Inquiry #1: Section 99-07411B(1) Sheet materials. Indicates that the base metal for the roof panels must be 20-gage! Section 99-07620B(1) Sheet Metal Flashings. Indicate the materials for the trims to be 24-gage. Is the 20-gage material accurate? Please note that if 20 gage material is used you would have to buy the entire coil for a very small amount of material raising the cost substantially. On previous projects we have done for Caltrans including the Crew Quarters at Lee Vining we used 24 gage material on the roof panels. Please clarify.
Inquiry submitted 05/04/2015

Response #1:Submitted for consideration.
Response posted 05/04/2015


Response #2:
Please bid per current contract documents.
Response posted 05/19/2015




Inquiry #2: Plan page A1-93 detail 5 indicates cutting counter flashing at head trim into existing CMU. This wall is stucco not CMU. We suggest a shallow cut into the stucco without cutting the wire mesh and then install a flashing into the cut and over the head trim.
Inquiry submitted 05/04/2015

Response #1:Submitted for consideration.
Response posted 05/04/2015


Response #2:Proposals for modifications to the contract may be submitted after award. Please bid per current contract documents.
Response posted 05/15/2015




Inquiry #3: The specifications require O.H. doors with a 20G front panel and a 26G back panel and an R value of 8 or better. We have checked with (3) manufacturers and we can get a R 17 panel with a 27G back panel or an R 7.25 with a 26G back panel. I would assume he R value would be more important, please advise.
Inquiry submitted 05/12/2015

Response #1:Submitted for consideration.
Response posted 05/13/2015


Response #2:
Please bid per current contract documents.
Response posted 05/19/2015




Inquiry #4: SPEC SECTION 99-0741B(2) indicates that the sheet metal for the standing seam roof indicates "colors or color matches MUST be as shown, the color indicated would be a specialty color and it would require buying the entire coil for a small amount of material. Is this accurate?
Inquiry submitted 05/13/2015

Response #1:Submitted for consideration.
Response posted 05/13/2015


Response #2:
Please bid per current contract documents.
Response posted 05/19/2015




Inquiry #5: Spec Section 99-07411B (1) indicates base metal to be 20G. There are no suppliers that offer a standing seam roof panel in 20G. Pleased advise.
Inquiry submitted 05/13/2015

Response #1:Submitted for consideration.
Response posted 05/13/2015


Response #2:
Please bid per current contract documents.
Response posted 05/19/2015






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.