District 8 San Bernardino/Riverside
DAILY FREEWAY AND HIGHWAY LANE CLOSURE REPORT
Caltrans Public Affairs: (909) 383-4631
      District Traffic Management (DTM) Report: Monday April 21, 2014 8:38 AM  
Closure #  Log # Route County Begin
PM
End
PM
Date
From
Date
To
Time
In
Time
Out
Dir Location /
Additional Information
Remarks
C10XG 36 10 Riv 6.7 5.5 04/21/14 04/22/14 9:01 PM 5:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #2, #4, #3 of 4 lanes
Reason: Bridge Work
 
C10XG 40 10 Riv 6.7 5.5 04/21/14 04/22/14 10:01 PM 7:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #3, #2, #4 of 4 lanes
Reason: Bridge Work
 
C10XG 37 10 Riv 6.7 5.5 04/22/14 04/23/14 9:01 PM 5:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #3, #4, #2 of 4 lanes
Reason: Bridge Work
 
C10XG 41 10 Riv 6.7 5.5 04/22/14 04/23/14 10:01 PM 7:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #4, #2, #3 of 4 lanes
Reason: Bridge Work
 
C10XG 38 10 Riv 6.7 5.5 04/23/14 04/24/14 9:01 PM 5:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #3, #2, #4 of 4 lanes
Reason: Bridge Work
 
C10XG 42 10 Riv 6.7 5.5 04/23/14 04/24/14 10:01 PM 7:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #4, #3, #2 of 4 lanes
Reason: Bridge Work
 
C10XG 39 10 Riv 6.7 5.5 04/24/14 04/25/14 9:01 PM 5:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #4, #3, #2 of 4 lanes
Reason: Bridge Work
 
C10XG 43 10 Riv 6.7 5.5 04/24/14 04/25/14 10:01 PM 7:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #4, #2, #3 of 4 lanes
Reason: Bridge Work
 
C10XG 8 10 Riv 6.7 5.5 04/25/14 04/26/14 9:01 PM 5:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #4, #2, #3 of 4 lanes
Reason: Bridge Work
 
C10XG 9 10 Riv 6.7 5.5 04/25/14 04/26/14 10:01 PM 7:01 AM WB Begin:  Route 60
End:  San Timoteo Cyn Rd/Oak Valley Pkwy
Restriction: #2, #4, #3 of 4 lanes
Reason: Bridge Work
 
C10MI 6 10 Riv 11.3 11.3 03/17/14 04/26/14 6:01 AM 6:01 AM WB Begin: WB Route 10
End:  Sunset Ave
Restriction: Long-term full off ramp closure
Reason: Highway Construction
 
C10MI 7 10 Riv 11.3 11.3 03/17/14 04/26/14 6:01 AM 6:01 AM WB Begin: WB Sunset Ave
End: WB Route 10
Restriction: Long-term full on ramp closure
Reason: Highway Construction
 
C10MI 3 10 Riv 11.3 11.3 04/25/14 08/25/14 10:01 PM 6:01 AM EB Begin: EB Route 10
End: EB Sunset Ave
Restriction: Long-term full off ramp closure
Reason: Roadway Excavation
 
C10MI 4 10 Riv 11.3 11.3 04/25/14 08/25/14 10:01 PM 6:01 AM EB Begin: EB Sunset Ave
End: EB Route 10
Restriction: Long-term full on ramp closure
Reason: Roadway Excavation
 
M10ZA 1 10 Riv 12.9 13.4 04/22/14 04/24/14 9:01 AM 1:01 PM WB Begin:  Route 243/8th St
End:  San Gorgonio Ave
Restriction: #4 of 4 lanes
Reason: Bridge Work
 
C10MI 1 10 Riv 12.9 9.3 04/25/14 04/26/14 10:01 PM 6:01 AM WB Begin:  Route 243/8th St
End:  Highland Springs
Restriction: #3, #4 of 4 lanes
Reason: K-rail Installation
 
M10ZA 1 10 Riv 12.9 13.4 04/28/14 04/30/14 9:01 AM 1:01 PM WB Begin:  Route 243/8th St
End:  San Gorgonio Ave
Restriction: #4 of 4 lanes
Reason: Bridge Work
 
