55 - 17/17.7 OC. CITY OF ANAHEIM. BETWEEN SANTIEGO BLVD & MAPLE TREE DR. STARTING FR. ABOUT 500 FT SW OF NOHL CYN RD. & ENDING ABOUT 1700 FT SW OF NOHL CYN RD. FLATTEN THE SLOPE ABOVE THE MAINTENANCE ACCESS ROAD 1 – 10 July 2012 View Details November 30, 2011
12 - 0H0261 OR - 133 - 0.3/13.6 IN IRVINE, LAGUNA BEACH FROM SR-001 TO OSO CREEK CAPM SR-133 REHAB-42 LANE MILES FROM FOREST AVE (PM 0.3)TO SR-73(PM 4.1)& FROM I-405(PM 8.5)TO 241-13.6 1 – 10 260-330 May 2012 View Details November 30, 2011
1 - 0B4504 HUM - 299 - R010.7/R026.1 IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4-194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250 1 – 10 December 2013 View Details November 21, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0F0601 ORA - 5 - 5.6/6.6 IN ORANGE COUNTY IN SAN CLEMENTE AND DANA POINT FROM 0.1 MILE SOUTH OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILES SOUTH OF VIA CALIFORNIA OC AT CAMINO DE ESTRALLA WIDEN ROAD AND BRIDGE, PLACE HMA Modify Overcrossing 1 – 10 20-30 January 2012 View Details November 30, 2011
1 - 0B5704 MEN - 253 - 006.8/ IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10-229 1 – 10 January 2014 View Details August 02, 2012
11 - 2M5101 IMP - 086 - 11.3 /20.6 IN IMPERIAL COUNTY IN AND NEAR BRAWLEY FROM 15TH ST TO S JUNC RT78 ASPHALT RUBBER CHIP SEAL AND DIG OUTS Seal Coat, Rehabilitate Pavement, Asphalt Concrete Surfacing 1 – 10 125 February 2014 View Details September 13, 2013
12 - 0L0701 ORA - 5 - 0.0/6.8 IN OC. CITY OF SAN CLEMENTE FROM ORA/SAN DIEGO COUNTY LINE TO PCH RUBBERIZED HOT MIX ASPHALT TYPE O OVERLAY 1 – 10 May 2013 View Details November 30, 2011
3 - 3E1204 BUT - 070 - 026.8/027.0 ABOUT 10.9 MILES NORTH OF OROVILLE AT PENTZ OVERHEAD #12-138 AND AT CHEROKEE OVERHEAD #12-137 1 – 10 August 2014 View Details August 02, 2012
7 - 290804 LA - 1 - 2.7/12.1 IN LA ON PCH BTW ANAHEIM & RTE 710 ADA IMPROVEMENTS - 483 new or upgraded curb ramps and 4000 feet of sidewalk. 1 – 10 200 February 2015 View Details
Has special requirements.
January 27, 2012
6 - 0P810_ KER - 178 - 100.6/102.7 IN KERN COUNTY ON SR 178 FROM INYO KERN ROAD TO GEMSTONE STREET IN THE CITY OF RIDGECREST RECONSTRUCT CENTER MEDIAN WITH RAISED CURB MEDIAN Modify Roadway 1 – 10 November 2014 View Details
Has special requirements.
March 20, 2014
6 - 0P560_ KER - 58 - 36.3/39.9 ON ROUTE 58 BETWEEN 300 FEET EAST OF GATSON STREET AND JUNCTIONS STATE ROUTE 43 WIDEN SHOULDERS & INSTALL RUMBLE STRIPS Widening 1 – 10 60 June 2014 View Details
Has special requirements.
March 20, 2014
5 - 0Q590_ SCR - 9 - 3.8/18.7 IN SANTA CRUZ COUNTY AT AND NEAR BOULDER CREEK AT VARIOUS LOCATIONS FROM 0.9 MILE SOUTH OF GLENGARRY ROAD TO 0.2 MILE NORTH OF MCGAFFIGAN MILL ROAD POLLUTION SOURCE CONTROL Retaining Wall, Rock Slope Protection, Viaduct, Replace Drainage, Earthwork, Asphalt Concrete Surfacing, Concrete Barrier, Erosion Control 1 – 10 400 August 2014 View Details
Has special requirements.
March 11, 2014
12 - 0G3311 ORA - 91 - 9.2/15.9 IN OC. CITIES OF ANAHEIM & YORBA LINDA FROM 55/91 SEPARATION TO ROUTE 241/91 SEPARATION HIGHWAY REPLACEMENT PLANTING 1 – 10 June 2013 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 291204 LA - 057 - 7.7 /12.2 IN LA, RTE 57 FR PM 7.7/12.2, RTE 60 FR PM 0.0/6.9 ADA RAMPS Modify Signals, Wheelchair Ramps 1 – 10 250 November 2014 View Details
Has special requirements.
January 27, 2012
12 - 0K5201 ORA - 91 - 2.4/2.9 IN OC. ON ROUTE 91 NEAR BEACH BLVD OGAC OVERLAY, GROOVING, SAFETY LIGHTING, & UPGRADE ADA & GUARDRAIL TO CURRENT STANDARD 1 – 10 130-160 May 2012 View Details November 30, 2011
12 - 0K5301 ORA - 91 - 3.1/4.2 IN OC, CITY OF ANAHEIM. WB 91 FROM EAST ST. TO EUCLID AVE. RESURFACE ALL LANES WITH RUBBERIZED DENSE AC 1 – 10 130-160 September 2012 View Details November 30, 2011
1 - 0B3804 HUM - 096 - 004.1/ IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.0 MILES EAST OF PIPELINE OC #4-100 1 – 10 December 2013 View Details November 21, 2011
11 - 2T1901 SD - 15 - 005.6/R 006.0 IN SAN DIEGO COUNTY IN SAN DIEGO FROM ADAMS AVE OVERCROSSING TO CAMINO DEL RIO SOUTH UNDERCROSSING CONSTRUCT COMMUTER BIKE FACILITY Asphalt Concrete Surfacing 1 – 10 250 September 2014 View Details August 20, 2014
3 - 1E4914 BUT - 32 - 10.1/12.6 IN BUTTE COUNTY, IN CHICO, ON STATE ROUTE 32 FROM 0.1 MILE WEST OF STATE ROUTE 99 TO 0.3 MILE EAST OF STATE ROUTE 99 1 – 10 August 2014 View Details
Has special requirements.
January 31, 2014
11 - 408001 SD - 079 - 0.1/29.6 Bridge Rail Upgrades, Replacement Replace Bridge Railing 1 – 10 180 July 2014 View Details August 20, 2014
11 - 2T2501 SD - 805 - 9.5/10.3 IN SAN DIEGO COUNTY IN AND NEAR NATIONAL CITY FROM GROVE STREET OVERCROSSING TO PLAZA BOULEVARD UNDERCROSSING OUTSIDE WIDENING Widening, Freeway 1 – 10 220 July 2014 View Details August 20, 2014
11 - 406501 SD - 15 - R 036.8/R 040.8 IN SAN DIEGO COUNTY ABOUT 5 MILES NORTH OF ESCONDIDO FROM 0.2 MILE NORTH OF DEER SPRINGS ROAD OC TO GOPHER CANYON ROAD UC. INSTALL NEW CABLE BARRIER 1 – 10 325 March 2014 View Details January 13, 2014
1 - 464804 HUM - 101 - 001.1/ 002.2 IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC   Asphalt Concrete Surfacing,Erosion Control,Grading and Paving,Realign Curve,Realignment,Retaining Wall Asphalt Concrete Surfacing, Erosion Control, Grading and Paving, Realign Curve, Realignment, Retaining Wall 1 – 10 170 - 190 April 2011 View Details August 06, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
10 - 0V680_ STA - 120 - 6.1/11.2 ON ROUTE 120 BETWEEN MAAG ROAD AND 0.2 MILES EAST OF LANCASTER ROAD CAPM Asphalt Concrete Surfacing, Modify Electrical Facilities, Replace Guard Railing, Pavements Markers, Pavements Markings, Rehabilitate Pavement, Modify Signals, Replace Signs, Wheelchair Ramps 1 – 10 50 April 2014 View Details March 12, 2014
10 - 0V490_ TOU - 108 - R3.1, R3.9 IN TOULUMNE COUNTY NEAR SONORA AT 0.1 MILES EAST OF SULLIVAN CREEK BRIDGE AND AT 0.6 MILES WEST OF PEACHFUL OAK ROAD STORM WATER MITIGATION Erosion Control, Repair Slope, Repair Storm Damage, Rock Slope Protection, Earthwork 1 – 10 40 April 2014 View Details
Has special requirements.
