Inquiry #1: Can a specification or specific manufacturer model be made available for the manufactured stair and ramp unit located on the South entrance of the new building?
Inquiry submitted 09/28/2012

Response #1:Submitted for consideration
Response posted 09/28/2012


Response #2:Please bid as per current contract documents.
Stair and ramp unit have to meet the performance requirements in the current contract bid documents. No manufacturer's name will be given
Response posted 10/02/2012




Inquiry #2: Please clearly identify the limit of work. What areas will be made available for employee parking, temp fencing, material / equipment staging, etc.?
Inquiry submitted 09/28/2012

Response #1:Submitted for consideration
Response posted 09/28/2012


Response #2:Per the CE/CE, no work, including equipment storage, is to occur ouside the paved area of the Truck Inspection Facility. ESA fencing is to be placed around the paved area of the facility so as to not allow persons or equipment to cross or use the land beyond the fencing. Employee parking and equipment/material storage, within the paved area, is to be determined by the Engineer and as coordinated with the CHP.
Response posted 10/03/2012




Inquiry #3: The PMF Wall Systems on sheet A0-5.2 are noted to contain insulated glass.However, the details referenced on A-15 show monolithic glazing. Please advise if these frames are to be bid with insulated glass or not.
Inquiry submitted 09/28/2012

Response #1:Submitted for consideration
Response posted 09/28/2012


Response #2: Bid per current contract documents.
Response posted 10/08/2012




Inquiry #4: The HVAC Equipment Schedule on M-3 shows very minimal information. Mainly we need the manufacture and model number of this equipment.
Inquiry submitted 10/02/2012

Response #1:submitted for consideration
Response posted 10/02/2012


Response #2:Bid per the current contract documents. Refer to plan sheet 110, "Sheet M3-HVAC plan" and section 12-15.07 "Heating, Ventilating and Air Conditioning Equipment and System" of the contract special provisions for the HVAC systems.
Response posted 10/08/2012




Inquiry #5: It is not clear on sheet A-5 if the Sun Screen covers the roof or just the outer four corners of the building. Please advise.
Inquiry submitted 10/02/2012

Response #1:Submitted for consideration
Response posted 10/02/2012


Response #2:Bid per current contract documents. Refer to plan A-5 for locations of sun screens.
Response posted 10/08/2012




Inquiry #6: Sun Screens per. Detail 1,2/A-5 shows 6" Airfoil Blade.However Sun Screen Roof plan A/A-5 calls for Sun Screen @ two (2) locations only. At grid line 4 between lines G&L and also between lines A&C. The steel frame covers all exposed roof area, are the Sun Screens to be at these two (@) locations only? or over all the steel frame with the center section left with out Sun Screen over the center run from line A-J with this area left open for the skylights?
Inquiry submitted 10/02/2012

Response #1:Submitted for consideration
Response posted 10/02/2012


Response #2:Bid per current contract documents. Refer to drawing A-5, 2 sun screen locations are shown along grid line 4, in between grid lines A & C and grid lines G & J.
Response posted 10/08/2012




Inquiry #7: This link has the posted inquiry but I do not see where the response are posted. Please advice.

http://www.dot.ca.gov/hq/esc/oe/inquiry/view.php?p=08-0L9304

Inquiry submitted 10/02/2012

Response #1:To view the inquiries and their respective respponses as they are posted, follow these directions:

CA.gov----->Engineering----->Office Engineer---->Bidder Inquiries---->District 8.
From the drop down menu, you then choose the wanted project and click on the bidder inquiries link.
Response posted 10/02/2012




Inquiry #8: On the door schedule page A0-4.2 it shows a frame with a transom above & says transom where occurs, which frames have this transom?