C10NI 7 10 Riv 14.8 16.5 04/21/14 04/25/14 8:01 PM 4:01 AM EB Begin:  E. Ramsey St
End:  Fields Rd
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 1 10 Riv 14.8 16.5 04/25/14 04/26/14 9:01 PM 5:01 AM EB Begin:  E. Ramsey St
End:  Fields Rd
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 11 10 Riv 16.5 14.8 04/21/14 04/25/14 9:01 PM 5:01 AM WB Begin:  Fields Rd
End:  E. Ramsey St
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 2 10 Riv 16.5 14.8 04/25/14 04/26/14 9:01 PM 7:01 AM WB Begin:  Fields Rd
End:  E. Ramsey St
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 15 10 Riv 19.4 24.6 04/21/14 04/22/14 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10XG 8 10 Riv 19.4 8.2 04/21/14 04/22/14 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Pennsylvania Ave
Restriction: #3, #2, #4 of 4 lanes
Reason: Bridge Work
 
C10NI 16 10 Riv 19.4 24.6 04/22/14 04/23/14 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10XG 9 10 Riv 19.4 8.2 04/22/14 04/23/14 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Pennsylvania Ave
Restriction: #2, #4, #3 of 4 lanes
Reason: Bridge Work
 
C10NI 17 10 Riv 19.4 24.6 04/23/14 04/24/14 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10XG 10 10 Riv 19.4 8.2 04/23/14 04/24/14 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Pennsylvania Ave
Restriction: #3, #2, #4 of 4 lanes
Reason: Bridge Work
 
C10NI 18 10 Riv 19.4 24.6 04/24/14 04/25/14 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10XG 11 10 Riv 19.4 8.2 04/24/14 04/25/14 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Pennsylvania Ave
Restriction: #2, #4, #3 of 4 lanes
Reason: Bridge Work
 
C10NI 3 10 Riv 19.4 24.6 04/25/14 04/26/14 9:01 PM 5:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10XG 1 10 Riv 19.4 8.2 04/25/14 04/26/14 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Pennsylvania Ave
Restriction: #3, #2, #4 of 4 lanes
Reason: Bridge Work
 
C10NI 19 10 Riv 24.6 19.4 04/21/14 04/25/14 9:01 PM 5:01 AM WB Begin:  Haugen-Lehman Way
End:  East Cabazon
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 4 10 Riv 24.6 19.4 04/25/14 04/26/14 9:01 PM 7:01 AM WB Begin:  Haugen-Lehman Way
End:  East Cabazon
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 23 10 Riv 27.7 29.7 04/21/14 04/25/14 8:01 PM 4:01 AM EB Begin:  Whitewater River
End:  Route 62
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 5 10 Riv 27.7 29.7 04/25/14 04/26/14 9:01 PM 5:01 AM EB Begin:  Whitewater River
End:  Route 62
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 27 10 Riv 29.7 27.7 04/21/14 04/25/14 9:01 PM 5:01 AM WB Begin:  Route 62
End:  Whitewater River
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
C10NI 6 10 Riv 29.7 27.7 04/25/14 04/26/14 9:01 PM 7:01 AM WB Begin:  Route 62
End:  Whitewater River
Restriction: #1 of 3 lanes
Reason: Median Barrier Work
 
P10YA 11 10 Riv 46.9 57 04/17/14 04/28/14 8:01 AM 9:01 AM EB Begin:  Cook St
End:  Golf Center Pkwy
Restriction: Long-term right shoulder
Reason: Special Event
 
C10XG 44 10 Riv 55.7 56.6 04/21/14 04/26/14 9:01 PM 5:01 AM WB Begin:  Jackson St
End:  44th Ave
Restriction: #2, #3 of 3 lanes
Reason: Bridge Work
 
C10WH 1 10 Riv 58.9 58.9 04/21/14 04/25/14 7:01 AM 4:59 PM WB Begin: WB Route 10
End: WB Dillon Rd
Restriction: Full off ramp closure
Reason: Concrete Pour
 
C10RI 1 10 Riv 72.4 72.4 04/08/14 10/17/14 12:01 AM 11:59 PM EB/WB Begin: EB/WB Restarea ramps EB/WB
End: EB/WB Cactus City Rest Area
Restriction: Long-term full off ramp closure
Reason: Sewer Work
 
C10XG 16 10 Riv 72.4 75 04/21/14 04/26/14 6:01 PM 12:01 PM EB Begin:  Cactus City Rest Area
End:  Aqueduct Wash
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
M15DA 1 15 Riv 6.6 6.6 04/22/14 04/22/14 9:01 AM 2:01 PM SB Begin: SB Route 79/Winchester Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Maintenance Operation
 
C15FF 8 15 Riv 8.7 45.6 04/21/14 04/25/14 9:01 AM 3:01 PM NB Begin:  Route 215
End:  6th St
Restriction: #3, #4, #1 of 4 lanes, right shoulder, left shoulder
Reason: Miscellaneous Work
 