March 12, 2014
6 - 0P840_ KER - 223 - 4.8/R17.2 ON ROUTE 223 IN KERN COUNTY NEAR ARVIN BETWEEN OLD RIVER ROAD AND VINELAND ROAD WIDEN SHOULDERS & INSTALL RUMBLE STRIPS Widening 1 – 10 65 June 2014 View Details
Has special requirements.
March 20, 2014
12 - 0M0201 ORA - 1 - 12.2/14.1 IN NEWPORT BEACH FROM SCHOOL STATE PARK TO NEWPORT COAST DR RHMA-TYPE G OVERLAY 1 – 10 January 2012 View Details November 30, 2011
11 - 241511 SD - 163 - 08.2 /09.4 IN SD CNTY, IN SD FRM 0.6 MI S TO 0.6MI N OF CLAIREMONT BLVD. OC INTERCHANGE RECONFIGURATION FOR TRAFFIC HANDLING IMPROVEMENTS Modify Interchange 1 – 10 250 June 2014 View Details
Has special requirements.
December 09, 2013
11 - 416801 SD - 163 - 3.6/3.6 Place High Friction Surface, Improve Drainage and Delineation Channelize, Modify Drainage, Asphalt Concrete Surfacing 1 – 10 90-120 December 2015 View Details October 08, 2014
5 - 0S790_ SLO - 101 - R21.6/R23.9 ON ROUTE 101 BETWEEN SAN LUIS OBISPO CREEK BRIDGE NO 49-14 AND 0.3 MILES SOUTH OF SANTA FEE UNDERCROSSING NO. 49-115. PAVEMENT PRESERVATION Replace Guard Railing, Asphalt Concrete Surfacing 1 – 10 90 April 2014 View Details
Has special requirements.
March 12, 2014
4 - 3G1604 CC - 24 - 5.2 IN CONTRA COSTA COUNTY ON ROUTE 24 IN LAFAYETTE AT 0.6 MILE WEST OF HAPPY VALLEY ROAD CONSTRUCT TIEBACK WALL Retaining Wall, Earthwork 1 – 10 120 August 2014 View Details July 01, 2014
4 - 3G1204 SON - 128 - 1.8 IN ALAMEDA COUNTY ON ROUTE 128 NEAR CLOVERDALE AT 1.8 MILES WEST OF THE MENDOCINO COUNTY LINE CONSTRUCT CAST-IN-DRILLED-HOLE PILE WALL AND REPLACE CULVERT Retaining Wall, Replace Culverts 1 – 10 140 September 2014 View Details July 01, 2014
4 - 4A3424 ALA - 580 - 36.9 IN ALAMEDA COUNTY ON ROUTE 24 AND THE 580/680 SEPARATION AT VARIOUS LOCATIONS INSTALL OVERHEAD SIGN STRUCTURES AND SIGN PANELS, REMOVE EXISTING SIGN STRUCTURES Replace Signs 1 – 10 180 September 2014 View Details July 01, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
11 - 299201 SD - 094 - 4.1 Seismic Restoration and Bridge Rail Upgrade. Modify Bridge Railing, Modify Bridge 1 – 10 250 June 2015 View Details August 20, 2014
4 - 2G8604 ALA - 580 - 33.4 IN ALAMEDA COUNTY ON ROUTE 580 IN SAN LEANDRO AT BENEDICT DRIVE OFF-RAMP REBUILD EMBANKMENT AND INSTALL SUB-DRAINS Retaining Wall, Earthwork, Drainage 1 – 10 120 July 2014 View Details
Has special requirements.
July 01, 2014
4 - 1SS044 ALA - 580 - 31.8 IN ALAMEDA COUNTY ON ROUTE 580 NEAR CASTRO VALLEY 0.1 MILE NORTH OF MIRAMAR AVENUE INSTALL TIEBACK RETAINING WALL Earthwork, Retaining Wall 1 – 10 250 August 2014 View Details July 01, 2014
11 - 289001 IMP - 008 - 90.4R/91.0R Modify Ramp and Widen Bridge Modify Bridge, Freeway and Structures, Modify Ramp, Widening 1 – 10 250 August 2014 View Details August 20, 2014
4 - 172444 ALA - 84 - 16.5 IN ALAMEDA COUNTY ON ROUTE 84 IN SUNOL AT TYLER RANCH NORTH OF 2ND STREET AND RAILROAD AVENUE ENVIRONMENTAL MITIGATION Highway Planting 1 – 10 80 September 2015 View Details July 01, 2014
7 - 290104 LA - 91 - 4.0/11.0 ON LA-91 BTWEEN 0.2 M E OF LA-110 & 0.6 M W OF LA-105 Concrete Barrier & Reconstruct MBGR Concrete Barrier, Guard Railing 1 – 10 250 November 2016 View Details
Has special requirements.
September 20, 2012
1 - 0A3204 HUM - 299 - 030.2/ 030.6 IN HUMBOLDT COUNTY ABOUT 9 MI WEST OF WILLOW CREEK FROM 0.3 MILE WEST TO 0.1 MILE EAST OF CEDAR CREEK ROAD Curve Improvement 1 – 10 50 July 2014 View Details
Has special requirements.
August 02, 2012
1 - 0B3204 DN - 199 - 024.6/ IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1-15 1 – 10 January 2014 View Details June 25, 2012
4 - 3S9004 MRN - 1 - 6.6 IN MARIN COUNTY ON ROUTE 1 AT MUIR BEACH CONSTRUCT TIEBACK WALL Retaining Wall 1 – 10 320 February 2015 View Details July 01, 2014
7 - 292201 LA - 2 - 17.8R/19.5R IN LA, RTE 2/134 IC MAINTENANCE SAFETY 1 – 10 200 April 2015 View Details
Has special requirements.
January 27, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 292104 LA - 101 - 11. /11.8 IN LA, RTE 101/134/170 IC MAINTENANCE SAFETY 1 – 10 250 September 2014 View Details
Has special requirements.
January 27, 2012
11 - 261601 SD - 5 - 4.0/R22.3 IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM CORONADO AVENUE OVERCROSSING TO CLAIREMONT DRIVE OVERCROSSING Roadside Safety Improvements Asphalt Concrete Surfacing, Modify Gores 1 – 10 90 July 2014 View Details January 17, 2014
3 - 1F4204 BUT - 099 - 040.6/ 040.8 ABOUT 5.6 MILES NORTH OF CHICO AT THE ROCK CREEK BRIDGE 12-27 1 – 10 July 2014 View Details May 16, 2012
2 - 299714 MOD - 299 - 039.3/ 040.6 IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION 1 – 10 November 2013 View Details September 22, 2011
1 - 0B2904 DN - 101 - 021.7/ 022.9 IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 1 MILE SOUTH TO 0.2 MI NORTH OF HAMILTON ROAD #8070 1 – 10 December 2013 View Details June 25, 2012
1 - 0A3604 HUM - 299 - 019.3/ 019.8 IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD Curve Improvement 1 – 10 90 February 2014 View Details
Has special requirements.