Inquiry submitted 10/03/2012

Response #1:Submitted for consideration
Response posted 10/03/2012


Response #2:Bid per current contract documents. No transom for Press Metal Frame (PMF) in this project. Drawing A-0-4.2 shows a standard detail of PMF.
Response posted 10/08/2012




Inquiry #9: The septic tank and pumps on sheet SS-3 don't have a manufacturer listed. Can you provide the name of the manufacturer of tank and pumps?
Inquiry submitted 10/04/2012

Response #1:submitted for consideration
Response posted 10/04/2012


Response #2:Contractor to bid per the current contract bid documents.
Tank and pump have to meet the performance requirements in current contract bid documents. No manufacturer's name will be given.
Response posted 10/05/2012




Inquiry #10: LGP tank required for project does not have a manufacturer listed on plans or specs. What manufacturer is the design based on? Thanks.
Inquiry submitted 10/04/2012

Response #1:Submitted for consideration
Response posted 10/04/2012


Response #2:Contractor to bid per the current contract bid documents.
LPG tank has to meet the performance requirements in current contract bid documents. No manufacturer's name will be given.
Response posted 10/05/2012




Inquiry #11: Due to the number of answered questions, will Caltrans consider extending the due date for this project.?
Inquiry submitted 10/05/2012

Response #1:Submitted for consideration
Response posted 10/05/2012


Response #2:No. Bid Opening Date will remain unchanged.
Response posted 10/10/2012




Inquiry #12: Please clarify the backerboard required behind wall tile. Details 9 and 10/A-14 show no backerboard behind tile. While 7/A-15 shows cementitious backerboard. Spec section 12-9.02 indicates cementitious backerboard will be used as a wall substrate. However, section 12-9.01 states that the substate will be either cementitious backerboard or mold/mildew/moisture resistant gypsum board. Please clarify how the substrate behind tile should be bid. Thank you.
Inquiry submitted 10/05/2012

Response #1:Submitted for consideration
Response posted 10/06/2012


Response #2:Bid per current contract documents for requirements of backerboard behind wall tiles at different wall locations as shown.

Detail 9 and 10/ A-14 designate no backerboard behind wall tile.

Detail 7/ A-15 designates cementitious backer board behind wall tile. Refer to section 12-9.02 "Ceramic Tile" of the special provisions for cementitious tile backer board material.

Section 12-9.01 "Gypsum Wallboard" specifies wallboard backing used in restroom and shower areas "to be resistant to mold, mildew, and moisture or shall be cementitious backer panels".
Response posted 10/09/2012




Inquiry #13: On Sheet A-1.1, between F & G, an 18" concrete pipe is shown with dashed lines. Is this an existing pipe or is this to be bid as part of the contract? Please note that this pipe is not shown on any of the mechanical or civil plans.
Inquiry submitted 10/08/2012

Response #1:Submitted for consideration
Response posted 10/08/2012


Response #2:All existing items or features to be shown "(E)" on the drawings. Contractor to bid 18" concrete pipe item as per plan A1-1.
Response posted 10/09/2012




Inquiry #14: The Foundation Recommendation (Soils Report) indicates that subexcavation and recompaction may be required if man made objects or pockets of loose material are enountered during footing excavation. Section 12-2.05 indicates under "structure excavation" that at locations and limits shown on plans, the material under the footings shall be removed and replaced with select backfill. As no such locations have been found in the plans, please confirm for bidding purposes that overexcavation of the foundation will only be needed in the event it is required due to unforeseen soil conditions.
Inquiry submitted 10/08/2012

Response #1:Submitted for consideration
Response posted 10/09/2012


Response #2:Yes, if the actual field condition requires any overexcavation and structure backfill, it will be paid as extra work.
Response posted 10/10/2012




Inquiry #15: Please confirm that Section 8-3 "Welding" shall be applicable to all structural steel and joist welding. This section requires the general contractor to hire a Certified Welding Inspector and QCM to perform continuous field inspection and reporting at all times welding is being performed. Please confirm, thank you.
Inquiry submitted 10/09/2012

Response #1:Submitted for consideration
Response posted 10/09/2012


Response #2: Please bid per the current contract documents. Section 8-3 "Welding" only requires work described in Section 12-5.01 " Structural Steel for Buildings" conforming to "Welding Quality Control".
Response posted 10/10/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.