C15UE 14 15 Riv 9.5 10.6 04/26/14 04/26/14 2:01 AM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 35 15 Riv 9.5 10.6 04/26/14 04/27/14 11:01 PM 7:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 42 15 Riv 9.5 13.6 04/26/14 04/27/14 11:01 PM 7:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 15 15 Riv 9.5 10.6 04/27/14 04/27/14 3:01 AM 6:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 36 15 Riv 9.5 10.6 04/27/14 04/28/14 9:01 PM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 43 15 Riv 9.5 13.6 04/27/14 04/28/14 9:01 PM 5:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 13 15 Riv 9.5 10.6 04/28/14 04/28/14 12:01 AM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 37 15 Riv 9.5 10.6 04/28/14 04/29/14 9:01 PM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 44 15 Riv 9.5 13.6 04/28/14 04/29/14 9:01 PM 5:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 1 15 Riv 9.5 10.6 04/28/14 04/29/14 10:30 PM 5:30 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 38 15 Riv 9.5 10.6 04/29/14 04/30/14 9:01 PM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 45 15 Riv 9.5 13.6 04/29/14 04/30/14 9:01 PM 5:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 3 15 Riv 9.5 10.6 04/30/14 04/30/14 12:01 AM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 39 15 Riv 9.5 10.6 04/30/14 05/01/14 9:01 PM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15UE 46 15 Riv 9.5 13.6 04/30/14 05/01/14 9:01 PM 5:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 5 15 Riv 9.5 10.6 05/01/14 05/01/14 12:01 AM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 40 15 Riv 9.5 10.6 05/01/14 05/02/14 9:01 PM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 47 15 Riv 9.5 13.6 05/01/14 05/02/14 9:01 PM 5:01 AM SB Begin:  Murrieta Hot Springs
End:  Clinton Keith Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15UE 7 15 Riv 9.5 10.6 05/02/14 05/02/14 12:01 AM 5:01 AM NB Begin:  Murrieta Hot Springs
End:  Kalmia St/California Oaks Rd
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 17 15 Riv 10.6 9.5 04/26/14 04/26/14 12:01 AM 6:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 19 15 Riv 10.6 9.5 04/26/14 04/27/14 11:01 PM 7:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 26 15 Riv 10.6 10.6 04/26/14 04/27/14 11:01 PM 7:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 20 15 Riv 10.6 10.6 04/27/14 04/28/14 9:01 PM 5:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 16 15 Riv 10.6 9.5 04/27/14 04/28/14 10:01 PM 4:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 21 15 Riv 10.6 10.6 04/28/14 04/29/14 9:01 PM 5:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 8 15 Riv 10.6 9.5 04/28/14 04/29/14 10:01 PM 4:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 22 15 Riv 10.6 10.6 04/29/14 04/30/14 9:01 PM 5:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 9 15 Riv 10.6 9.5 04/29/14 04/30/14 10:01 PM 4:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 23 15 Riv 10.6 10.6 04/30/14 05/01/14 9:01 PM 5:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 11 15 Riv 10.6 9.5 04/30/14 05/01/14 10:01 PM 4:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15UE 24 15 Riv 10.6 10.6 05/01/14 05/02/14 9:01 PM 5:01 AM NB Begin: NB Murrieta Hot Springs
End: NB Kalmia St/California Oaks Rd
Restriction: Full on ramp closure
Reason: Bridge Work
 
C15UE 12 15 Riv 10.6 9.5 05/01/14 05/02/14 10:01 PM 4:01 AM SB Begin:  Kalmia St/California Oaks Rd
End:  Murrieta Hot Springs
Restriction: Full highway closure
Reason: Bridge Work
 
C15BF 37 15 Riv 30.4 33.3 04/21/14 04/22/14 10:01 PM 6:01 AM NB Begin:  Indian Truck Trail
End:  Temescal Canyon Rd
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
M15EA 1 15 Riv 30.4 33.3 04/22/14 04/22/14 9:01 AM 1:01 PM SB Begin:  Indian Truck Trail
End:  Temescal Canyon Rd
Restriction: #1 of 3 lanes, left shoulder
Reason: Accident Investigation
 