August 02, 2012
1 - 0B2804 DN - 101 - 017.5/ IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY AT 2.8 MILES NORTH OF MILL CREEK PARK ENTRANCE RD#8068 1 – 10 December 2013 View Details November 21, 2011
11 - 410601 SD - 005 - 0.1.2R Install and Upgrade Curb Ramps and Sidewalks to Currrent ADA Wheelchair Ramps 1 – 10 250 January 2015 View Details August 20, 2014
1 - 493704 HUM - 096 - 011.0/013.2 IN HUMBOLDT COUNTY IN HOOPA FROM LOOP ROAD TO 0.1 MILES WEST OF HOSTLER CREEK BRIDGE #4-294 1 – 10 October 2014 View Details August 16, 2012
10 - 0U290_ MER - 165 - 35.6/36.1 IN MERCED COUNTY NEAR TURLOCK ON STATE ROUTE 165 AT FOWLER AVENUE INSTALL LEFT TURN CHANNELIZATION 1 – 10 April 2015 View Details April 10, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
10 - 0X320_ STA - 108 - 33.1/36.1 IN MERCED COUNTY IN HILMAR ON STATE ROUTE 165 FROM CANAL STREET TO WILLIAM AVENUE AND IN STANISLAUS COUNTY IN RIVERBANK ON STATE ROUTE 108 FROM EIGHTH STREET TO CRANE INSTALL RUMBLE STRIPS 1 – 10 July 2014 View Details April 10, 2014
10 - 0X540_ SJ - 5 - 41.7/45.9 IN SAN JOAQUIN COUNTY NEAR THORNTON FROM TURNER ROAD UNDERCROSSING TO BEAVER SLOUGH BRIDGE CONSTRUCT MEDIAN BARRIER Earthwork, Guard Railing, Electrical Facilities 1 – 10 35 April 2015 View Details
Has special requirements.
April 22, 2014
8 - 336301 SBD - 38 - 26.3-26.8 NEAR BARTON FLATS AT HATHAWAY CREEK BR #54-0015 REPLACE BRIDGE DECK, UPGRADE BR RAIL & BR APPROACH RAIL & SLABS Replace Bridge 1 – 10 150 May 2014 View Details July 08, 2013
8 - 0J9301 SBD - 15 - 147.6 NEAR BAKER AT HALLORAN WASH BRIDGE 54-0287L/R REHAB BRIDGE: CONSTRUCT CONTINUOUS FOOTING AT BENTS, INFILL WALLS AND UPSTREAM NOSE PROTECTION Repair Bridge 1 – 10 60 June 2014 View Details July 09, 2013
4 - 4A4804 ALA - 260 - R1.20/R1.85 IN ALAMEDA COUNTY ON ROUTE 260 AT THE WEBSTER AND POSEY TUBES REPAIR HANDRAIL, SIDEWALK, AND OTHER MAINTENANCE APPURTENANCES Repair Expressway, Replace PCC Pavement 1 – 10 120 September 2014 View Details July 01, 2014
11 - 409701 SD - 008 - T0.2/R23.6 Roadside Safety Improvements Widening 1 – 10 220 December 2015 View Details October 08, 2014
3 - 2F0004 VAR - 000 - 000.0/R022.9 IN BUTTE, COLUSA, GLENN, SACRAMENTO, SUTTER,YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS 1 – 10 November 2013 View Details November 21, 2011
3 - 3M9204 ED - 193 - 006.0/ 012.7 FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO GEORGETOWN 1 – 10 January 2014 View Details November 21, 2011
11 - 080231 IMP - 98 - 032.1/032.4 IN IMP CNTY SR98 FROM 32.1 PM AT VV WILLIAMS AVE. TO 32.4 PM TO OLLIE AVE. WIDEN HWY FROM 2-4 LANES. WIDEN HIGHWAY Widening 1 – 10 250 July 2015 View Details October 08, 2014
11 - 265011 SD - 163 - 00.5 /01.8 IN SD CTY IN SD FROM "A" STREET TO RICHMOND STREET OVERCROSSING. SCENIC/HISTORIC HIGHWAY PRESERVATIO (PHASE 2A) TRANSPORTATION ENHANCEMT 1 – 10 250-750 July 2013 View Details April 17, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
6 - 0Q010_ FRE - 41 - R23.0 IN FRESNO COUNTY FROM PM 23.07 ON NORTH ROUTE 41 TO PM 23.25 ON NORTH ROUTE 41 POLYESTER CONCRETE OVERLAY Rehabilitate Bridge Deck 1 – 10 110 August 2014 View Details March 12, 2014
6 - 0Q240_ FRE - 41 - R3.0/M6.1 ON STATE ROUTE 41 IN FRESNO COUNTY FROM HARLAN AVENUE TO ELKHORN AVENUE PAVEMENT PRESERVATION (CAPM) Asphalt Concrete Surfacing, Repair Electrical Facilities, Groove Pavement, Replace Guard Railing, Pavements Markings 1 – 10 25 July 2014 View Details
Has special requirements.
March 12, 2014
6 - 0Q250_ KIN - 198 - R9.5/R14.7 IN KINGS COUNTY NEAR LEMOORE FROM 19TH AVENUE TO 14TH AVENUE UC PAVEMENT PRESERVATION (CAPM) Rehabilitate Pavement, Seal Cracks, Wheelchair Ramps 1 – 10 90 May 2014 View Details March 12, 2014
7 - 293004 LA - 210 - 14.2R/24.8R LA CNTY IN VARIOUS CITIES FROM LA TUNA CYN UC TO RTE 710/210 SEP REHAB RAMPS AND CONNECTOR PAVEMENTS Replace PCC Pavement, Groove Pavement, Asphalt Concrete Surfacing 1 – 10 500 August 2015 View Details
Has special requirements.
February 17, 2012
3 - 3E1104 NEV - 080 - 028.0/ NEAR FLORISTON AT TRUCKEE RIVER BRIDGE #17-0063R/L 1 – 10 April 2014 View Details August 06, 2012
11 - 406901 SD - 008 - R25.9/R32.0 IN SAN DIEGO COUNTY FROM 0.2 MILE EAST OF HARBISON CANYON UNDERCROSSING TO 0.2 MILE EAST OF VIEJAS CREEK BRIDGE PAVEMENT REHABILITATION Asphalt Concrete Surfacing, Replace Guard Railing, Rehabilitate Pavement 10 – 20 250 October 2014 View Details January 17, 2014
7 - 265604 LA - 138 - 69.3/74.9 IN LOS ANGELES COUNTY FR RTE 18 TO SBDO CNTY LINE WIDEN ROADWAY AND PAVE SHOULDERS Grading and Paving, Pavements Markings, Widening, Asphalt Concrete Surfacing 10 – 20 500 May 2014 View Details January 23, 2013
8 - 0G6201 SBD - 38 - 15.0/49.5 NEAR ANGELUS OAKS FR VALLEY OF THE FALLS DR TO NORTH JCT RTE 18 COLD PLANE AND OVERLAY Rehabilitate Pavement 10 – 20 100 January 2014 View Details August 07, 2013
7 - 275404 LA - 1 - 1.0 Pacific Coast Highway, At Alamitos Bay Bridge SEISMC RETROFIT (BRIDGE 53-0064) Repair Bridge 10 – 20 400 July 2016 View Details
Has special requirements.
