Inquiry #1: Is the 9% DBE participation a goal or requirement?
Inquiry submitted 04/01/2014

Response #1:Submitted for consideration.
Response posted 04/02/2014


Response #2:Please see "SECTION 2" of the "SPECIAL PROVISIONS" for information concerning " The DBE Contract goal" .


Response posted 04/04/2014




Inquiry #2: i have questions concerning spec s for temporary traffic signal. i would like to speak to the electrical design persons familiar with this job. i do not what to post a bidder inquiry. please call me or email
Inquiry submitted 04/02/2014

Response #1:Submitted for consideration.
Response posted 04/02/2014


Response #2:This forum is to address bidder inquiries. All specific questions concerning this project should be posted as a bidder inquiry.
Response posted 04/07/2014




Inquiry #3: Reference Special Provisions Page 1 - Notice to Bidders - paragraph 11 and 12. Paragraph 11 states to complete the work "excluding" plant establishment within 350 working days. Paragraph 12 states to complete the work "including" plant establishment within 350 working days. Which is correct?
Inquiry submitted 04/08/2014

Response #1:Submitted for consideration.

Response posted 04/09/2014


Response #2:The correct statement is: "Complete the work, excluding plant establishment work, within 350 working days."
Response posted 05/19/2014




Inquiry #4: How may we obtain cross sections for this project?
Inquiry submitted 04/10/2014

Response #1:Submitted for consideration.
Response posted 04/10/2014


Response #2:Cross Sections for this project are available. if you would like to obtain a copy, please send an email to d8.pbi@dot.ca.gov requesting the cross sections and they will be emailed back to you.
Response posted 05/19/2014




Inquiry #5: Reference Bid Item #54 & 55. It appears that the steel casing is only required to ensure shaft sidewall integrity above the rock socket. If that is the case, please remove bid item #54 & 55, and revise section 49 of the special provisions to require shaft stabilization by temporary or permanent casing above the rock sockets.
Inquiry submitted 04/11/2014

Response #1:Submitted for consideration.
Response posted 04/14/2014


Response #2:Please bid per current contract documents.
Refer to section 49 of the Standard Specifications and section 49 of the Special Provisions for permanent steel casing requirements.

Response posted 04/23/2014




Inquiry #6: Bid Item # 64 is for "Random Boulder Texture." The texture on the Concrete Barrier, Type 80 Mod.(Item 90) calls for Wood, per the details on Plan Sheet 98 of 103. Is the texture on the Barrier to be paid in Item # 64 or # 90?
Inquiry submitted 04/14/2014

Response #1:Submitted for consideration.

Response posted 04/16/2014


Response #2:“Wood Texture” on barriers are to be paid in Item 90 “Concrete Barrier (Type 80 Modified)”.

Refer to Standard Specs 9-1.03 Payment Scope: Full compensation for all work involved in each bid item shown on the Bid Item List by the unit of measure shown for that bid item. Refer to Standard Specs: 83-2.02D(1)

General: Concrete barrier must comply with sections 51 and 52.

Response posted 04/17/2014




Inquiry #7: Are Permanent Steel Deck forms acceptable for use on the Bridge Deck?
Inquiry submitted 04/16/2014

Response #1:Submitted for consideration.

Response posted 04/16/2014


Response #2:No, permanent steel deck form is not allowed.
Bid per current contract documents.
Response posted 04/17/2014




Inquiry #8: Are the CIDH piles designed with end bearing?
Inquiry submitted 04/16/2014

Response #1:Submitted for consideration.

Response posted 04/16/2014


Response #2:No, the CIDH concrete piles are not designed as end bearing
Response posted 04/21/2014




Inquiry #9: Will the CIDH pile tips be inspected with a SID or Mini-SID device?
Inquiry submitted 04/16/2014

Response #1:Submitted for consideration.

Response posted 04/16/2014


Response #2:Bid per current contract documents. SID or Mini-SID device is not required.
Response posted 04/23/2014




Inquiry #10: are there rock cores available to be viewed? If so, what is the address to view the cores?
Inquiry submitted 04/16/2014

Response #1:Submitted for consideration.