C15BF 30 15 Riv 30.4 33.3 04/22/14 04/24/14 10:01 PM 6:01 AM NB Begin:  Indian Truck Trail
End:  Temescal Canyon Rd
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15BF 33 15 Riv 33.3 30.4 04/21/14 04/26/14 10:01 PM 6:01 AM SB Begin:  Temescal Canyon Rd
End:  Indian Truck Trail
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15FF 18 15 Riv 37.8 43.6 04/22/14 04/25/14 10:01 PM 5:01 AM NB Begin:  El Cerrito Rd
End:  2nd St
Restriction: #3, #1 of 3 lanes
Reason: Miscellaneous Work
 
C15FF 6 15 Riv 37.8 43.6 04/28/14 04/30/14 10:01 PM 5:01 AM SB Begin:  El Cerrito Rd
End:  2nd St
Restriction: #1 of 4 lanes
Reason: Miscellaneous Work
 
C15BF 36 15 Riv 38.7 39.4 04/21/14 04/22/14 12:01 AM 4:01 AM NB Begin:  Ontario Ave
End:  Old Temescal Rd
Restriction: #3, #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 28 15 Riv 38.7 39.4 04/22/14 04/23/14 8:01 PM 4:01 AM NB Begin:  Ontario Ave
End:  Old Temescal Rd
Restriction: #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 18 15 Riv 38.7 39.4 04/23/14 04/23/14 12:01 AM 4:01 AM NB Begin:  Ontario Ave
End:  Old Temescal Rd
Restriction: #2, #3, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 19 15 Riv 38.7 39.4 04/23/14 04/24/14 8:01 PM 4:01 AM NB Begin:  Ontario Ave
End:  Old Temescal Rd
Restriction: #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 10 15 Riv 38.7 39.4 04/24/14 04/24/14 12:01 AM 4:01 AM NB Begin:  Ontario Ave
End:  Old Temescal Rd
Restriction: #1, #3, #2 of 4 lanes
Reason: Bridge Work
 
C15FF 3 15 Riv 41 37.8 04/21/14 04/30/14 9:01 AM 3:01 PM SB Begin:  6th St
End:  El Cerrito Rd
Restriction: #1 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C15BF 35 15 Riv 41.5 46.2 04/21/14 04/22/14 10:01 PM 6:01 AM NB Begin:  Route 91
End:  Santa Ana River
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15BF 38 15 Riv 41.5 38.7 04/21/14 04/22/14 10:01 PM 6:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 46 15 Riv 41.5 41.5 04/21/14 04/22/14 10:01 PM 6:01 AM SB Begin: SB Route 15
End: EB Route 91
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15BF 42 15 Riv 41.5 38.7 04/22/14 04/22/14 12:01 AM 4:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #2, #1, #3 of 4 lanes
Reason: Bridge Work
 
C15BF 27 15 Riv 41.5 46.2 04/22/14 04/23/14 10:01 PM 6:01 AM NB Begin:  Route 91
End:  Santa Ana River
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15BF 39 15 Riv 41.5 38.7 04/22/14 04/23/14 10:01 PM 6:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 47 15 Riv 41.5 41.5 04/22/14 04/23/14 10:01 PM 6:01 AM SB Begin: SB Route 15
End: EB Route 91
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15BF 43 15 Riv 41.5 38.7 04/23/14 04/23/14 12:01 AM 4:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #2, #1, #3 of 4 lanes
Reason: Bridge Work
 
C15BF 17 15 Riv 41.5 46.2 04/23/14 04/24/14 10:01 PM 6:01 AM NB Begin:  Route 91
End:  Santa Ana River
Restriction: #1, #2 of 3 lanes
Reason: Bridge Work
 
C15BF 40 15 Riv 41.5 38.7 04/23/14 04/24/14 10:01 PM 6:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 48 15 Riv 41.5 41.5 04/23/14 04/24/14 10:01 PM 6:01 AM SB Begin: SB Route 15
End: EB Route 91
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15BF 44 15 Riv 41.5 38.7 04/24/14 04/24/14 12:01 AM 4:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #3, #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 41 15 Riv 41.5 38.7 04/24/14 04/25/14 10:01 PM 6:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 49 15 Riv 41.5 41.5 04/24/14 04/25/14 10:01 PM 6:01 AM SB Begin: SB Route 15
End: EB Route 91
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15BF 45 15 Riv 41.5 38.7 04/25/14 04/25/14 12:01 AM 4:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #1, #3, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 6 15 Riv 41.5 38.7 04/25/14 04/26/14 10:01 PM 6:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 8 15 Riv 41.5 41.5 04/25/14 04/26/14 10:01 PM 6:01 AM SB Begin: SB Route 15
End: EB Route 91
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15BF 7 15 Riv 41.5 38.7 04/26/14 04/26/14 12:01 AM 4:01 AM SB Begin:  Route 91
End:  Ontario Ave
Restriction: #2, #3, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 32 15 Riv 46.2 41.5 04/21/14 04/26/14 10:01 PM 6:01 AM SB Begin:  Santa Ana River
End:  Route 91
Restriction: #2, #1 of 3 lanes
Reason: Bridge Work
 