August 08, 2011
11 - 290400 SD - 094 - 14.9/30.0 IN SAN DIEGO COUNTY NEAR JAMUL FROM ROUTE 54 TO 0.2 MILE EAST OF MARRON VALLEY ROAD____ PAVEMENT REHABILITATION Asphalt Concrete Surfacing, Rehabilitate Pavement 10 – 20 150 April 2013 View Details September 18, 2012
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
5 - 1A700_ SLO - 1 - 73.7/74.0 IN NORTHERN SAN LUIS OBISPO COUNTY AND SOUTHERN MONTEREY COUNTY 2.6 MI NORTH OF SAN CARPOFORO CREEK BRIDGE TO LIMEKILN CREEK CONSTRUCT 50' HIGH X 850' LONG SOLDIER PILE WALL WITH TIEBACKS Asphalt Concrete Surfacing, Retaining Wall 10 – 20 250 August 2014 View Details April 22, 2014
3 - 1A8434 ED - 089 - 013.8/018.0 NEAR SOUTH LAKE TAHOE FROM CASCADE ROAD TO NORTH OF EAGLE FALLS SIDEHILL VIADUCT STORM WATER QUALITY IMPROVEMENTS O/L, WIDEN, ADD DIKES & RET BASINS Erosion Control 10 – 20 200 July 2014 View Details November 06, 2013
11 - 405501 SD - 8 - 006.9/008.2 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE WEST OF WARING ROAD UNDERCROSSING TO 0.1 MILE WEST OF COLLEGE AVENUE OVERCROSSING UPGRADE EXISTING MEDIAN MBGR TO CONCRETE BARRIER Concrete Barrier 10 – 20 325 November 2014 View Details August 20, 2014
7 - 224104 LA - 60 - 21.5R/23.0R CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC CONSTRUCT INTERCHANGE Interchange 10 – 20 250 January 2014 View Details January 23, 2013
5 - 1C860_ SCR - 1 - 20.2/37.4 IN SANTA CRUZ COUNTY NEAR SANTA CRUZ FROM 0.1 MILE NORTH OF WESTERN AVENUE TO SAN MATEO COUNTY LINE PAVEMENT PRESERVATION Pavements Markers, Guard Railing, Erosion Control, Repair Drainage, Asphalt Concrete Surfacing, Pavements Markings, Seal Cracks 10 – 20 124 September 2014 View Details
Has special requirements.
January 16, 2014
8 - 1C3701 RIV - 95 - 0.0/36.2 NEAR BLYTHE FROM 0.2 MI S/O RTE 10/95 SEPARATION TO 0.7 MI S/O LYE RD COLD PLANE AND OVERLAY Rehabilitate Pavement 10 – 20 100 August 2014 View Details November 21, 2013
12 - 0J4001 ORA - 39 - 8.8/19.2 IN CITIES OF STANTON, ANAHEIM, BUENA PARK, LA MIRADA AND LA HABRA PAVEMENT REHABILITATION FROM ACACIA BLVD TO IMPERIAL HIGHWAY 10 – 20 480-600 November 2014 View Details November 30, 2011
8 - 0F6601 SBD - 247 - 1.8/9.6 IN AND NEAR YUCCA VALLEY FR EL CORTEZ RD TO 0.1 MI N/O NAPA RD CONSTRUCT SHOULDER Widening 10 – 20 250 January 2014 View Details August 07, 2013
5 - 0F700_ MON - 68 - R17.7/R17.9 IN MONTEREY COUNTY NEAR SALINAS ON STATE ROUTE 68 FROM PM R17.7 TO PM R17.9 BETWEEN RESERVATION ROAD AND SPRECKLES BOULEVARD BRIDGE WIDENING Reconstruct Wing Wall, Concrete Barrier, Reconstruct Drainage, Earthwork, Erosion Control, Grading and Paving, Reconstruct Guard Railing, Pavements Markings, Repair Slope, Seal Coat, Widening, Modify Bridge, Reconstruct Bridge Railing, Asphalt Concrete Surfacing 10 – 20 420 March 2015 View Details
Has special requirements.
April 22, 2014
11 - 409301 SD - 075 - 21.0R/21.6R Bridge Rehabilitation Reconstruct Bridge 10 – 20 250 January 0000 View Details August 20, 2014
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 278504 LA - 4054 - 8.7 IN LOS ANGELES COUNTY,IN CARSON - DELORES YARD OVER HEAD (53-1168) PAINT ENTIRE STEEL PORTION OF STRUCTURE AND POLYESTER CONCRETE DECK OVERLAY Rehabilitate Bridge Deck 10 – 20 July 2017 View Details
Has special requirements.
January 23, 2013
10 - 0Q170_ SJ - 580 - 5.0/15.3 ON ROUTE 580 FROM ROUTE 132 WESTBOUND ON-RAMP TO 0.9 MILES WEST OF CORRAL HOLLOW ROAD OVERCROSSING DIGOUT AND REPAIR OF LOCALIZED FAILURES/AC OVERLAY Rehabilitate Pavement, Repair Ramp, Pavements Markings, Pavements Markers, Replace Guard Railing, Grading and Paving, Freeway and Structures, Erosion Control, Modify Electrical Facilities, Earthwork, Reconstruct Drainage, Asphalt Concrete Surfacing, Seal Cracks, Widening, Replace PCC Pavement 10 – 20 180 June 2015 View Details
Has special requirements.
March 20, 2014
7 - 286604 LA - 1 - 0.1 /1.8 PROJ CERRITOS CHANNEL TMDL(LA1-.19/ 1.85,2.74/3.96.LA19-3.98/8.4) TMDL PROJECT - Stormwater BMP installations. Drainage, Reconstruct Culverts 10 – 20 400 April 2014 View Details
Has special requirements.
August 22, 2011
7 - 1W2404 LA - 5 - 20.3 Bridge (Br. No.53-1424) Elysian Viaduct. Spot blast cleaning and paint entire structure. Clean and Paint Bridge 10 – 20 400 September 2015 View Details January 30, 2013
7 - 267304 LA - 101 - 10.2/10.8 IN LA COUNTY IN LA AT UNIV TERR PKWY IC AND AT N/B OFF-RAMP LSHIM BOULEVARD WIDEN FREEWAY AND RAMPS 10 – 20 120 April 2017 View Details December 16, 2011
12 - 0L7401 ORA - 55 - 2.0/11.8 OC. ON SR-55 FR. 19TH ST. TO 17TH ST. IN THE CITIES OF COSTA MESA & TUSTIN. PAVEMENT RESURFACING INCLUDES RAMPS & APPROACH SLAB REPLACEMENT 10 – 20 April 2013 View Details November 30, 2011
7 - 252634 LA - 5 - 45.4R/59.7R IN LA CNTY IN LA AND SCLA FR ROUTE 5/14 IC TO LAKE HUGHES RD UC ROADWAY REHABILITATION Replace PCC Pavement, Replace Joint Seals, Rehabilitate Pavement, Groove Pavement 10 – 20 300 May 2013 View Details
Has special requirements.
January 23, 2013
7 - 275504 LA - 710 - 5.0/7.0 In Los Angeles County from Ocean Boulevard to Pacific Coast Highway Roadway Rehabilitation Rehabilitate Pavement 10 – 20 600 October 2015 View Details
Has special requirements.
January 23, 2013
10 - 0L970_ TUO - 120 - R19.6 IN TUOLUMNE COUNTY OF STATE ROUTE 120 FROM 7.6 MILES EAST OF YOSEMITE JUNCTION TO 4.8 MILES WEST OF THE TOWN OF MOCCASIN AT TUOLUMNE RIVER/DON PEDRO RESERVOIR REPLACE BRIDGE DECK 10 – 20 May 2015 View Details April 10, 2014
7 - 296704 Ven - 118 - 21.8/32.6 IN VENTURA COUNTY, FROM ARROYO OH TO LA/VENTURA COUNTY LINE Pavement Repair & Curb Ramps Wheelchair Ramps, Seal Coat, Asphalt Concrete Surfacing, Groove Pavement, Guard Railing, Highway Planting, Rehabilitate Pavement, Replace PCC Pavement 10 – 20 350 January 2018 View Details
Has special requirements.
January 31, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
5 - 0T540_ SCR - 129 - 9.5/10.0 ON ROUTE 129 FROM 0.4 MILES WEST OF OLD CHITTENDON ROAD TO 0.1 MILE EAST OF CHITTENDON UNDERPASS CURVE REALIGNMENT Realign Curve, Reconstruct Culverts, Asphalt Concrete Surfacing 10 – 20 180 January 2015 View Details
Has special requirements.
January 16, 2014
7 - 252404 LA - 005 - 27.8/32.4 IN GNDL, BRB AND LA FROM WESTERN AVENUE UC TO HOLLYWOOD WAY UC SLAB RPL AND GRIND, COLD PLANE OVERLAY Groove Pavement, Replace PCC Pavement 10 – 20 840 April 2013 View Details December 30, 2010
6 - 0G900_ MAD - 41 - 11.7/13.4 ON ROUTE 41 BETWEEN 0.3 MILES NORTH OF ROAD 208 AND 2.0 MILES NORTH OF ROAD 208 CONSTRUCT PASSING LANES Widening, Roadway, Pavements Markers, Passing Lane, Fence, Erosion Control, Earthwork, Asphalt Concrete Surfacing, Culverts, Drainage 10 – 20 150 May 2014 View Details
Has special requirements.
