Inquiry #1: REGARDING BID ITEM 37, STOCKPILE ROCK MULCH, 30,500 SQFT. First, this quantity number is misleading. The bid quantity refers to the size of the stockpiles, whereas the area of slope to be stripped of the rock mulch is actually 240,837 SF as shown on plan sheet C-7 and listed on plan sheet Q-4. Further, we find no reference in the contract documents establishing the requirements for the condition of the rock mulch once it is placed in the stockpile. The process of stripping the rock mulch from the existing slopes will undoubtedly involve considerable contamination of the rock mulch with the underlying material, regardless of the construction method used. If the State expects the stockpiled rock mulch material to consist of pure 1" to 3" cobble that is totally free of any fine grained material, the requirements for the condition and gradation of the stockpiled rock mulch should be clearly specified, as a relatively expensive screening operation will be necessary in order to meet such requirements.
Inquiry submitted 05/13/2014

Response #1:Submitted for consideration.
Response posted 05/13/2014


Response #2:Please bid per the current contract documents.
Response posted 06/05/2014




Inquiry #2: Can you please provide centerline alignments in LandXML or CAiCE kcm file formats, and 3D existing TINs, breaklines and contours in LandXML or DGN file format? Thank You in advance
Inquiry submitted 05/16/2014

Response #1:Submitted for consideration.
Response posted 05/16/2014


Response #2:Please refer to Addendum No. 1, dated June 13, 2014.
Response posted 06/13/2014




Inquiry #3: In the Special Provisions on page 52 there is reference to salvaging oprtions of the bridge. In what item is this work to be paid?
Inquiry submitted 05/28/2014

Response #1:Submitted for consideration.
Response posted 05/28/2014


Response #2:Refer to the table in section 15-4.01C(1) page 54 of the special provisions. Salvage metal railing and posts for the Type 1 railing is included in bridge removal.
Response posted 06/05/2014




Inquiry #4: Bid Item 12 - Alternative Temporary Crash Cuhsion System. In section 12-3.19 lists the materials acceptable for this item. Will an Absorb 350 as manufactured by Barrier Systems be acceptable? In the event these systems are struct by public traffic and need repair, how will the repair be paid?
Inquiry submitted 05/28/2014

Response #1:Submitted for consideration.
Response posted 05/28/2014


Response #2:Absorb 350 is not an acceptable bid item under Section 12-3.19, as it is a gating system. For payment of repairs refer to Addendum No. 1, dated June 13, 2014.
Response posted 06/13/2014




Inquiry #5: Bid item 97 - Welded Steel Casing (Bridge)
There are two casings on this structure. A 6" casing around the 3" water line and at 24" at the future utility opening. Which of these casing is covered item 97? Where will the other be paid?

Inquiry submitted 05/28/2014

Response #1:Submitted for consideration.
Response posted 05/29/2014


Response #2: Please refer to Addendum No. 2, dated June 20, 2014.


Response posted 06/23/2014




Inquiry #6: The bid date for this Project is 06/26/14. This is only one week after Contract 11-257154 valued at $91 million. In addition, this is the same date as another major ($100 million) Southern California Project. The Contractor respectfully requests a minimum two week postponement so we can prepare a complete, accurate, and competitive bid for this Contract.
Inquiry submitted 06/05/2014

Response #1:Submitted for consideration.
Response posted 06/05/2014


Response #2:Please bid per the current contract documents.
Response posted 06/10/2014




Inquiry #7: 1) Is Lane Closure chart E1 intended to be used a maximum of 2 times? There is no chart for the intermittent weeknight closure of any of the 4 ramps without the 2 time max restriction.

2) Reference Charts C1 and C2 which can only be used a maximum of two (2) times each. The Contractor will need to use these charts (full closure of I-8) a minimum of 5 times each. Once for falsework Erection per stage (2), once for falsework removal per stage (2), and once for bridge demo. Please adjust the traffic charts accordingly.

Inquiry submitted 06/09/2014

Response #1:Submitted for consideration.
Response posted 06/09/2014


Response #2:Please refer to Addendum No. 1, dated June 13, 2014.
Response posted 06/13/2014




Inquiry #8: On Drawing G-1 left of Station 26+30 there is a callout for "Remove Exist 24" RCP" (approximately 60 LF). This is not included in the Drainage Quantities and there is no bid item for removing pipe. Where is this work to be paid?
Inquiry submitted 06/19/2014

Response #1:Submitted for consideration.
Response posted 06/19/2014


Response #2:Refer to Section 9-1.03 Payment Scope of the Standard Specifications. Please bid per the current contract documents.
Response posted 06/23/2014




Inquiry #9: Please clarify the payment for the 3" sprinkler control conduit is made under (see plan sheet 122).
Inquiry submitted 06/23/2014

Response #1:Submitted for consideration.
Response posted 06/23/2014


Response #2:Please bid per the current contract documents.
Response posted 06/23/2014




Inquiry #10: The existing piles at Bent 2 appear to conflict with the new piling for the center footing. Special Provisions Section 15-4.01C(1) on Page 54 indicates to remove the piling 3 feet below the bottom of the existing footing. If removal of the existing piling is required to install the new piling, under what bid item is the removal measured and paid?
Inquiry submitted 06/24/2014

Response #1:Submitted for consideration.
Response posted 06/24/2014


Response #2:Please bid per the current contract documents.

Response posted 06/25/2014






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.