Inquiry #1: Ref: Special Provisions - Spec. section 10-1.33 continuously reinforced concrete pavement page 128 - submittals read - if epoxy coated steel is used in continuously reinforced concrete pavement submit a copy of the certification for each plant used.

Under measurement and payment page 132 paragraph 9 reads full compensation for epoxy coating of steel reinforcement is included in the contract price paid per cubic yard for continuously reinforced concrete pavement and no additional compensation will be allowed therefore ...please confirm if epoxy coating of the continuously reinforced concrete pavement is required or not

Inquiry submitted 08/27/2012

Response #1:Submitted for consideration.
Response posted 08/27/2012


Response #2:No epoxy coating is required.
Response posted 09/12/2012




Inquiry #2: Ref: Special Provisions - Section 10-1.01 order of work page 40 - submittals read - Night work only allowed for following median work:
1. Temporary railing (type K) placement
2. Placing temporary striping
3. Grinding concrete on existing number 1 lane

We are requesting that Caltrans issues an addendum that includes concrete paving as a permissible night work operation in the median.

Inquiry submitted 09/07/2012

Response #1:Submitted for consideration.
Response posted 09/10/2012


Response #2:At this time, no additional night work in the median will be allowed. Contractor to bid per the current contract bid documents.
Response posted 09/12/2012




Inquiry #3: RE: Pacheco Road misc concrete. The costs associated with replacing the minor concrete Curb/ Gutter/ and Sidewalk on Pacheco for the excavation of the footings should be paid for where? Should this be considered as costs associated with Structure Ex or should there be an additional item of work?
Inquiry submitted 09/07/2012

Response #1:Submitted for consideration.
Response posted 09/10/2012


Response #2:Payment for removal and restoration of portion of the existing sidewalk and gutter (including any roadway) for construction of the bridge widening is covered under the Structure Excavation item and Section 7-1.11 Preservation of Property and Section 19-1.02 Preservation of Property of the Standard Specification, and no additional payment will be made.
Response posted 10/01/2012




Inquiry #4: Earth Material Containing Lead: Please provide more detailed results of the samples collected with regards to the levels of lead found in the earth material. As an example: Where within the project were the samples taken? Depth of sample? Results per location of sample. Is there more information that can be distributed?
Inquiry submitted 09/07/2012

Response #1:Submitted for consideration.
Response posted 09/10/2012


Response #2:All information that can be distributed at this time is found in Special Provisions 10.1.26 EARTH MATERIAL CONTAINING LEAD.
Response posted 09/14/2012




Inquiry #5: Ref Item 31-Special provision Section 10-1.26(pg 117) and Plan sheets 115 and 122. This work is pretty ambiguous and needs more detail, specifically with the size ( Diameter) and length of CIDH Pile Sign Fdn(s).
Inquiry submitted 09/17/2012

Response #1:Submitted for consideration.
Response posted 09/17/2012


Response #2:Please refer to Addendum No.2, dated September 28, 2012.
Response posted 10/01/2012




Inquiry #6: 1-Ref Item 81, Type 60 G Conc. barrier.- This barrier is 56" tall and is in line with type 60 Conc. Barrier. Please provide your transition detail including reinforcing change detail from what is shown on Plan Sheet 42 to A 76D.

2- Ref. Plan Sheet 60. How are these elaborate assemblies (furnished and installed) to be measured and paid for?

Inquiry submitted 09/17/2012

Response #1:Submitted for consideration.
Response posted 09/18/2012


Response #2:1- No additional information will be provided prior to bid opening.
2- Ref plan sheet 60: Please see Standard Spec. May 2006, Section 83-2.02D(2) for Material and Section 83-2.04 for payment.
Response posted 09/26/2012




Inquiry #7: Special Provisions Section 40-1.03K requires pavement s to have profile index of 2 ½ inches per 0.1 mile section for contract acceptance.
Caltrans is requiring a tolerance for finish pavement that is not achievable on retro-fit paving projects. The existing pavements, even after grinding the 3 foot adjacent to new pavements still have the potential of rocking as the weight of the paver crosses it. These new requirements will undoubtedly add significant additional cost and lessen the life of the pavements. Can Caltrans Clarify this is the intent of the change to the Specification?

Inquiry submitted 10/01/2012

Response #1:Submitted for consideration.
Response posted 10/01/2012


Response #2:The intent of the specification is to achieve a smooth road that will extend pavement life and stay smoother longer. Contractor is to bid per contract documents.
Response posted 10/04/2012




Inquiry #8: PLAN SHEET 129 NOTE 3 REFERS YOU TO THE STRUCTURE PLANS FOR DETAILS. NO ELECTRICAL DETAILS ARE SHOWN OR THE ELECTRICAL PENDANT INSTALLATIONS. PLEASE CLARIFY.
Inquiry submitted 10/08/2012

Response #1:Please see Plan sheet No. 184, note "Column with Electrical Conduit (Standard Plan ES-9B, detail T)" and note "Pendant Soffit Luminary Light with No. 8 Pull Box (Standard Plan ES-9E, detail P)".
Response posted 10/08/2012




Inquiry #9: Please confirm that a 334L and a wireless modem are not required for this project. Cannot find them noted on the plans.
Inquiry submitted 10/08/2012

Response #1:Model 334 cabinet is required for CCTV System as shown on note [3] sheet E-3. Wireless modem is not required.

Response posted 10/09/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.