December 19, 2013
7 - 1952U4 VEN - 101 - 00.1/03.0 IN VEN COUNTY NR THOUSAND OAKS FROM VEN COUNTY LINES TO 101/23 IC INTERCHANGE IMPROVEMENT Reconstruct Interchange 10 – 20 570 July 2013 View Details January 23, 2013
7 - 253104 LA - 213 - 00.6/04.1 ON LA COUNTY AT WESTERN AVENUE FROM 14TH STREET/PENINSULA VERDE DRIVE STORM DRAIN LINING Replace Drainage 10 – 20 500 February 2014 View Details January 23, 2013
7 - 249404 LA - 101 - 13.0/13.8 IN LA COUNTY IN LA BETWEEN LAUREL CANYON BOULEVARD AND COLD WATER AVENUE CONSTRUCT AUXILARY LANE Reconstruct Interchange, Retaining Wall, Sound Wall 10 – 20 310 March 2015 View Details January 23, 2013
7 - 255104 LA - 60 - 24.2R/24.7R LA CNTY IN DIAMOND BAR AND INDUSTRY GRAND AV/SR 57/60 IC MODIFICATION and CONTRUCT ON-RAMPS 10 – 20 280 March 2014 View Details
Has special requirements.
January 23, 2013
7 - 244104 LA - 210 - 18.7/22.0 IN LA CANADA/FLINTRIDGE CITY, FROM OAK PLACE TO CTY'S S/E BOUNDARY CONSTRUCTION OF SOUNDWALL 10 – 20 350 September 2016 View Details January 23, 2013
6 - 0P180_ KIN - 5 - 9.0/16.5 NEAR KETTLEMAN CITY FORM 3.3 MILES SOUTH OF UTICA AVE OC TO JCT 41. OVERLAY 2R Replace Guard Railing, Grading and Paving, Freeway and Structures, Asphalt Concrete Surfacing, Modify Concrete Barrier, Electrical Facilities, Seal Cracks, Replace PCC Pavement, Repair Storm Damage, Rehabilitate Pavement, Pavements Markings, Repair Ramp 10 – 20 130 August 2014 View Details
Has special requirements.
March 20, 2014
12 - 0H4401 ORA - 73 - 10.0/24.5 IN VARIOUS LOCATIONS STORM WATER MITIGATION & SLOPE STABILITY 10 – 20 May 2013 View Details November 30, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
11 - 287201 SD - 78 - 12.1/13.0 IN SAN DIEGO COUNTY IN SAN MARCOS FROM SAN MARCOS BLVD CITY OF SAN MARCOS UNDERCROSSING TO TWIN OAKS VALLEY ROAD UNDERCROSSING CONSTRUCT NEW STRUCTURE Freeway and Structures 10 – 20 450 July 2015 View Details April 17, 2013
3 - 1A8424 ED - 089 - 008.6/ 013.8 IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD Asphalt Concrete Surfacing,Modify Culverts,Replace Drainage,Earthwork,Erosion Control,Reconstruct Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate Pavement,Reconstruct Roadway,Replace Signs,Wheelchair Ramps,Widening  Replace Drainage, Earthwork, Erosion Control, Reconstruct Guard Railing, Pavements Markers, Pavements Markings, Widening, Wheelchair Ramps, Replace Signs, Reconstruct Roadway, Rehabilitate Pavement, Asphalt Concrete Surfacing, Modify Culverts 10 – 20 110 March 2014 View Details August 06, 2012
11 - 406601 SD - 76 - R 004.2/R 007.6 IN SAN DIEGO COUNTY IN OCEANSIDE FROM RANCHO DEL ORO DRIVE TO 0.2 MILE WEST OF MELROSE DRIVE. MEDIAN BARRIER Concrete Barrier 10 – 20 250 June 2014 View Details January 13, 2014
4 - 4A0904 NAP - 29 - 47.0/47.2 IN NAPA COUNTY ON ROUTE 29 AT TROUTDALE CREEK BRIDGE BRIDGE REPLACEMENT ON NEW ALIGNMENT Replace Bridge 10 – 20 350 September 2014 View Details July 01, 2014
11 - 002700 SD - 005 - R19.9/R21.2 ON I-5 FR 0.2 KM S OF 8/5 SEP.OH I8 TO 0.5KM N.OF TECOLOTE CREEK BRIDG CONSTRUCT AUXILIARY LANES/ WIDEN CONNECTOR Widening 10 – 20 360 July 2013 View Details August 13, 2012
2 - 3C0714 LAS - 395 - 061.6/ 076.6 IN AND NEAR JOHNSTONVILLE FROM 0.4 MILE SOUTH OF BANGHAM LANE TO 0.3 MILE SOUTH OF WENDEL RD. 10 – 20 December 2013 View Details June 12, 2012
11 - 238401 IMP - 7 - 000.0/001.2 IN IMPERIAL COUNTY ON STATE ROUTE 7 FROM THE INTERNATIONAL BORDER TO STATE ROUTE 98 PAVEMENT REHABILITATION Asphalt Concrete Surfacing, Rehabilitate Pavement, Repair Roadway 10 – 20 125-250 July 2014 View Details January 17, 2014
6 - 0Q270_ FRE - 5 - 48.8/53.0 FROM 0.1 MILE SOUTH OF PANOCHE RD OC TO 0.2 MILE NORTH OF RUSSELL RD OC PAVEMENT REHABILITATION (2R) Earthwork, Electrical Facilities, Guard Railing, Widening, Signs, Rehabilitate Pavement, Replace Joint Seals, Replace PCC Pavement, Lighting, Pavements Markers, Pavements Markings, Ramp, Asphalt Concrete Surfacing, Bridge, Drainage 10 – 20 176 October 2014 View Details
Has special requirements.
March 20, 2014
7 - 491604 LA - 405 - 22.2/23.4 IN ING @ ARBOR VITAE AVENUE CONSTRUCT SOUTH HALF INTERCHANGE 20 – 40 500 July 2014 View Details December 16, 2011
3 - 1C0804 NEV - 089 - 000.1/ 000.2 IN TRUCKEE, AT DONNER CREEK UNDERPASS #17-16 (AKA MOUSEHOLE PROJECT) Asphalt Concrete Surfacing,Culverts,Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Retaining Wall,Signs,Wheelchair Ramps,Widening,Wing Wall  Erosion Control, Pavements Markers, Wheelchair Ramps, Widening, Wing Wall, Asphalt Concrete Surfacing, Drainage, Earthwork, Retaining Wall, Signs, Pavements Markings 20 – 40 September 2012 View Details
Has special requirements.
March 28, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 281504 LA - 101 - 29.2 /38.1 IN LA & VEN CNTY, IN LA101 (PM29.26 /38.19) & VEN101 (PM0.00/1.21 GSRD'S OR OTHER TREATMENT BMPs Erosion Control, Highway Planting, Reconstruct Culverts 20 – 40 750 March 2016 View Details January 23, 2013
7 - 289004 LA - 10 - 37.2/42.4 IN LA CNTY FR SOUTH MEADOW RD TO RTE 57 MAINLINE PAVEMENT REHABILITATION Rehabilitate Pavement, Replace PCC Pavement, Asphalt Concrete Surfacing 20 – 40 600 November 2014 View Details
Has special requirements.
January 23, 2013
6 - 45711_ KER - 14 - 58.3/62.3 NEAR RIDGECREST, ON ROUTE 14 FROM 0.5 MILE NORTH OF THE ROUTE 178 WEST/ROUTE 14 INTERSECTION TO 1.7 MILES NORTH OF THE ROUTE 178 EAST ROUTE 14 INTERSECTION CONVERT EXISTING 2-LANE TO 4-LANE EXPRESSWAY 20 – 40 May 2015 View Details April 10, 2014
10 - 0W190_ SJ - 99 - 22.9/38.8 ON ROUTE 99 FROM HAMMER LANE TO SACRAMENTO COUNTY LINE CAPM Wheelchair Ramps, Rehabilitate Pavement, Pavements Markers, Replace Guard Railing 20 – 40 150 April 2014 View Details
Has special requirements.