Response posted 04/16/2014


Response #2:Please refer to addendum #2 dated 5/14/14, section 2-1.06B of the special provisions.

Response posted 05/19/2014




Inquiry #11: Reference Section 14-6.07 - "Natural Resource Protection Plan" in the Special Provisions. Where is this work to be paid? Typically there is a bid item for this work.

Reference Section 14-6.08 - "Biological Resource Information Program" in the Special Provisions. Where is this work to be paid?

Reference Sections 14-6.05A(2)(c), 14-6.05A(2)(d), and 14-6.05C(2) of the Special Provisions. The descriptions for these sections appear incomplete - they do not provide the days and or hours that the reports or surveys are due. Please clarify.

Inquiry submitted 04/16/2014

Response #1:Submitted for consideration.

Response posted 04/17/2014


Response #2:The Biological Resource Information Program will be done by the contractor. This cost is covered under the contractor supplied biologist bid item.

The Biological Resource Information Program will be done by the contractor. This cost is covered under the contractor supplied biologist bid item.

It’s stated in the biological opinion (BO) for 0J850 when the surveys are due.

Response posted 05/19/2014




Inquiry #12: Please reference the Water Quality Board Handout....It states that "a clear water diversion structure will be used, as necessary, to divert water flows around the work." Where is this to be paid?
Inquiry submitted 04/17/2014

Response #1:Submitted for consideration.
Response posted 04/17/2014


Response #2:Please bid as per current contract documents
Response posted 05/20/2014




Inquiry #13: Are the limits of the Clearing and Grubbing to be kept within the Cut/Fill Slope lines, as detailed on Sheet 11/12 of 103?
Inquiry submitted 04/17/2014

Response #1:Submitted foe Consideration.
Response posted 04/17/2014


Response #2:Most of the clearing and grubbing is confined to the area within the cut and fill lines. Minor clearing and grubbing may be needed for the construction of Pier 2 and 3 of the structure.
Response posted 04/17/2014




Inquiry #14: Are there any limitations for contractors accessing / executing the work in the creek bottom? Are contractors allowed to work with equipment in the creek bottom?
Inquiry submitted 04/17/2014

Response #1:Submitted for Consideration.
Response posted 04/17/2014


Response #2:The contractor is allowed access in the creek bottom; access is permitted along the slope west of abutment No. 4. Contractors are allowed to work with equipment in the creek bottom to execute work.
Response posted 04/21/2014




Inquiry #15: Reference Section 14-6.02C(5)-Protection Measures - item No. 5. Item 5 states that the Contractor shall install arroyo toad fence, pitfall traps, and coverboards as required by PLAC. There is a bid item to cover the fence. Where is the work required to install pitfall traps and coverboards to be paid?
Inquiry submitted 04/17/2014

Response #1:Submitted for consideration.
Response posted 04/17/2014


Response #2:There is no bid item for coverboards and pitfall traps. See SECTION 9-1.03 PAYMENT SCOPE of STANDARD SPECIFICATIONS 2010 "Full compensation for work specified in divisions I, II, and X….Bid per current contract documents.

Response posted 05/19/2014




Inquiry #16: Drawing TH-4 should be labeled Stage 2 not Stage 1 as shown.
Inquiry submitted 04/17/2014

Response #1:Submitted for consideration.
Response posted 04/17/2014


Response #2:See project addenda issued for contract: Bid per current contract documents.

Response posted 05/19/2014




Inquiry #17: Where are the drawings for Stage 3 (closure pour)?
Inquiry submitted 04/17/2014

Response #1:Submitted for consideration.
Response posted 04/17/2014


Response #2:See project addenda issued for contract: Bid per current contract documents.

