Inquiry #1: Material and equipment used in the TSS must be new. Each TSS unit must use portable mounted traffic
signal and lighting equipment.
(TSS must be new.)should this read new or used or is new correct? special provisions 12-3.16a

Inquiry submitted 04/30/2014

Response #1:Submitted for consideration.
Response posted 05/01/2014


Response #2:Material and equipment used in the TSS must be new.
Response posted 05/01/2014




Inquiry #2: I opted into this project (08-336304) by mistake earlier this week. Can you please remove OHL USA, Inc. from the bidder's list?

I corrected my error and opted in for the correct project today (11-257154).

Thank you.
Michelle Purdy
Contracts Manager
OHL-USA, Inc.
mpurdy@ohlusa.com

Inquiry submitted 05/01/2014

Response #1:Submitted for consideration.
Response posted 05/02/2014


Response #2:Michelle, Based on Caltrans Headquarters Contract knowledge, since you have not submitted a bid on 08-336304 you do not need to do anything in this regard.
Response posted 05/02/2014




Inquiry #3: Is it possible to have access to the initial Environmental Assessment (Hathaway Bridge Replacement EA 33630 EFIS: 080000000608) notification and any modifications to the notification submitted to California Fish and Wildlife for this project? I am a subcontractor who would like to give a competitive bid to a prime and need to know the specific biological monitoring requirements in the EA for project compliance. Thank you in advance.
Inquiry submitted 05/20/2014

Response #1:Submitted for consideration.
Response posted 05/21/2014


Response #2:Bid per current contract documents.
Response posted 06/11/2014




Inquiry #4: Please provide bridge and approach slab details as there are none included in the plans.
Inquiry submitted 05/23/2014

Response #1:
Response posted 05/24/2014


Response #2:Submitted for consideration.

Response posted 05/24/2014


Response #3:Submitted for consideration.

Response posted 05/24/2014


Response #4:Bridge Plans issued as Addendum No. 1 on May 1, 2014 include necessary Bridge construction details.
Response posted 05/27/2014




Inquiry #5: Are contours available for the area alongside and below the existing bridge?
Inquiry submitted 05/27/2014

Response #1:Submitted for consideration.
Response posted 05/27/2014


Response #2:Bid per current contract documents.
Response posted 06/11/2014




Inquiry #6: The Informational Handout pdf appears to be corrupted. After a 21M download, the pdf consists only the first 4 pages of the Handout.

Please make available an uncorrupted pdf.

Inquiry submitted 05/27/2014

Response #1:Submitted for consideration
Response posted 05/27/2014


Response #2:There are four pages that are available in the information handout. They are accessible.
Response posted 05/28/2014




Inquiry #7: Will you be providing a Fish and Game application 1600 in order to see what is required?
Inquiry submitted 05/27/2014

Response #1:Submitted for consideration.
Response posted 05/28/2014


Response #2:Bid per current contract documents.
Response posted 06/11/2014




Inquiry #8: On drawing 7 of 44 you indicate a temporary access road but fail to provide contour elevations of the existing gground. You also show a narrow band of this access road on both sides of the creek but give no indication as to why this narrow band is 5' and 8' wide. This narrow band provides no access to the other side of the bridge without getting in the creek. Also you show the ramp down to this road on opposite sides of the bridge. Because the work is in 2 stages, it will be impossible to access the temporary road from the side that has the active traffic and therefore will not be able to access one side of the creek in each stage.

Although this drawing is named "Construction Details" many details are missing from this drawing.

Inquiry submitted 05/28/2014

Response #1:Submitted for consideration.
Response posted 05/28/2014


Response #2:Bid per current contract documents.
Response posted 06/11/2014




Inquiry #9: Will Caltrans be making available a Geotechnical Investigation for this project (for either download or physical viewing)?
Inquiry submitted 05/28/2014

Response #1:Submitted for consideration.
Response posted 05/28/2014


Response #2:Log of test borings included in project plans.
Response posted 05/29/2014




Inquiry #10: The plan drawing, addendum #1 sheet 45 of 63 does not provide access for Temporary Pedestrian traffic per the MUTCD Chapter 6D Part6 required by the special provisions. Is there an alternative?
Inquiry submitted 06/02/2014

Response #1:Submitted for consideration.
Response posted 06/03/2014


Response #2:Location not indicative of pedestrian traffic. No alternatives are specified. Bid per current contract documents.
Response posted 06/04/2014




Inquiry #11: Was the Bid Opening Date for this project postponed?
Inquiry submitted 06/04/2014

Response #1:Yes. Addendum # 3, issued on June 02, 2014, postponed the Bid Opening Date for this project until Thursday, June 12, 2014.
Response posted 06/04/2014






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.