Inquiry #1: The irrigation plan on sheet 14, IP-3, shows new wire ending up at line UC1, station 24+50. The plans, however, do not specify how many wires get connected at the above location.

Please clarify the quantity of wires required to cut and connect at or near the location mentioned above. Are we required to bring one or more wires?

Inquiry submitted 07/24/2013

Response #1:Submitted for consideration.
Response posted 07/29/2013


Response #2:Connection from the new irrigation controller to the existing (18) remote control valves (RCV) downstream of the existing irrigation crossover at Sta "UC1" 24+50 on Sheet IP-3, will not be required. Wire runs should end at the valve cluster (RCV C-7 to C-13). Unless if an addendum is issued, bid per plans and specs.
Response posted 08/05/2013


Response #3:No wires are needed to connect to the existing valves.
Response posted 08/05/2013




Inquiry #2: The irrigation plans on sheet 12 to 13, IP-1 to IP-2, required to reconnect existing remote control valve to the new ICC. It is not clear whether the existing valves will required new wire.

Please clarify if the existing remote control valves will required new wire. Is the wire for the existing valves existing?

Inquiry submitted 07/24/2013

Response #1:Submitted for consideration.
Response posted 07/29/2013


Response #2:All existing remote control valves (RCV) to be relocated will require new armor-clad control and neutral conductors from the ICC, as shown. Any existing CNC wire from the existing system must not be used and should be discarded.
Response posted 07/31/2013




Inquiry #3: Plan sheet 5-7 (PR 1-3) show 7 existing trees to be removed. Should there be an item for the tree removal? Is this paid for in item #22 Roadside Clearing? Please clarify.
Inquiry submitted 08/14/2013

Response #1:Submitted for consideration.
Response posted 08/15/2013


Response #2:Existing trees shown on the plans to be removed are to be considered as part of roadside clearing work, as stated in section 20-7-03B "Roadside Clearing" of the Standard Specifications. There is no separate pay item for tree removal.
Response posted 08/15/2013




Inquiry #4: Please clarify Rock Blanket Vs. Rock Mulch. It seems that the Plan Sheets are detailing Rock Mulch with an edge not Rock Blanket, in addition the Specials and the Standards do not give a Sieve for the Rock nor do they detail a specific edging material. Please explain the type of installation the State is requiring.
Inquiry submitted 08/16/2013

Response #1:Submitted for consideration.
Response posted 08/20/2013


Response #2:Rock blanket must be installed as shown on Landscape Detail Sheet (LD-2) and comply with section 20-12 of the standard specifications, and the special provisions for the project, beginning on page 28 and continuing on page 29. Grading for rock is shown in table 20-12.02D on page 29 of the special provisions. There is no edging required. Partial rock shown in section detail on sheet LD-2 is just a graphical pattern representation of the rock blanket edge and does not indicate a paved edge where the rock blanket would butt up against.
Response posted 08/20/2013




Inquiry #5: There are no specification for new irrigation controllers A, B, and C. Please provide supplier and models.
Inquiry submitted 08/16/2013

Response #1:Submitted for consideration.
Response posted 08/20/2013


Response #2:Irrigation controllers must comply with section 20-3.02H of the standard specifications and page 25 and 26 of the project special provisions.
Response posted 08/20/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.