Inquiry #1: Please clarify Special Provisions Sections 10-1.03, 13-12.03A, and 14-6.02C(4). Specifically, Section 10-1.03 indicates contractor can only work in the drainage April 15-Oct 15. Section 13-12.03A indicates no work of any kind is allowed in the drainage March 1 - Oct 10. Section 14-6.02C(4) indicates that work within the stream zone can only occur between June 15 - Oct 15. These three date ranges appear to contradict each other.
Inquiry submitted 07/02/2013

Response #1: Submitted for consideration.
Response posted 07/03/2013


Response #2: Refer to Addendum No. 2, dated July 18, 2013.
Response posted 07/18/2013




Inquiry #2: are there boring logs and/or geotechnical data available for this project?
Inquiry submitted 07/16/2013

Response #1: Submitted for consideration.
Response posted 07/16/2013


Response #2: Refer to Addendum No. 2, dated July 18, 2013.
Response posted 07/18/2013




Inquiry #3: what is the section (thickness) of biofiltration swales as shown on sheet 8 (W-1) of the plans?
Inquiry submitted 07/16/2013

Response #1: Submitted for consideration.
Response posted 07/16/2013


Response #2: Refer to the Erosion Control Items table on Erosion Control Plan and Quantities EC-2 (Sheet 40 of the plans). The compost quantities shown for Biofiltration Swale areas were calculated based on an assumption of placing compost 2 inches thick, to be incorporated 6 inches deep.
Response posted 07/18/2013




Inquiry #4: Bid Item 17 provides for Temporary Mulch. The Special Provisions do not specify what type of mulch to use for bid item 17. Caltrans Standard Specification 2010 section 13-5.02C Mulch, provides for the material to comply with Section 20-7.02D(6). Section 20-7.02D(6) Mulch provides for multiple types of mulch. What type of mulch is required for this project? Please provide clarification, so bidders can all bid accordingly.
Inquiry submitted 07/19/2013

Response #1: Submitted for consideration.
Response posted 07/19/2013


Response #2: Refer to 2010 Standard Specification sections 13-5.02C "Mulch" and 20-7.02D(6) "Mulch" for acceptable mulch types on this project.
Response posted 07/23/2013




Inquiry #5: Plan sheet no. 8 provides for Biofiltration Swales. No construction detail or quantities are provided in the plans for a biofiltration swale. The Special Provisions do not specify what type of material is required or how biofiltration swales should be constructed. Where in the bid documents are the details needed for bidding and constructing biofiltration swales? Please provide a construction detail and specifications on how to construct the Biofiltration Swales shown on Plan sheet no. 8.
Inquiry submitted 07/19/2013

Response #1: Submitted for consideration.
Response posted 07/19/2013


Response #2: The Biofiltration Swales listed on plan sheet No. 8 (W-1) have the same dimensions as the Ditches shown. Certain segments of the ditches are considered Biofiltration Swales when Erosion Control Type 2 is applied to the surface (see Plans EC-1 and EC-2).
Response posted 07/23/2013




Inquiry #6: The Bid Item List provides for Temporary Erosion Control in bid items, 16, 17, 18, 19, 20. However, there is no Temporary Water Pollution Control Plan for the construction of the entire project included in the bid plan set. The only reference to temporary erosion control is limited to the detour, plan sheet no. 31. Where in the bid documents can bidders find the details needed for bidding and constructing the temporary erosion control for the improvements beyond the detour? Please provide plans showing locations and quantities for the temporary erosion control items.
Inquiry submitted 07/19/2013

Response #1: Submitted for consideration.
Response posted 07/19/2013


Response #2: The locations of some Temporary Water Pollution Control items are not shown on the plans in order to allow flexibility in placement during construction. The Contractor is responsible for determining the best locations for bid items 16, 18, and 20. Bid items 17 (Temporary Mulch) and 19 (Temporary Fiber Roll) are shown on Detour Plan DE-3 (sheet 31 of the plans) because they are recommended for placement at the Detour location.
Response posted 07/23/2013




Inquiry #7: Plan sheet no. 8 provides for Biofiltration Swales. No construction detail or quantities are provided in the plans for biofiltration swales. How will the biofiltration swales be measured and paid? In what bid item number are bidders to include the cost for constructing biofiltration swales?
Inquiry submitted 07/19/2013

Response #1: Submitted for consideration.
Response posted 07/19/2013


Response #2: Refer to the response to Inquiry #5. Payment for construction of biofiltration swales are included in the price paid for bid item No. 45, "Compost." Refer also to Section 21-1.04 "PAYMENT" of the 2010 Standard Specifications.
Response posted 07/23/2013




Inquiry #8: Plan Sheet No. 8 provides for ditches with a 3’ wide bottoms. Standard Plan A62A provides for ditches or channels with less than 12’0” bottoms to be classified as ditch excavation. Are the quantities for ditch excavation included in the roadway excavation? Is the excavation of the ditches to be measured and paid for as roadway excavation? Please confirm if quantities of ditch excavation will be paid for as roadway excavation or if a ditch excavation bid item will be added to bid item list.
Inquiry submitted 07/19/2013

Response #1: Submitted for consideration.
Response posted 07/19/2013


Response #2: Excavation of the ditches is measured and paid for as Roadway Excavation, bid item No. 38.
Response posted 07/23/2013


Response #3:
Response posted 07/23/2013




Inquiry #9: Will Caltrans please consider postponing bid date? Please consider postponing the bid date at least a week to allow bidders (including DBE subs and vendors) to consider answers to inquiries currently posted to inquiry site.
Inquiry submitted 07/19/2013

Response #1: Inquiry received late.
Response posted 07/23/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.