Inquiry #1: On Bid Item #10 Roadway Excavation,(stockpile TPH soil) is the soil going to be sampled then transported and disposed of under that bid item?
Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:No, the petroleum impacted soils shall be left in the stockpile area designated for disposal by the State. Contractor will not perform testing. See note 3 on page 10 of 46 of the Contract Plans and reference in Section 14-11.06C(3) Disposal of the Contract Special Provisions. This answer assumes you are referring to bid item 10 Structure Excavation (Stockpile Petroleum-Impacted Soil).
Response posted 09/20/2013




Inquiry #2: It says for TPH impacted soil stockpiled for disposal by the state. Is there a separate contract for transportation& disposal that can be bid on?
Inquiry submitted 09/20/2013

Response #1:Submitted for consideration.
Response posted 09/20/2013


Response #2:No.
Response posted 09/20/2013




Inquiry #3: When can I visit the Crestview site and inspect the buildings?
Inquiry submitted 10/03/2013

Response #1:Crestview Maintenance Building and Site will be available for inspection on October 7th and 8th from 9am to 12:00 noon.
Response posted 10/03/2013




Inquiry #4: Following HAZMAT remediation in buildings to be demolished, does the contract require selective demolition & recycling of demolished materials or can the buildings be razed and off hauled to an appropriate landfill?
Inquiry submitted 10/03/2013

Response #1:Submitted for consideration.
Response posted 10/03/2013


Response #2:A.4 See special provisions section 15 EXISTING FACILITIES (page 27), section 024116 – STRUCTURE DEMOLITION (page 59), and plan sheet C-12 (page 13 of 46).
Response posted 10/03/2013




Inquiry #5: What are the Quality Control requirements for the contractor as related to placement of production and placement of HMA?
Inquiry submitted 10/04/2013

Response #1:
Submitted for consideration.
Response posted 10/04/2013


Response #2:Please refer to the Special Provisions Section 39 HOT MIX ASPHALT, and the Standard Specifications Section 39 HOT MIX ASPHALT, for details on quality control requirements for production and placement of HMA
Response posted 10/07/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.