C15BF 34 15 Riv 51.3 52.3 04/21/14 04/22/14 12:01 AM 4:01 AM NB Begin:  Riverside Ave
End:  Philadelphia Ave
Restriction: #2, #3, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 25 15 Riv 51.3 52.3 04/22/14 04/23/14 8:01 PM 4:01 AM NB Begin:  Riverside Ave
End:  Philadelphia Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 15 15 Riv 51.3 52.3 04/23/14 04/23/14 12:01 AM 4:01 AM NB Begin:  Riverside Ave
End:  Philadelphia Ave
Restriction: #3, #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 16 15 Riv 51.3 52.3 04/23/14 04/24/14 8:01 PM 4:01 AM NB Begin:  Riverside Ave
End:  Philadelphia Ave
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 9 15 Riv 51.3 52.3 04/24/14 04/24/14 12:01 AM 4:01 AM NB Begin:  Riverside Ave
End:  Philadelphia Ave
Restriction: #1, #2, #3 of 4 lanes
Reason: Bridge Work
 
C15EF 1 15 Riv 51.5 51.5 04/25/14 04/28/14 11:01 PM 3:59 AM SB Begin: SB Route 60
End: SB Route 60
Restriction: Long-term full connector ramp closure
Reason: Bridge Work
 
C15BF 31 15 Riv 52.3 51.5 04/21/14 04/22/14 10:01 PM 6:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 21 15 Riv 52.3 51.5 04/22/14 04/22/14 12:01 AM 4:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #2, #3, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 22 15 Riv 52.3 51.5 04/22/14 04/23/14 10:01 PM 6:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 11 15 Riv 52.3 51.5 04/23/14 04/23/14 12:01 AM 4:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #1, #2, #3 of 4 lanes
Reason: Bridge Work
 
C15BF 12 15 Riv 52.3 51.5 04/23/14 04/24/14 10:01 PM 6:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 5 15 Riv 52.3 51.5 04/24/14 04/24/14 12:01 AM 4:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #3, #2, #1 of 4 lanes
Reason: Bridge Work
 
C15BF 6 15 Riv 52.3 51.5 04/24/14 04/25/14 10:01 PM 6:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #1, #2 of 4 lanes
Reason: Bridge Work
 
C15BF 4 15 Riv 52.3 51.5 04/25/14 04/25/14 12:01 AM 4:01 AM SB Begin:  Philadelphia Ave
End:  Route 60
Restriction: #2, #3, #1 of 4 lanes
Reason: Bridge Work
 
M60EA 1 60 Riv 1.6 1.6 04/22/14 04/24/14 9:01 AM 2:01 PM EB Begin: EB Route 60
End:  Mission Blvd/Van Buren Blvd
Restriction: Full off ramp closure
Reason: Maintenance Operation
 
C60KA 2 60 Riv 12 13.3 04/21/14 04/22/14 9:01 PM 5:01 AM EB Begin:  Route 215/Riverside
End:  Day St
Restriction: #1, #2 of 3 lanes
Reason: Grinding and Paving
 
C60RB 2 60 Riv 12 12 04/21/14 04/22/14 10:01 PM 5:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60KA 3 60 Riv 12 13.3 04/22/14 04/23/14 9:01 PM 5:01 AM EB Begin:  Route 215/Riverside
End:  Day St
Restriction: #1, #2 of 3 lanes
Reason: Grinding and Paving
 
C60RB 3 60 Riv 12 12 04/22/14 04/23/14 10:01 PM 5:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60KA 4 60 Riv 12 13.3 04/23/14 04/24/14 9:01 PM 5:01 AM EB Begin:  Route 215/Riverside
End:  Day St
Restriction: #2, #1 of 3 lanes
Reason: Grinding and Paving
 
C60RB 4 60 Riv 12 12 04/23/14 04/24/14 10:01 PM 5:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60KA 5 60 Riv 12 13.3 04/24/14 04/25/14 10:01 PM 5:01 AM EB Begin:  Route 215/Riverside
End:  Day St
Restriction: #2, #1 of 3 lanes
Reason: Grinding and Paving
 
