Inquiry #1: Bid Item 49 is clean and paint steel soldier piling. Division 1 on page 7 of the Special Provisions states the applicable section is 59. Section 59-9.01 of the 2010 Standard Specifications for Painting Steel Soldier Piles states "Where shown, prepare and paint steel soldier piles under the specifications for new structural steel in section 59-2." The plans do not contain or "show" any notes about painting of the soldier piles. Section 59-9.03 follows by stating, "Apply final or finish coats after installation and excavation are complete."

Section 59-2.03C(1) is the Standard Specification for painting new structural steel, but is general in nature and does not specifically state what coating system to use on a steel soldier pile.

Historically, Caltrans has specified a shop-applied coat of inorganic zinc with either (1) a sweep blast and final coat of inorganic zinc after pile installation, or (2) a pressure wash and 2 finish coats of latex after pile installation.

Please clarify what coating system is to be applied to the steel soldier piles.

Inquiry submitted 11/01/2012

Response #1:Submitted for consideration.
Response posted 11/05/2012


Response #2: Refer to Addendum No. 1 dated November 16, 2012.
Response posted 11/19/2012




Inquiry #2: The timber laging elevation detail on sheet 20 identifies 407 pieces of timber lagging. Please confirm the bid quantity for Item # 48-Timber Lagging @ MFBM =17. The pay item quantity does not equate to the number of pieces detailed (407 each), when multiplied using 6"x6" timbers @ 3 BF/foot x 6'length? Please verify the Pay Item quantity.
Inquiry submitted 11/14/2012

Response #1:Submitted for consideration.
Response posted 11/14/2012


Response #2:The quantity for Timber Lagging is shown correctly. Refer to Addendum No. 1 dated November 16, 2012.
Response posted 11/19/2012




Inquiry #3: Please describe which item of work includes the work related to the Concrete Coping. The Special Provisions provides no measurement and payment provisions as they historically have provided.
Inquiry submitted 11/19/2012

Response #1:Submitted for consideration.
Response posted 11/20/2012


Response #2:The item "Minor Concrete (Miscellaneous Construction)" includes the concrete quantity for both the concrete coping and the gutter.
Response posted 11/20/2012




Inquiry #4: For Erosion Control, Compost incorporate, How is the first application of compost to be incorporated? This application is designed for slopes 4:1 and flatter. Cross section sheets show 2.5:1 slopes.
Is it intended to place 4 inches of compost on the slopes?

Inquiry submitted 11/19/2012

Response #1:Submitted for consideration.
Response posted 11/20/2012


Response #2:Please bid per contract documents.
Response posted 11/20/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.