Response posted 05/19/2014




Inquiry #18: The traffic control quantities are missing for Stage 3.
Inquiry submitted 04/17/2014

Response #1:Submitted for considaration.
Response posted 04/17/2014


Response #2:Please refer ro Addendum # 2 issued on May 14, 2014.
Response posted 05/20/2014




Inquiry #19: please provide liquidated damages for this project?
Inquiry submitted 04/18/2014

Response #1:Submitted for consideration.
Response posted 04/21/2014


Response #2:See SECTION 8-1-10A LIQUIDATED DAMAGES, STANDARD SPECIFICATIONS 2010:

Response posted 05/19/2014




Inquiry #20: Reference Plan Sheet No. 30- Hot Mix Asphalt Dike table. Will the 4.5 Tons of HMA (Type A) material for the AC Dike be paid for in bid item no. 50 - HMA (Type A)? or is the asphalt material for the dike to be considered incidental to bid item no. 51 - Place HMA dike (Type F)?
Inquiry submitted 04/18/2014

Response #1:Placement of dike is paid by the linear foot, item no. 51.

The estimated asphalt for the dike, the 4.5 tons in the 'Hot Mix Asphalt Dike' table, is included in the total HMA (Type A) listed in the 'Roadway Quantity' table; therefore it is also paid by item no. 50.


Response posted 04/21/2014




Inquiry #21: Where can contractors obtain a copy of the As-Built drawings of the existing bridge?
Inquiry submitted 04/23/2014

Response #1:Submitted for consideration.
Response posted 04/23/2014


Response #2:Refer to Addendum #2, dated 5/14/14, section 2-1.06B of the special provisions and section 2-1.06B of the standard specs.

Response posted 05/19/2014




Inquiry #22: We would like to request a copy of the sign in sheet for all who attended the Mandatory Pre-Bid meeting held yesterday, April 22, 2014.
Inquiry submitted 04/23/2014

Response #1:Submitted for consideration.

Response posted 04/23/2014


Response #2:Copies of the sign-in sheets for Primes and Subs who attended the mandatory meeting for project # 08-0J8504 on APril 22, 2014 are available.
To obtain a copy by email, Please send a request email to:
d8.pbi@dot.ca.gov and the sign-in sheets will be sent back to you. Thanks.
Response posted 05/19/2014




Inquiry #23: Reference Page 3 of the Biological Opinion dated May 17, 2011. Item No. 2 states that habitat restoration will be monitored and maintained for at least 5 years. Please confirm whether Caltrans or the Contractor will be responsible for the 5 year monitoring and maintaining of the habitat restoration.
Inquiry submitted 04/23/2014

Response #1:Submitted for consideration.
Response posted 04/23/2014


Response #2:The 5 year post construction monitoring will be separate project. The contractor for 0J850 will not be responsible for post construction monitoring. It is stated in the BO that 5 years of post construction monitoring are needed. Funds were not available in the project 0J850 to provide for this action so the intention is to open up a new project in the near future to complete this task.
Response posted 05/20/2014




Inquiry #24: Reference Special Provisions page 21 and 23. Traffic Chart No. 1 on page 23 indicates that Reversing Traffic Control is allowed 24 hours per day, 7 days per week. The 12th paragraph on page 21 states that traffic may be stopped in 1 direction for periods not to exceed 15 minutes. There will be portions of work (i.e. precast girder erection) that will require traffic in both directions to be stopped at the same time. Please provide a Traffic Chart to indicate when and the duration that traffic may be stopped in both directions.
Inquiry submitted 04/23/2014

Response #1:Submitted for consideration.
Response posted 04/23/2014


Response #2:See SPECIAL PROVISIONS 12-4.02A for girder erection. Bid per current project documents.