C60RB 5 60 Riv 12 12 04/24/14 04/25/14 10:01 PM 5:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60RB 1 60 Riv 12 12 04/25/14 04/26/14 10:01 PM 7:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60RB 2 60 Riv 12 12 04/26/14 04/27/14 11:01 PM 7:01 AM EB Begin: EB Route 60
End: NB/SB Route 215/Riverside
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C60KA 12 60 Riv 12.2 12 04/21/14 04/22/14 9:01 PM 3:01 AM WB Begin:  Route 215/Moreno Valley IC
End:  Route 215/Riverside
Restriction: #2 of 2 lanes
Reason: Grinding and Paving
 
C60KA 26 60 Riv 12.2 12.2 04/21/14 04/22/14 9:01 PM 4:01 AM WB Begin: WB Route 60
End: NB Route 215/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C60KA 13 60 Riv 12.2 12 04/22/14 04/23/14 9:01 PM 3:01 AM WB Begin:  Route 215/Moreno Valley IC
End:  Route 215/Riverside
Restriction: #2 of 2 lanes
Reason: Grinding and Paving
 
C60KA 27 60 Riv 12.2 12.2 04/22/14 04/23/14 9:01 PM 4:01 AM WB Begin: WB Route 60
End: NB Route 215/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C60KA 14 60 Riv 12.2 12 04/23/14 04/24/14 9:01 PM 3:01 AM WB Begin:  Route 215/Moreno Valley IC
End:  Route 215/Riverside
Restriction: #2 of 2 lanes
Reason: Grinding and Paving
 
C60KA 28 60 Riv 12.2 12.2 04/23/14 04/24/14 9:01 PM 4:01 AM WB Begin: WB Route 60
End: NB Route 215/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C60KA 15 60 Riv 12.2 12 04/24/14 04/25/14 9:01 PM 3:01 AM WB Begin:  Route 215/Moreno Valley IC
End:  Route 215/Riverside
Restriction: #2 of 2 lanes
Reason: Grinding and Paving
 
C60KA 29 60 Riv 12.2 12.2 04/24/14 04/25/14 9:01 PM 4:01 AM WB Begin: WB Route 60
End: NB Route 215/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C60KA 17 60 Riv 13.3 12.2 04/21/14 04/25/14 8:01 PM 4:01 AM WB Begin:  Day St
End:  Route 215/Moreno Valley IC
Restriction: #1, #2 of 3 lanes
Reason: Grinding and Paving
 
P60KB 1 60 Riv 30.5 30.5 04/22/14 04/24/14 9:01 AM 3:01 PM WB Begin: WB Route 10
End: WB Route 10
Restriction: Right shoulder
Reason: Survey Work
 
C62QA 1 62 Riv 0 6.5 04/21/14 04/26/14 7:01 PM 7:01 AM EB Begin:  Route 10
End:  Indian Canyon Ave
Restriction: #2, #1 of 4 lanes
Reason: K-rail Removal
 
C74GA 1 74 Riv 35.9 35.9 04/21/14 04/21/14 6:01 AM 3:01 PM EB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 6 74 Riv 35.9 35.9 04/21/14 04/21/14 7:01 AM 5:01 PM WB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 2 74 Riv 35.9 35.9 04/22/14 04/22/14 6:01 AM 3:01 PM EB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 7 74 Riv 35.9 35.9 04/22/14 04/22/14 7:01 AM 5:01 PM WB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 3 74 Riv 35.9 35.9 04/23/14 04/23/14 6:01 AM 3:01 PM EB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 8 74 Riv 35.9 35.9 04/23/14 04/23/14 7:01 AM 5:01 PM WB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 4 74 Riv 35.9 35.9 04/24/14 04/24/14 6:01 AM 3:01 PM EB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 9 74 Riv 35.9 35.9 04/24/14 04/24/14 7:01 AM 5:01 PM WB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 5 74 Riv 35.9 35.9 04/25/14 04/25/14 6:01 AM 2:01 PM EB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74GA 10 74 Riv 35.9 35.9 04/25/14 04/25/14 7:01 AM 5:01 PM WB Begin:  California Ave
End:  California Ave
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
 
C74NA 1 74 Riv 48.8 49.2 04/21/14 04/25/14 7:01 AM 3:30 PM EB/WB Begin:  Rouse Hill Truck trail
End:  Wilson Way
Restriction: One-way traffic control
Reason: Emergency Work
 
