Inquiry #1: The specification under section 10-1.02 staste this will be a Risk Level 1 project. However, the GIS information provided by the SWRCB places this project in an area desginated as a receiving water risk area, which would atomatically make it at least a Risk Level 2. Please confirm Risk Level for this proejct.
Inquiry submitted 02/01/2013

Response #1:Submitted for consideration.
Response posted 02/04/2013


Response #2:Please see Addendum 2.
Response posted 03/12/2013




Inquiry #2: Standard Plan B2-3 indicates a minimum CIDH penetration into the footing of 3”. Plan Sheet 85/95, Section D-D shows a #8 footing stirrup with the note “3” clr.” Therefore, the stirrups will be sitting directly on the top of CIDH pile with no coverage around the bottom of the stirrup bar. Is this a conflict?
Inquiry submitted 02/04/2013

Response #1:Submitted for consideration.
Response posted 02/04/2013


Response #2:Please bid per the current contract bid documents.
Response posted 02/07/2013


Response #3:Please refer to Addendum No. 2 dated March 1, 2013. Plan sheet 85 has been changed.
Response posted 03/06/2013




Inquiry #3: What is the specification for Item #40) Rolled Erosion Control Product (Netting)? It is not in the project special provisions.
Inquiry submitted 02/04/2013

Response #1:Submitted for consideration.
Response posted 02/04/2013


Response #2:The specification was inadvertently left out. You can download the spec below. There are no plans to issue an addendum.

Rolled Erosion Spec


Response posted 02/07/2013


Response #3:Please see Addendum 2.
Response posted 03/12/2013




Inquiry #4: Can the State make the "Site Investigation Report" and "Asbestos and Lead Containing Paint Survey" available for download?
Inquiry submitted 02/06/2013

Response #1:Submitted for consideration.
Response posted 02/06/2013


Response #2:You can download these documents below:


Response posted 02/13/2013




Inquiry #5: Metal Beam Guard Rail Sheet L-1 Type 12C and Sheet L-2 Type 12B. Both runs require a Transition (Type WB) but there is not a pay item for Transition (Type WB) how are these going to get paid?
Inquiry submitted 02/26/2013

Response #1:Submitted for consideration.
Response posted 02/26/2013


Response #2:The payment for Transition Railing (Type WB) was mistakenly included in the quantity for Metal Beam Guard Rail. Once construction starts, Caltrans will issue a change order to reduce the quantity of Metal Beam Guard Railing corresponding to the length of Transition Railing (Type WB) and pay for the Transition Railing (Type WB) separately. Contractors should bid as they see fit.
Response posted 03/13/2013


Response #3:The payment for Transition Railing (TYPE WB) is included in the quantity for Metal Beam Guard Rail. Please bid accordingly.
Response posted 03/15/2013




Inquiry #6: Cable Railing - Sheet 2 of 95 (X-1) - See Note 6-For Cable Railing detail see Standard Plan B11-47. On Sheet 7 of 95 (C-3) it shows the Cable Railing Post with 4 holes. Per the project Special Provision Standard Plans List page V it list RSP B11-47 Cable Railing. Which plan do we use?
Inquiry submitted 02/26/2013

Response #1:Submitted for consideration.
Response posted 02/27/2013


Response #2:Construct cable railing in accordance with Standard Plan sheet B11-47.
Response posted 03/12/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.