March 20, 2014
7 - 272304 LA - 210 - 23.0R/24.6R IN LA COUNTY IN PSNA BET LINCOLN BLVD AND ORANGE GROVE AVENUE OC EXTEND CONNECTOR LANE 20 – 40 490 July 2018 View Details February 03, 2012
11 - 275501 SD - 067 - R00.0/R05.8 PAVEMENT REHABILITATION OF MAINLINE SHOULDERS, AND RAMPS. IN SD CO IN EL CAJON AND NEAR SANTEE FM RTE 8 TO SD RIVER BR Freeway, Repair Ramp, Rehabilitate Pavement 20 – 40 250 September 2014 View Details January 13, 2014
7 - 275004 VEN - 33 - 0.0/05.6 IN VENTURA CNTY IN VEN FR JCT RTE 101 TO NB OFF TO VISTA R INSTALL BEST MANAGEMENT PARACTICE (BMP) DEVICES FOR STORM WATER MITIGATION Modify Drainage 20 – 40 200 December 2014 View Details February 17, 2012
7 - 273704 LA - 001 - 08.2/08.6 IN LA COUNTY @ LB BETWEEN TRE 47-DOMIN CHANNEL BRIDGE REPLACEMENT/RAMP MODIFICATION Replace Bridge 20 – 40 200 April 2014 View Details February 07, 2012
7 - 1992U4 LA - 039 - 40.0/44.4 IN LA COUNTY NEAR GLENDORA REHAB DRAIN, CONSTRUCT RETAINING WALL, RECON ROAD Retaining Wall, Repair Storm Damage, Repair Slope, Asphalt Concrete Surfacing 20 – 40 490 July 2014 View Details February 03, 2012
7 - 259004 LA - 001 - 01.0/01.0 LA COUNTY IN LA RIVER METALS TMDL SAND FILTERS AND INFILTRATION DEVICES 20 – 40 210 May 2014 View Details January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
12 - 0E9721 ORA - - IN ORANGE COUNTY CONSTRUCTION OF D-12 EQUIPMENT SERVICE CENTER (PS&E, CONSTRUCTION) 20 – 40 390-490 November 2014 View Details November 30, 2011
7 - 233004 LA - 405 - 06.4/43.1 VARIOUS CITY FROM LONG BEACH LOULEVARD TO S STAGG STREET, NB & SB CONSTRUCTION OF SOUND WALL 20 – 40 230 January 2015 View Details January 23, 2013
4 - 259414 NAP - 29 - 25.5/28.4 IN NAPA COUNTY ON ROUTE 29 IN ST. HELENA FROM 0.1 MILE NORTH OF CHARTER OAK AVENUE TO MEE LANE REHABILITATE ROADWAY Asphalt Concrete Surfacing, Drainage, Pavements Markers, Rehabilitate Pavement, Reconstruct Roadway 20 – 40 330 September 2014 View Details July 01, 2014
12 - 0C5601 ORA - 91 - 8.1/9.3 IN ANAHEIM FROM 0.2 KM W OF N OLIVE UP TO 0.2 KM OF TUSTIN AVENUE OC PROVIDE AN AUXILIARY LANE FROM NB SR-55 TO TUSTIN AVE OFF-RAMP 20 – 40 September 2013 View Details November 30, 2011
12 - 0H0291 OR - 91 - 0/10.1 IN LA PALMA, BUENA PARK, ANAHEIM, & FULLERTON FROM LA/OC LINE TO LAKEVIEW AVENUE RESURFACE TRAVELED WAYS OF MAINLINE AND RAMPS. RESURFACE DETERIORATED SHOULDERS 20 – 40 260-330 November 2011 View Details November 30, 2011
12 - 0E3101 OR - 74 - 0/1.6 IN SAN JUAN CAPISTRANO FROM I-5 /EAST CITY LIMIT RECONSTRUCT IC AT SR-74 20 – 40 570-710 September 2012 View Details November 30, 2011
5 - 0C640_ SB - 246 - R12.8/R17.6 ON ROUTE 246 IN SANTA BARBARA CO NEAR LOMPOC, FROM CEBADA CANYON ROAD TO 0.4 MILE EAST OF SANTA RITA ROAD PASSING LANES AND OPERATIONAL INPROVEMENTS Passing Lane 20 – 40 400 September 2014 View Details
Has special requirements.
January 14, 2014
11 - 407001 SD - 008 - R61.2/R77.8 IN SAN DIEGO COUNTY FROM 0.1 MILE EAST OF CRESTWOOD ROAD UNDERCROSSING TO THE IMPERIAL COUNTY LINE PAVEMENT REABILITATION Asphalt Concrete Surfacing, Rehabilitate Pavement 20 – 40 325 August 2014 View Details
Has special requirements.
January 17, 2014
2 - 3E4104 SHA - 299 - 000.3/002.6 IN SHASTA COUNTY ABOUT 20 MILES WST OF REDDING FROM 0.3 TO 2.6 MILES EAST OF TRINITY COUNTY LINE AND FROM 2.6 MILES TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. Earthwork,Realignment  Realignment, Earthwork 20 – 40 360 August 2014 View Details
Has special requirements.
August 16, 2012
11 - 2T1201 SD - 015 - M11.9/M31.5 IN SD COUNTY IN SD AND ESCONDIDO FM ROUTE 163/15 SEP TO 78/15 SEP. BUS RAPID TRANSIT (BRT) STATIONS ON THE MANAGED LANES (OVERSIGHT Park and Ride Facility 20 – 40 750 January 0000 View Details October 04, 2011
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
1 - 0B0004 LAK - 020 - 013.5/ 031.4 IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53 20 – 40 February 2014 View Details January 30, 2012
8 - 0K2801 SBD - 40 - 73.0/89.0 NEAR LUDLOW FROM 1.5 MI W/O OLD DAD WASH TO 1.5 MI W/O FORTRESS WASH GRIND AND OVERLAY AC Rehabilitate Pavement 20 – 40 120 January 2014 View Details August 07, 2013
7 - 290704 LA - 47 - 0.9/2.0 IN CTY OF LA AT TERM ISLAND,VINCENT THOMAS BRIDGE 53 147 BRIDGE SEISMIC RESTORATION Bridge 20 – 40 500 July 2015 View Details
Has special requirements.
October 22, 2012
11 - 085781 SD - 163 - 000.6/001.4 IN SAN DIEGO COUNTY FROM 0.6 MILES SOUTH TO 1.4 MILES NORTH OF FRAIRS ROAD OC REVISE INTERCHANGE/WIDEN OC AND APPROACH Asphalt Concrete Surfacing, Modify Bridge, Freeway and Structures, Modify Overcrossing, Widening 20 – 40 500 June 0000 View Details
Has special requirements.
August 20, 2014
11 - 263301 IMP - 8 - R 038.7 /R 039.3 IN IMPERIAL COUNTY IN EL CENTRO FROM 0.26MILE WEST TO 0.34MILE EAST OF DOGWOOD ROAD OVERCROSSING REVISE INTERCHANGE Modify Interchange 20 – 40 325 February 2014 View Details January 13, 2014
7 - 273604 VEN - 126 - 13.1/20.1 In Ventura County between east of Hallock Drive in the City of Santa Paula and west of E Street in the City of Fillmore. INSTALL CONCRETE MEDIAN BARRIER Concrete Barrier, Modify Bridge, Reconstruct Bridge Railing 40 – 60 450 April 2015 View Details
Has special requirements.