C74MA 1 74 Riv 73.1 76.9 04/21/14 04/26/14 6:01 PM 10:01 AM WB Begin:  Bull Canyon Rd
End:  Santa Rosa Rd
Restriction: One-way traffic control
Reason: Bridge Work
 
C79SA 1 79 Riv 2.3 2.3 04/21/14 04/26/14 6:01 PM 12:01 PM NB Begin:  Route 371
End:  Route 371
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
C79SA 9 79 Riv 7.1 7.1 04/21/14 04/26/14 7:01 PM 5:01 AM NB Begin:  Temecula Creek
End:  Temecula Creek
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
C79SA 17 79 Riv 33.8 33.8 04/21/14 04/26/14 6:01 PM 12:01 PM NB Begin:  Gilman Springs Rd
End:  Gilman Springs Rd
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
C79RA 2 79 Riv 39.3 40.4 04/21/14 04/26/14 9:01 PM 6:01 AM EB Begin:  California Ave
End:  Beaumont Ave
Restriction: #1, #2 of 2 lanes
Reason: Traffic Signal Work
 
C79SA 25 79 Riv 40.1 40.4 04/21/14 04/26/14 6:01 PM 1:01 PM NB Begin:  First St
End:  Fourth St
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
C79RA 7 79 Riv 40.4 39.3 04/21/14 04/26/14 9:01 PM 6:01 AM WB Begin:  Beaumont Ave
End:  California Ave
Restriction: #2, #1 of 2 lanes
Reason: Traffic Signal Work
 
C86IA 1 86 Riv 11.6 12.1 04/21/14 04/26/14 6:01 PM 1:01 PM NB Begin:  65th Ave (Rte 86S)
End:  64th Ave (Rte 86S)
Restriction: #2 of 2 lanes
Reason: Bridge Work
 
C91LB 1 91 Riv 4.2 4.2 04/21/14 04/21/14 9:30 AM 3:30 PM WB Begin:  Maple St
End: WB Route 91
Restriction: Partial on ramp closure (right shoulder)
Reason: Electrical Work
 
C91LB 5 91 Riv 6.3 10.8 04/23/14 04/24/14 10:01 PM 2:01 AM EB/WB Begin:  Main St Uc
End:  Pierce St
Restriction: Moving closure - left hov, right shoulder
Reason: Maintenance Operation
 
C91BC 1 91 Riv 6.6 9.2 04/21/14 04/23/14 9:01 AM 3:01 PM WB Begin:  East Grand Blvd
End:  Mckinley St
Restriction: #3 of 3 lanes
Reason: Miscellaneous Work
 
C91BC 1 91 Riv 6.6 9.2 04/28/14 04/30/14 10:01 PM 5:01 AM EB Begin:  East Grand Blvd
End:  Mckinley St
Restriction: #3 of 3 lanes
Reason: Miscellaneous Work
 
M91CA 1 91 Riv 12 13 04/21/14 04/21/14 9:01 AM 1:01 PM EB Begin:  La Sierra Ave
End:  Tyler St
Restriction: #3 of 3 lanes, auxiliary lane
Reason: Maintenance Operation
 
C91HA 7 91 Riv 13.9 13.9 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 56 91 Riv 15.6 20.5 04/21/14 04/25/14 10:01 PM 5:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #1, #2, #3 of 3 lanes, right shoulder, median, left shoulder
Reason: K-rail Installation
 
C91HA 10 91 Riv 15.6 20.5 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #1, #2, #3 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 97 91 Riv 16.7 16.7 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 51 91 Riv 16.7 16.7 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 98 91 Riv 16.7 16.7 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 52 91 Riv 16.7 16.7 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 99 91 Riv 16.7 16.7 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 53 91 Riv 16.7 16.7 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 100 91 Riv 16.7 16.7 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 54 91 Riv 16.7 16.7 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 9 91 Riv 16.7 16.7 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 81 91 Riv 17.8 17.8 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 31 91 Riv 17.8 17.8 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 46 91 Riv 17.8 17.8 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 82 91 Riv 17.8 17.8 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 32 91 Riv 17.8 17.8 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 47 91 Riv 17.8 17.8 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 83 91 Riv 17.8 17.8 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 33 91 Riv 17.8 17.8 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 48 91 Riv 17.8 17.8 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 84 91 Riv 17.8 17.8 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 34 91 Riv 17.8 17.8 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 49 91 Riv 17.8 17.8 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 4 91 Riv 17.8 17.8 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 8 91 Riv 17.8 17.8 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 14 91 Riv 17.8 17.8 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 102 91 Riv 18 18 04/21/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 18 91 Riv 18 18 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 92 91 Riv 18.4 18.4 04/16/14 04/21/14 5:01 AM 5:01 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Long-term full off ramp closure
Reason: K-rail Installation
 
