Viewing inquiries for 12-0H2084

Submit new inquiry for this project


Inquiry #1: Are cross sections available for this project for contractors use? If so, please let us know how to obtain them. Thank you.
Inquiry submitted 08/14/2013

Response #1:Submitted for consideration.
Response posted 08/14/2013


Response #2:No. They are not available.
Response posted 08/14/2013


Response #3:There are no cross sections available. Please bid as you see it.
Response posted 08/20/2013




Inquiry #2: The industry standard for horizontal drains is 1 1/2" Sch 80 PVC slotted and unslotted pipe. Why does this project require 4" slotted corrugated plastic pipe (Bid item 32) and 4" plastic pipe (bid item 34)? 4" slotted corrugated plastic pipe is not produced, but perforated corrugated HDPE pipe is.
Inquiry submitted 08/23/2013

Response #1:Submitted for consideration
Response posted 08/28/2013


Response #2:Thank you for your patience. An Addendum is pending.
Response posted 08/29/2013




Inquiry #3: Can you please tell us when the house located at 3971 Maple Tree Drive will be removed in order to construct the slope repair?
Inquiry submitted 08/28/2013

Response #1:Pending
Response posted 08/28/2013


Response #2:Thank you for your patience. An Addendum is pending.
Response posted 09/09/2013




Inquiry #4: Highway Planting and Irrigation System cost break-down quantities don't match what is shown on sheets IP-1 and PP-1.
Inquiry submitted 08/29/2013

Response #1:Submitted for consideration.
Response posted 08/29/2013


Response #2:Thank you for your patience. An Addendum is pending.
Response posted 09/18/2013




Inquiry #5: On item 9 temp hydraulic mulch - the app rate is incomplete -no rate for binder or wood fiber mulch . thank you
Inquiry submitted 08/30/2013

Response #1:Submitted for consideration.
Response posted 09/09/2013


Response #2:Thank you for your patience. An Addendum is pending.
Response posted 09/18/2013




Inquiry #6: On item 26 E C Hydroseed - there is no binder in the app rates , please advise . thank you
Inquiry submitted 08/30/2013

Response #1:Please bid as you see it.
Response posted 09/09/2013




Inquiry #7: om item 26 hydroseed - i sent the seed list out for a quote from our seed supplier , and they said the seed rates are way too high . please confirm seed list rates . thank you
Inquiry submitted 08/30/2013

Response #1:Please bid as you see it.
Response posted 09/09/2013




Inquiry #8: Could you please provide an explanation of bid item #1 "Construction Site Management"?
Inquiry submitted 10/28/2013

Response #1:Submitted for consideration.
Response posted 10/29/2013


Response #2:"Construction Site Management" now is called "Job Site Management" in Section 13-4 of the 2010 Std. Spec.
Response posted 11/07/2013




Inquiry #9: Are we to assume that there is a "cap" on the end of the 4" PCC underdrain showing in detail 'Concrete V-Ditch' on drawing DD-1
Inquiry submitted 10/28/2013

Response #1:Submitted for consideration.
Response posted 10/29/2013


Response #2:Per Sheet DD-1, there is no cap.
Response posted 11/07/2013




Inquiry #10: Item #40 Code #23412 Steel Tube Fence Reference LD-1. Plans call out 2" top/Bottom Rails with 1" Pickets.

Q. Is the mid rail a 1" x 1" as well with the pickets welded below that rail, and again above that rail or may it use a 1" x 1/8" flat bar plate on each side instead?

Inquiry submitted 11/04/2013

Response #1:Submitted for consideration.
Response posted 11/04/2013


Response #2:Please bid as you see it.
Response posted 11/06/2013




Inquiry #11: Plan sheet IP-1, there is a call out for CARV near valve A-9. Can you please provide the size for the valve.
Inquiry submitted 11/04/2013

Response #1:Submitted for consideration.
Response posted 11/04/2013




Inquiry #12: Plan sheet PL-1, there is a requirement for Basin mulch but no rate. Please provide.
Inquiry submitted 11/04/2013

Response #1:Submitted for consideration.
Response posted 11/04/2013


Response #2:Bid it as you see it
Response posted 11/07/2013




Inquiry #13: Irrigation controller specification shows a Weathermatic VAC controller. The price shown was only guaranteed to 12-30-2012. I have contacted the distributor Aqua-Flow Supply and they tell me the Valcon Controller has been discontinued on Jan. 1, 2013. Please advise on the controller type and cost.
Inquiry submitted 11/05/2013

Response #1:Bid it as you see it.
Response posted 11/06/2013




Inquiry #14: Please provide a specification, detail, and/or model for the combination air release valve.
Inquiry submitted 11/05/2013

Response #1:Can you please cite the specific contract item or plan sheet for this question.
Response posted 11/05/2013




Inquiry #15: Please be advised, Arctostaphylos 'Emerald carpet' and Ceanothus griseus 'horizontalis' are never grown in flats. The plants cannot survive the bare rooting from flat to ground.
Inquiry submitted 11/05/2013

Response #1:Bid it as you see it.
Response posted 11/06/2013




Inquiry #16: Addendum 2 clarified Inquiry #2 with respect to corrugated plastic pipe versus non-corrugated plastic pipe. It did not clarify, however, why Standard Specification 68-2.02 was changed from the industry standard 1 ½-inch Sch 80 PVC to 4-inch Sch 80 PVC plastic pipe. Please provide clarification.
Inquiry submitted 11/05/2013

Response #1:4 inch dia. pipe shall be used as shown on the plans.
Response posted 11/06/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.