Response posted 05/19/2014




Inquiry #25: Reference Bid Item No. 33 - Salvage Metal Bridge Railing. Please provide the location where the salvaged bridge railing should be delivered.
Inquiry submitted 04/23/2014

Response #1:Submitted for consideration.
Response posted 04/23/2014


Response #2:Please refer to addendum #2 dated 5/14/14, section 15-2.03A(2)(b) of the Special Provisions.
Response posted 05/19/2014




Inquiry #26: Reference Bid Item No. 22 - Temporary Construction Entrance and Standard Specifications Section 13-7.03B. Please the type of entrances that will be required - Type 1 or Type 2?
Inquiry submitted 04/24/2014

Response #1:Submitted for consideration.
Response posted 04/24/2014


Response #2:Either Type 1 or Type 2 may be used to meet field conditions.
Bid per current contract documents.
Response posted 05/08/2014




Inquiry #27: Referring to Sheet 88 of 103, pipe size descriptions are inconsistent with standards:
1) Outer Pipe is described as '12" OD x 1/2"' but there is no 12" OD pipe. The method for specifying pipe sizes changes when pipe is larger than 12" nominal pipe size. 12" nominal size pipe is actually 12.75" OD. Please confirm that what is required is 12" pipe (OD = 12.75") with 1/2" wall (Extra Heavy). Please confirm that my interpretation is correct or provide correct pipe size references or refer me to an applicable standard.
2) A similar situation exists for the '8" OD' pipe reference. I believe that the objective is 8" nominal size pipe (actually 8.625" OD) Double Extra Strong (1" wall thickness). Please confirm my interpretation or provide correct pipe descriptions or refer me to an applicable standard.
Thank you.

Inquiry submitted 04/25/2014

Response #1:Submitted for consideration.
Response posted 04/25/2014


Response #2:Bid per current contract documents.

Response posted 05/19/2014




Inquiry #28: Reference Biological Opinion report dated May 17, 2011, page 5. The last sentence of the paragraph under Preconstruction Clearance Surveys states that "the area will be considered cleared after surveys conducted are negative for 4 consecutive weeks. Please clarify that the surveys are to be spaced one week apart (as is the norm) and that it is not required to be a daily survey during the 4 weeks.
Inquiry submitted 04/28/2014

Response #1:Submitted for consideration.

Response posted 04/28/2014


Response #2:Surveys are to be spaced one week apart.
Response posted 04/30/2014




Inquiry #29: please consider extending the bid due date for this project, due to the number of unanswered questions?
Inquiry submitted 04/28/2014

Response #1:Submitted for consideration.

Response posted 04/28/2014


Response #2:Bid date extended to May 22, 2014.

Response posted 05/19/2014




Inquiry #30: We are coming up with a different weight for misc. metal bridge. The weight is almost twice as much as the engineers estimate. It appears the weight of the pipe shear restraints was for one pier and should have been doubled. Sheet 84/103 Note 1 Pier 2 shown, Pier 3 similar. Please verify.
Inquiry submitted 04/29/2014

Response #1:Submitted for consideration
Response posted 04/29/2014


Response #2:See addenda issued for the project: Bid per current contract documents.

Response posted 05/19/2014




Inquiry #31: On drawing 68 of 103, the profile of the finish bridge (1"=20' scale) you show the top of the casing pipe the same elevation on both piers, they are not the same elevation.
Inquiry submitted 04/30/2014

Response #1:Submitted for consideration
Response posted 04/30/2014


Response #2:The 'Rock Slope Protection' shown on sheet 68 is existing RSP that was placed during the original bridge construction. The civil plans anticipates no additional RSP in Horsethief Creek Channel. New RSP is only associated with the two CSPs.
Response posted 05/05/2014




Inquiry #32: On drawing 68 of 103, on the plan view you have a note "Rock Slope Protection See Road Plans". There is no rock slope protection shown on the road plans other than at the end of the CMP and your total bid quantity is 6.2 CY. Is there supposed to be rock slope protection under the bridge?
Inquiry submitted 04/30/2014

Response #1:Submitted for consideration
Response posted 04/30/2014


Response #2:Please refer to addendum #2 dated 5/14/14, revised plan sheets.
Response posted 05/01/2014




Inquiry #33: In calculating the quantities of excavation embankment, we find that the project is short of material. How will the necessary import material be paid? (There may be enough material if there is additional excavation for the missing riprap)
Inquiry submitted 04/30/2014

Response #1:Submitted for consideration
Response posted 04/30/2014


Response #2:A check of excavation and embankment indicates that excavation exceeds embankment. Because of the increased structure depth of the new bridge, significant excavation will be required adjacent to abutments #1 and #4. This does not show up in the cross-sections, but is indicated by the contour grading sheets.

