Inquiry #1: We request a bid date postponement until shortly after the holiday season. Caltrans has stacked up too many bids currently scheduled for the day of December 19th.
Inquiry submitted 12/07/2012

Response #1:Submitted for consideration.
Response posted 12/07/2012


Response #2:There are no plans to delay the bid opening.
Response posted 12/19/2012




Inquiry #2: We would like to request an extension until early January due to the project size and other projects bidding at the same time
Inquiry submitted 12/11/2012

Response #1:Submitted for consideration.
Response posted 12/12/2012


Response #2:See response to Bidder Inquiry No. 1.
Response posted 12/19/2012




Inquiry #3: Referencing Plan Page E-77 and E-78, please clarify what size(s) are the Fiber Optic Pull Boxes?
Inquiry submitted 12/11/2012

Response #1:Submitted for consideration.
Response posted 12/12/2012


Response #2:See Section 10-3.18 FIBER OPTIC SYSTEM, FIBER OPTIC CONDUIT SYSTEM,Fiber Optic Pull Box (page 150) of the Special Provisions.
Response posted 12/17/2012




Inquiry #4: Referencing Plan Page E-77 and E-78, please clarify what size(s) are the Fiber Optic Pull Boxes?

Please consider that, once Caltrans has answered this question, the electrical companies will need to contact the manufacturers with your specific fiber optic pull box size info to obtain pricing for this bid.

We request Caltrans postpone the bid date to provide time for prime contractors to forward Caltrans' fiber optic pull box size information to the manufacturers.


Inquiry submitted 12/11/2012

Response #1:Submitted for consideration.
Response posted 12/12/2012


Response #2:See response to Bidder Inquiry #3 above.
Response posted 12/17/2012




Inquiry #5: Plan sheet #134 details the Fiber Optic Vault. The plan sheet has no scale and there are no vault sizes provided. We cannot obtain pricing from our suppliers with incomplete details. Please provide revised plan sheets indicating the sizes of the vaults, racks and anything else to complete the vault details so we can obtain pricing. THANK YOU!
Inquiry submitted 12/12/2012

Response #1:Submitted for consideration.
Response posted 12/13/2012


Response #2:See Section 10-3.18 FIBER OPTIC SYSTEM, FIBER OPTIC CONDUIT SYSTEM,Fiber Optic Vault (page 150) of the Special Provisions.
Response posted 12/17/2012




Inquiry #6: Plan sheet #133 details the Fiber optic pull box.The details lack any dimensions indicating what size the boxes are (W X L X D). Please provide the missing info to complete the details so we can obtain pricing on the subject material. THANK YOU!
Inquiry submitted 12/12/2012

Response #1:Submitted for consideration.
Response posted 12/13/2012


Response #2:See response to Bidder Inquiry #3 above.
Response posted 12/17/2012




Inquiry #7: Plan sheet #73 indicates that a conduit notes 30 & 73 crosses the freeway.The conduit stops at station 115 with a break point and picks back up on the other side of the freeway. Note 30 indicates that this is a trench in pavement install.I find it hard to believe that Caltrans intends to allow a trench in pavement install across Route 101. Please correct this plan sheet and re-issue. THANK YOU!
Inquiry submitted 12/12/2012

Response #1:Submitted for consideration.
Response posted 12/13/2012


Response #2:The trench is on Route 84. Route 101 is overcrossing structure.
Response posted 12/17/2012




Inquiry #8: Plan sheet #71 station 235+30 to 238+00 indicates that a conduit is to be installed on the existing structure per SES-6 SHEET #165.Plan sheet #71 depicts two #8 structure mounted pull boxes be installed as well. We would request that the department provide transitional details detailing the transitions at each end from surface mounted conduit to underground conduit.Also please indicate rather expansion or deflection or expansion/deflection combo fittings will be installed. THANK YOU!
Inquiry submitted 12/12/2012

Response #1:Submitted for consideration.
Response posted 12/13/2012


Response #2:See Section 10-3.18 FIBER OPTIC SYSTEM, FIBER OPTIC CONDUIT SYSTEM,(page 150) of the Special Provisions.
Response posted 12/17/2012


Response #3:The transitional details will bee TYPICAL SHELL-TYPE MEA and TYPICAL STUD TYPE MEA on Page 165, mount conduit to the existing bridge abutment.

Response posted 12/17/2012




Inquiry #9: We also would like to request an extension or postponement of this bid. There are too many other projects next week to adequately bid this project. We believe a postponement of this bid will allow more contractors to bid this project and potentially save the State of California thousands of dollars.
Inquiry submitted 12/13/2012

Response #1:Submitted for consideration.
Response posted 12/14/2012


Response #2:See response to Bidder Inquiry #1.
Response posted 12/19/2012




Inquiry #10: We request a bid date extension for this project. There are too many projects bidding on this date. In addition there are questions pending that have not been answered which will cause delay's in getting comprehensive pricing, most specifically for the fiber optic boxes/vaults. Thank you.
Inquiry submitted 12/14/2012

Response #1:Submitted for consideration.
Response posted 12/17/2012


Response #2:See response to Bidder Inquiry #1.
Response posted 12/19/2012




Inquiry #11: We request an extension to the bid date for this project untial after the first of the year. With 21 separate traffic signal locations that I am REQUIRED BY THE SPECIFICATIONS TO VISIT, more time is needed to properly prepare a detailed estimate.
Inquiry submitted 12/17/2012

Response #1:Submitted for consideration.
Response posted 12/18/2012


Response #2:See response to Bidder Inquiry #1.
Response posted 12/19/2012




Inquiry #12: Several questions have been posted and the bid date is tomorrow. When will these questions be answered?
Inquiry submitted 12/18/2012

Response #1:There are no plans to delay the bid opening. Please bid according to current plans and specs.
Response posted 12/19/2012




Inquiry #13: Please provide email and/or fax number for Office Engineer in order to submit Cert. Small Business Listing Form per Special Provisions Sectyion 2. Non-Small Business Subcontractor Preference item #2.
Inquiry submitted 12/19/2012

Response #1:Submitted for consideration.
Response posted 12/19/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.