July 19, 2011
6 - 42470_ KER - 119 - 5.5/R13.3 IN KERN COUNTY FROM 0.75 MILE WEST OF CHERRY AVENUE TO TUPMAN ROAD WIDEN FROM 2-LANE TO 4-LANE & ADD TRUCK CLIMBING LANES AT ELK HILLS Earthwork, Culverts, Widening, Erosion Control, Expressway, Grading and Paving, Passing Lane, Realignment, Roadway 40 – 60 200 March 2015 View Details April 10, 2014
6 - 0P140_ KER - 5 - 62.5/73.1 ON ROUTE 5 BETWEEN LERDO OVERCROSSING AND ROUTE 5/46 SEPARATION REPLACE NB/SB #2 LN & FAILED PCC PANES OF #1 LN & DIAM GRIND ENT LN Asphalt Concrete Surfacing, Earthwork, Pavements Markers, Pavements Markings, Rehabilitate Pavement, Replace PCC Pavement, Replace Roadway 40 – 60 380 November 2014 View Details
Has special requirements.
December 19, 2013
10 - 0V660_ STA - 5 - 0.0/28.1 ON ROUTE 5 FROM MERCED/STANISLAUS COUNTY LINE TO STANISLAUS/SAN JOAQUIN COUNTY LINE CAPM Establish Existing Planting, Replace Guard Railing, Pavements Markers, Asphalt Concrete Surfacing, Reconstruct Drainage, Earthwork, Electrical Facilities, Pavements Markings, Repair Ramp, Rehabilitate Pavement, Replace Joint Seals, Replace PCC Pavement 40 – 60 190 March 2014 View Details
Has special requirements.
March 12, 2014
7 - 252004 LA - 405 - 34.3/48.6 IN LA COUNTY IN VARIOUS CITIES FROM GETTY CTR DRIVE TO NEAR ROUTE 5 SLAB REPLACEMENT, GRINDING OVERLAY Replace PCC Pavement, Rehabilitate Pavement, Replace Joint Seals 40 – 60 400 February 2015 View Details
Has special requirements.
January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
6 - 34253_ FRE - 180 - R75.0/R78.2 NEAR CENTERVILLE AND MINKLER, FROM WEST OF SMITH AVENUE TO EAST OF FRANKWOOD AVENUE 2C TO 4E ON NEW ALIGNMENT KINGS CANYON EXPRESSWAY-SEGMENT 3 KINGS CANYON EXPRESSWAY SEGMENT-3 Asphalt Concrete Surfacing, Bridge Railing, Bridge, Culverts, Drainage, Earthwork, Electrical Facilities, Erosion Control, Expressway, Fence, Flashing Beacons, Grading and Paving, Groove Pavement, Guard Railing, Highway Planting, Inspection Facility, Irrigation System, Lighting, Pavements Markings, Realignment, Rehabilitate Pavement, Roadway, Rock Slope Protection, Signals, Signs, Wing Wall 40 – 60 550 February 2015 View Details
Has special requirements.
April 22, 2014
7 - 232804 LA - 134 - 10.8/11.4 FROM RTE 134 TO SHERMAN WAY AND 0N RTE 405 FR N/S STAGG AV CONSTRUCTION OF SOUNDWALL 40 – 60 340 May 2013 View Details
Has special requirements.
January 23, 2013
11 - 2T1701 SD - 005 - 37.5 /51.4 IN SAN DIEGO COUNTY FROM MANCHESTER AVE TO SR 78 CONSTRUCT SOUNDWALLS IN THE NORTH AND SOUTH BOUND DIRECTIONS Sound Wall 40 – 60 500 June 2017 View Details June 24, 2013
12 - 0C5701 OR - 91 - 1.2/5.2 IN FULLERTON AND ANAHEIM WB DIRECTION FROM SR-57 TO I-5 PM 1.252/5.258 CONVERT WB AUXILIARY LANES AT VARIOUS LOCATIONS INTO A THROUGH LANES AND MODIFY RAMPS 40 – 60 460-570 October 2012 View Details November 30, 2011
12 - 0F96C1 ORA - 5 - 3.7/6.2 OC. I-5 FROM SOUTH OF AVENIDA VISTA HERMOSA TO S OF PACIFIC COAST HWY. ADD ONE HOV LANE 40 – 60 July 2013 View Details November 30, 2011
12 - 0F96E1 ORA - 5 - 6.2/6.8 OC. I-5 FROM S OF PACIFIC COAST HWY TO SAN JUAN CREEK ROAD. ADD ONE HOV LANE 40 – 60 August 2013 View Details November 30, 2011
5 - 49280_ SLO - 1 - 64.0/R66.9 IN SAN LUIS OBISPO COUNTY ABOUT 9 MILES NORTH OF SAN SIMEON FROM PIEDRAS BLANCAS LIGHTHOUSE ROAD TO ARROYO DELACRUZ BRIDGE REALIGN ROADWAY Wing Wall, Erosion Control, Earthwork, Drainage, Bridge Railing, Bridge, Culverts, Pavements Markers, Highway Planting, Fence, Grading and Paving, Guard Railing, Realignment, Signs, Rock Slope Protection, Roadway, Pavements Markings, Asphalt Concrete Surfacing 40 – 60 440 June 2015 View Details
Has special requirements.
March 20, 2014
11 - 2T1301 SD - 015 - R03.8/R06.0 IN SD CNTY IN SD FRM S15-S805 OC TO N15-E8 OC BRT STATIONS ONTHE MANAGED LANES (OVERSIGHT PROJECT) Widening 40 – 60 750 August 2014 View Details August 20, 2014
11 - 0223U1 SD - 005 - R 028.6/R 030.1 IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MI SOUTH OF GENESEE AVE OVERCROSSING TO ROSELLE STREET UNDERCROSSING RECONST INTERCHANGE, SIGNAL INTERSECTION AND ADD AUX LANES Reconstruct Interchange, Reconstruct Signals, Widening 60 – 80 638 July 2013 View Details August 20, 2014
11 - 056321 SD - 11 - 0.00/1.30 IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 905 FROM 0.1 MILE WEST OF BRITANNIA BOULEVARD OVERCROSSING TO 1.6 MILES EAST OF LA MEDIA ROAD UNDERCROSSING CONSTRUCT FREEWAY TO FREEWAY CONNECTORS Freeway and Structures, Interchange, Overcrossing 60 – 80 350 July 2013 View Details March 15, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 252624 LA - 005 - 45.4R/59.7R IN LA COUNTY IN LA AND SCLA FROM SENDO ROAD OH TO LAKE HUGHES ROAD UC ROADWAY REHABILITATION Asphalt Concrete Surfacing, Groove Pavement, Rehabilitate Pavement, Replace PCC Pavement 60 – 80 800 August 2014 View Details
Has special requirements.
February 03, 2012
12 - 0F96A1 ORA - 5 - 3.0/3.7 OC. I-5 FROM SOUTH OF AVENIDA PICO TO SOUTH OF AVENIDA VISTA HERMOSA ADD ONE HOV LANE 60 – 80 November 2013 View Details November 30, 2011
7 - 286704 LA - 1 - 07.7 /09.2 PROJ DOMINGUEZ CHENNEL VAR TMDLS(LA 1 PM7.7-9.24,LA91 PM6-8.43,LA105, IMPLEMENT STORM WATER TREATMMENT Earthwork, Erosion Control, Highway Planting, Irrigation System 60 – 80 750 March 2017 View Details
Has special requirements.
