Topics
- Awards and Recognition
- Annual Reports
- Barrier Aesthetics
- Blue Star Memorial Highways
- Classified Landscaped Freeways
- Community Identification
- Context Sensitive Solutions
- Erosion Control Toolbox
- Estimating
- Gateway Monuments
- Highway Planting
- Mission Bells
- Nonstandard Specification Info
- Policy, Manuals and Procedures
- Publications
- Research
- Roadside Toolbox
- Safety Roadside Rest Area System
- Scenic Highways
- Standard Specifications and Plans
- Transportation Art
- Visual Impact Assessment Outlines
- Visual Impact Assessment Training
- Water Conservation
- Webinars
Contractor Resources
Roadside Management Toolbox
Treatment Beyond the gore Area (1)
| Treatment | Asphalt Concrete | Stamped Asphalt Concrete | Minor Concrete Pavement | Patterned Concrete Pavement | Rock Blanket (Mortared Cobble) |
|
| Click Photo for Detailed Information |
![]() |
![]() |
![]() |
![]() |
||
| Area(s) of use | Urban/Suburban | Urban/Suburban | Urban/Suburban | Urban/Suburban | Urban/Suburban | |
| Est. Installed Cost | $18 - $70/yd2 | $40 - $55/yd2 | $60 - $100/yd2 | $100 - $125/yd2 | $85 - $120/yd2 | |
| Constructability | 7 | 6 | 4 | 4 | 3 | |
| Ease of Repair | 6 | 4 | 4 | 4 | 5 | |
| Context adaptable | Use in areas with a large amount of existing AC | Variable color and texture, match to corridor. | Variable color, match to corridor. | Variable color/texture, match to corridor. | Variable color / texture | |
| Life Cycle (years) | 6-10 | 8-10 | 20+ | 15-20 | 15-20 | |
| Consult with | Maint., L. Arch | Maint., L. Arch | Maint., L. Arch | Maint., L. Arch | Maint., Traffic, L. Arch | |
| Comments | Less effective for controlling weeds than portland cement concrete. | Preferred placement behind curbs or with other edge restraints. Base design is important for correct load bearing capacity. Include soil sterilization under treatment. | Proper structural section and preparation is necessary to prevent cracking and subsequent weed growth. | Proper base design and preparation is necessary to prevent cracking and subsequent weed growth. Matching color and pattern for repairs is difficult. | In gores or other traffic areas cobble "roughness" must be limited, see detail. | |
| 1. Design and treatment of areas beyond the gore shall comply with HDM Chapter 500, Topic 504.2 Freeway Entrances and Exits | ||||||
Updated: Wednesday, May 24, 2012