Response posted 05/02/2014




Inquiry #34: The splice details joining the three beams in span two seems very simplistic and not up to Caltrans usual detail. This is joining 3 precast beams in a 185' span with no positive support. There are no dowels just roughened edges seems a built in weak point. Will Caltrans be providing additional details for this splice
Inquiry submitted 04/30/2014

Response #1:Submitted for consideration.
Response posted 04/30/2014


Response #2:Please refer to addendum #2 dated 5/14/14, revised plan sheets 92 and 94.
Response posted 05/19/2014




Inquiry #35: Reference the Biological Opionion Report dated May 17, 2011, page 5 under the Section titled "Preconstruction Clearance Surveys". This section states that the 4 consecutive week preconstruction clearance survey for the Arroyo Toad is to be completed within the breeding season (Feb 15 to July 15). The postponement of the bid date to May 22 creates a problem with completing the 4 week clearance survey prior to July 15 if we assume that contracts will be issued 30 days after the bid date (ie June 23). Will the breeding date of July 15 be extended to allow for the completion of the clearance survey? Or, will Caltrans complete the clearance survey with their own forces prior to July 15? Please advise.
Inquiry submitted 05/01/2014

Response #1:Submitted for consideration
Response posted 05/01/2014


Response #2:Breeding season will not be extended. Preconstruction survey will be done once fence is up. The fence will be installed outside of the breeding season (Breeding season is February 15 to July 15). Therefore the fence will be installed sometime between August 2014- January 2015. After the fence is up, preconstruction clearance surveys will occur within the fenced area to search for arroyo toads. The excluded area will be considered cleared after surveys conducted during optimum conditions within the breeding season are negative for 4 consecutive weeks (the surveys must be one week apart). The surveys could then begin February 2015 and must conclude by July 2015. These dates and restrictions follow the guidelines provided in the biological opinion.
Response posted 05/20/2014




Inquiry #36: The splice elevation detail for the girder’s on sheet 92 calls for the rebar to be epoxy coated. Please clarify on the epoxy coating requirement for girder reinforcement and pre-stressing strands.

Inquiry submitted 05/01/2014

Response #1:Submitted for consideration

Response posted 05/01/2014


Response #2:Bid per current contract documents.

For epoxy prestressing strands, refer to Standard Specifications, section 50 Prestressing Concrete, especially sub-sections 50-1.01C(2) Certifications, 50-1.01C(4) Test Samples, 50-1.02B Prestressing Steel, and 50-1.03A(2) Epoxy-Coated Strand.

For epoxy coated reinforcement, refer to Standard Specifications, section 52-2 Epoxy-Coated Reinforcement and Epoxy-Coated Prefabricated Reinforcement.

Response posted 05/08/2014




Inquiry #37: Was the Bid Opening Date for this project postponed?
Inquiry submitted 05/02/2014

Response #1:Yes. Addendum # 1 issued April 30, 2014 postponed the Bid Opening Date for this project until May 22, 2014.
Response posted 05/02/2014




Inquiry #38: When can we expect the next addendum to be released with any plan changes as well as RFI responses?
Inquiry submitted 05/09/2014

Response #1:Submitted for consideration.
Response posted 05/09/2014


Response #2:Addendum # 2 was posted on May 14, 2014
Response posted 05/20/2014




Inquiry #39: We have received and reviewed addendum #2. There are still prebid questions that have not been answered or addressed in the addendums. Please provide answers for prebid inquiry #'s 3, 11, 12, 15, 23, 24, and 35.
Inquiry submitted 05/15/2014

Response #1:Submitted for consideration.
Response posted 05/15/2014


Response #2:All inquiries for this project have been answered.
Please refer to each indivifual inquiry for its respective response.
Response posted 05/20/2014






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.