February 19, 2013
8 - 3401U1 SBD - 138 - 2.9 - 15.2 NEAR WRIGHTWOOD FR PHELAN RD TO JCT I-15 WIDEN TO 4-LNS & CONSTRUCT 14' MEDIAN Widening, Modify Roadway, Modify Bridge 60 – 80 450 April 2014 View Details July 25, 2013
11 - 2T1711 SD - 5 - 037.5/051.4 IN SAN DIEGO CO. FROM 0.2KM NORTH END OF BR 57-479 TO 0.3KM NORTH OF THE I-5/SR-78 JUNCTION. CONSTRUCT AN HOV LANE IN THE NB & SB _ DIRECTIONS PM 37.5/51.4 CONSTRUCT 1 HOV LANE IN SB & NB DIRECTIONS Freeway and Structures, Widening 60 – 80 325-360 March 2016 View Details June 24, 2013
5 - 4482U_ SB - 101 - 2.2/3.3 ON ROUTE 101 IN SANTA BARBARA COUNTY IN CAPINTERIA FROM 0.4 KM (0.2 MILE) SOUTH OF CAPINTERIA CREEK BRIDGE TO 0.5 KM (0.3 MILE) NORTH OF LINDEN AVENUE OVERCROSSING RECONSTRUCT INTERCHANGES (2) AND REPLACE CARPINTERIA CR BR LINDEN & CASITAS PASS IC 60 – 80 November 2014 View Details January 16, 2014
7 - 210604 LA - 71 - 0.5/4.5 ON RTE 71 FR RTE 10 TO RTE 60 INTERCHANGE RECONSTRUCTION - ADD LANES Widening, Freeway, Reconstruct Expressway 80 – 100 1000 January 2015 View Details April 01, 2010
7 - 202124 LA - 710 - 21.9/23.1 IN CMMRC & BLL FRM SOUTH ATLNTC BLV TO TRIGGS ST REHAB RDWY LONG LIFE PAVEMENT & WIDEN BRIDGES Modify Bridge, Replace PCC Pavement, Widening 80 – 100 650 June 2014 View Details
Has special requirements.
January 23, 2013
11 - 257151 SD - 076 - 12.1 /17.7 IN SD CNTY AT AND NEAR BONSALL FROM W/O SO MISSION RD TO E/O 76/15 SEP CONSTRUCT 4 LANE HIGHWAY Bridge, Highway Planting, Grading and Paving 80 – 100 1500 February 2014 View Details January 13, 2014
11 - 2T1501 SD - 805 - 5.1-13.5 IN SD CO IN & NEAR CHULA VISTA FRM PALOMAR OC TO 94/805 SEPARATION Install BRT Lanes on 905, 125, 805N, New Bridge, Ramp alignment, install signal Realignment, Signals, Widening, Ramp, Freeway and Structures, Bridge, Asphalt Concrete Surfacing 80 – 100 420 May 2014 View Details September 13, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 1170U4 LA - 010 - 33.4/37.5 IN LA COUNTY IN BALDWIN PARK & WEST COVINA FROM PUENTE AVENUE TO CITRUS STREET CONSTRUCT ONE HOV LANE IN EACH DIRECTION Widening, Freeway and Structures, Sound Wall 100 – 120 940 May 2013 View Details
Has special requirements.
January 23, 2013
7 - 254004 VEN - 126 - 22.0/34.6 IN VEN COUNTY IN FILMORE AND VEN FROM ENTRANCE TO TEXACO LT TO VEN/LA COLD PLANE AND OVERLAY Asphalt Concrete Surfacing 100 – 120 170 September 2013 View Details February 03, 2012
7 - 251704 LA - 210 - 00.0/25.8 IN LA COUNTY IN VAR CITIES FROM IC 5/210 TO LOS ROBLES AVENUE OC SLAB REPLACEMENT AND GRINDING Replace PCC Pavement, Groove Pavement, Asphalt Concrete Surfacing 100 – 120 740 November 2014 View Details December 16, 2011
7 - 273004 LA - 710 - 06.0/06.4 IN LA COUNTY IN LBCH FROM BRWY TO SHMKR BR REPLACE BRIDGE 100 – 120 670 October 2014 View Details February 03, 2012
8 - 043511 SBD - 58 - 22.2/31.1 IN HINKLEY, FR 2.4 MI W/O HIDDEN RIVER RD TO 0.7 MI E/O LENWOOD RD REALIGN & WIDEN SR-58 FROM 2 TO 4 LANES Realignment, Widening 120 – 140 500 September 2014 View Details November 21, 2013
7 - 1193U4 LA - 010 - 37.5/42.4 IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA CONSTRUCT HOV LANE IN EACH DIRECTION Freeway and Structures, Widening 120 – 140 940 October 2014 View Details
Has special requirements.
January 30, 2013
7 - 215924 LA - 005 - 00.0/01.5 IN LMRD FROM ARTESIA BOULEVARD/COYOTE CK OC WIDENING VALLEY VIEW AVENUE INTERCHANGE 120 – 140 650 August 2014 View Details
Has special requirements.
January 23, 2013
7 - 215954 LA - 005 - 05.8/07.6 IN SFPS FROM NO ORR AND DAY OH / RTE 605 IC WIDENING FLORENCE AVENUE INTERCHANGE Reconstruct Bridge, Widening 120 – 140 830 April 2013 View Details February 03, 2012
11 - 2T1721 SD - 5 - 037.5/039.6 IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING REPLACE SAN ELIJO BRIDGE, BUILD RET WALLS N AND S BOUND REALIGN RAMPS AND RECONFIG MANCH AVE Modify Ramp, Retaining Wall, Widening, Replace Bridge 120 – 140 750 October 2015 View Details June 24, 2013
7 - 199614 LA - 405 - 39.4/40.5 IN LA FROM SB AT BURBANK BL/N&S BND RTE 101 CONN (LA-101;17.0/18.5) RECONST SB CONN, RAMP TO N&S BND 101 Reconstruct Interchange, Freeway and Structures 140 – 160 1,000 August 2015 View Details January 23, 2013
  District - EA County - Route - Post Miles Location Detailed Project Scope Type of Work Estimate Cost Range (x $ million) sort direction Working Days Range Proposed Advertise Date Other Information Information Last Updated
7 - 203604 LA - 014 - 31.8R/53.5R IN LA COUNTY IN SCLA FROM .1KM S/O SANTA CLARA RIVER BR TO SIERRA HGWY OC PAVEMENT REHABILITATION 160 – 180 590 April 2019 View Details
Has special requirements.
November 18, 2008
7 - 279104 LA - 57 - 4.3R/4.8R LA COUNTY IN DIAMOND BAR & CITY OF INDUSTRY FR OC 53-1848R/UC53-1941 ADD WB AUXILIARY LANE/OC/RAMP/CONN Widening, Reconstruct Interchange 180 – 200 700 March 2015 View Details January 23, 2013
11 - 056331 SD - 11 - 0.00/2.80 IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 0.1 MILE EAST OF SANYO AVENUE UNDERCROSSING TO 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING CONSTRUCT NEW 4 LANE HIGHWAY AND COMMERCIAL VEHICLE ENFORCEMENT FACILITY Freeway 200 – 250 550 September 2015 View Details
Has special requirements.
October 08, 2014
7 - 272504 LA - 405 - 12.6/21.1R LA CNTY ON STE RTE 405 BTWN STE RTE 110 & 105 PAVEMENT REHABILITATION Replace PCC Pavement, Asphalt Concrete Surfacing, Modify Bridge, Freeway and Structures, Widening 250 – 300 750 October 2015 View Details
Has special requirements.
October 07, 2010
11 - 287100 SD - 094 - 01.4 /04.4 IN SD CNTY IN SD FROM RTE 94/5 SEP TO .2M WEST OF 47TH ST OC CONSTRUCT 2 HOV LANES LANES Widening, Freeway and Structures, Asphalt Concrete Surfacing 250 – 300 250 February 2017 View Details September 18, 2012
7 - 2332E4 LA - 5 - 45.4R/59.0 IN LA CNTY IN SCTA FR RTE 14 TO PARKER RD CONSTRUCT HOV AND TRUCK LANE Modify Bridge, Reconstruct Freeway, Reconstruct Interchange, Retaining Wall, Widening 300 – 350 1000 December 2015 View Details
Has special requirements.
October 27, 2010
7 - 265104 LA - 138 - 0.0/36.8 ON SR-138, FROM I-5 TO SR-138 WIDEN EXISTING SR-138 TO SIX LANE FREEWAY/EXPRESSWAY Widening 500 – 600 1080 October 2016 View Details
Has special requirements.
November 24, 2008
11 - 235800 SD - 005 - R34.1/R54.6 ROUTE 5 - WIDEN FOR HOV, MIXED FLOW AND AUX LANES. CONST HOV/GENERAL PURPOSE/AUX LANES Widening 900 – 1000 1000 January 0000 View Details September 18, 2012