Inquiry #1: Please specify if this is a Federal or Non Federal Aid Contract?
Inquiry submitted 11/29/2012

Response #1:Submitted for consideration
Response posted 12/04/2012


Response #2:This is not a Federal Aid Contract.
Response posted 12/05/2012




Inquiry #2: Please clarify if this is a Federal or Non Federal Aid contract?
Inquiry submitted 11/29/2012

Response #1:Submitted for consideration
Response posted 12/04/2012


Response #2:This is not a Federal Aid Contract.
Response posted 12/05/2012




Inquiry #3: Will retaining wall systems from the "Pre-Approved Alternative Earth Retaining Systems, August 2012" be accepted for bidding and construction of the Type 1A retaining wall?
Inquiry submitted 12/04/2012

Response #1:Submitted for consideration
Response posted 12/04/2012


Response #2:The project was designed using a Type 1A retaining wall.
Please bid as per current contract documents.
Response posted 12/14/2012




Inquiry #4: Need to visit the site. Can you provide contact number? Thanks
Inquiry submitted 12/06/2012

Response #1:Submitted for consideration
Response posted 12/06/2012


Response #2:Contact John Hubbs at 951-849-6360 to arrange for a site visit.
Response posted 12/06/2012




Inquiry #5: 1)Is there a mandatory job walk for this project?
2)Is there a prequalification package that needs to be submitted prior to the bid date? If there is please provide information

Inquiry submitted 12/06/2012

Response #1:Submitted for consideration.
Response posted 12/07/2012


Response #2:1) Not for bidding the project.
2)If so it would be indicated in the specs.
Response posted 12/14/2012




Inquiry #6: Please provide accepted manufacturers for the emulsion tank.
Inquiry submitted 12/07/2012

Response #1:Submitted for consideration
Response posted 12/08/2012


Response #2:There are manufacturers that have manufactured these tanks for Caltrans in the past. Submit a "Prime contractors looking for help" on the Caltrans website under this contract.
Response posted 12/10/2012




Inquiry #7: Details from Standard Plans for B3-3, B3-8 and B3-9 are Cancelled.
Please provide the above details for bidding purposes.

Inquiry submitted 12/07/2012

Response #1:Submitted for consideration
Response posted 12/08/2012


Response #2:B3-3, B3-8, and B3-9 have not been cancelled. They are currently in the 2006 Caltrans Standard Plans.
Response posted 12/14/2012




Inquiry #8: 1- how much is the liquidate Damage for this project
2- Warranty period for this project

Inquiry submitted 12/12/2012

Response #1:Submitted for consideration
Response posted 12/13/2012


Response #2:1. See page 75 of 290 of the Special Provisions.
2. Perform a word search of the Special Provisions and Standard Plans. There are multiple references to various types of warranties.
Response posted 12/14/2012




Inquiry #9: 1)Is there a mandatory job walk for this project?
2)Is there a prequalification package that needs to be submitted prior to the bid date? If there is please provide information

Inquiry submitted 12/13/2012

Response #1:Submitted for consideration
Response posted 12/14/2012


Response #2:Please see the response for inquiry # 5.
Response posted 12/14/2012




Inquiry #10: PLease provide finish floor elevation of the building.
Inquiry submitted 12/14/2012

Response #1:Submitted for consideration
Response posted 12/14/2012




Inquiry #11: Please elaborate on the asphalt portion of the project. Please explain the areas to be paved in order to arrive at the 408 tons.

Inquiry submitted 12/14/2012

Response #1:Submitted for consideration
Response posted 12/14/2012


Response #2:Total quantity for HMA has been verified. Bid total quantity as shown.
Response posted 01/07/2013




Inquiry #12: On sheet no. 31, ST1-0 Project Design Criteria, Materials, it refers to (Epoxy Coated Rebar). The Detail Notes, 4. All Reinforcement shall be Epoxy coated.
Is this Epoxy Coating in error? if not, are the anchor bolts to be epoxy coated as well as they are not called out to be so. Please indicate the condition which would require Epoxy Coated Rebar for future reference. Thank you.

Inquiry submitted 12/17/2012

Response #1:Submitted for consideration
Response posted 12/20/2012


Response #2:1) All reinforcement shall be epoxy coated as stated in plan sheet ST1-0 - Detail Notes - #4.

2)Anchor bolts can be stainless steel, galvanized, or epoxy coated as stated in STD Specifications dated May 2006. Sec 75-1.03 page 574, under Misc Br. Metal.

Please bid as per current contract documents.
Response posted 12/28/2012




Inquiry #13: Is the vacant lot next to the Ramsey Street Site available for the deposit of the demoed asphalt and concrete from this contract.
Inquiry submitted 01/03/2013

Response #1:Submitted for consideration.
Response posted 01/04/2013


Response #2:Refer to Section 7-1.13 (page 69) of the 2006 Standard Specifications.
Response posted 01/07/2013




Inquiry #14: Will the engineer reconsider the load capacity of the roof?
Building supplier remarks:
" the state is requiring a 15 psf collateral load for future solar panels. With purlins, the highest PSF we can achieve is 10 psf. We do jobs all the time with solar panels and this is the first I have seen such a high load. Most of the time we are around 5 – 8 psf."

Inquiry submitted 01/04/2013

Response #1:Submitted for consideration.
Response posted 01/04/2013


Response #2:Please bid per the current contract bid documents.
Response posted 01/08/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.