C91HA 87 91 Riv 18.4 18.4 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 92 91 Riv 18.4 18.4 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 36 91 Riv 18.4 18.4 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 41 91 Riv 18.4 18.4 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 21 91 Riv 18.4 18.4 04/22/14 04/22/14 5:01 AM 5:01 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 88 91 Riv 18.4 18.4 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 93 91 Riv 18.4 18.4 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 37 91 Riv 18.4 18.4 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 42 91 Riv 18.4 18.4 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 22 91 Riv 18.4 18.4 04/23/14 04/23/14 5:01 AM 5:01 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 89 91 Riv 18.4 18.4 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 94 91 Riv 18.4 18.4 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 38 91 Riv 18.4 18.4 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 43 91 Riv 18.4 18.4 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 23 91 Riv 18.4 18.4 04/24/14 04/24/14 5:01 AM 5:01 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 90 91 Riv 18.4 18.4 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 95 91 Riv 18.4 18.4 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 39 91 Riv 18.4 18.4 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 44 91 Riv 18.4 18.4 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 5 91 Riv 18.4 18.4 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 6 91 Riv 18.4 18.4 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 15 91 Riv 18.4 18.4 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 16 91 Riv 18.4 18.4 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 2 91 Riv 18.4 18.4 04/26/14 04/28/14 5:01 AM 5:01 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Long-term full off ramp closure
Reason: K-rail Installation
 
C91HA 71 91 Riv 20 20 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 76 91 Riv 20 20 04/21/14 04/22/14 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 26 91 Riv 20 20 04/21/14 04/22/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 72 91 Riv 20 20 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 77 91 Riv 20 20 04/22/14 04/23/14 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 27 91 Riv 20 20 04/22/14 04/23/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 73 91 Riv 20 20 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 78 91 Riv 20 20 04/23/14 04/24/14 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 28 91 Riv 20 20 04/23/14 04/24/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 74 91 Riv 20 20 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 79 91 Riv 20 20 04/24/14 04/25/14 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 29 91 Riv 20 20 04/24/14 04/25/14 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 3 91 Riv 20 20 04/25/14 04/26/14 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 13 91 Riv 20 20 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 61 91 Riv 20.5 15.6 04/21/14 04/25/14 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #1, #2 of 3 lanes, right shoulder, median, left shoulder
Reason: K-rail Installation
 
C91HA 11 91 Riv 20.5 15.6 04/25/14 04/26/14 11:01 PM 6:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #2, #3, #1 of 3 lanes, left shoulder, right shoulder, median
Reason: K-rail Installation
 
C91HB 2 91 Riv 21.7 21.7 04/21/14 04/25/14 10:01 PM 6:01 AM EB Begin: EB Route 91
End: WB Route 60
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C91HB 1 91 Riv 21.7 21.7 04/25/14 04/27/14 11:01 PM 7:01 AM EB Begin: EB Route 91
End: WB Route 60
Restriction: Full connector ramp closure
Reason: Highway Construction
 
P111CA 1 111 Riv 49.7 50.8 04/21/14 05/02/14 8:01 AM 5:01 PM EB Begin:  Mission Dr
End:  Tamarisk Rd
Restriction: #3, #2 of 3 lanes (on local cross-street)
Reason: Utility Work
 
M177AA 1 177 Riv 5.9 8.9 04/22/14 05/02/14 7:01 AM 2:01 PM NB/SB Begin:  Carr Rd
End:  Dirt Rd
Restriction: One-way traffic control
Reason: Crack Seal Operation
 
C215HD 1 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 6 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 11 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 16 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 21 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 26 215 Riv 10.7 10.7 04/21/14 04/21/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 2 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 7 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 12 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 17 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 22 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 27 215 Riv 10.7 10.7 04/22/14 04/22/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 3 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 8 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 13 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 18 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 23 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 28 215 Riv 10.7 10.7 04/23/14 04/23/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 4 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 9 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 14 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 19 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 24 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 29 215 Riv 10.7 10.7 04/24/14 04/24/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 5 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 10 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 15 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 20 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 25 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 30 215 Riv 10.7 10.7 04/25/14 04/25/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 1 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 6 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 11 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 16 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 21 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 26 215 Riv 10.7 10.7 04/28/14 04/28/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 2 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 7 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 12 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 17 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 22 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 27 215 Riv 10.7 10.7 04/29/14 04/29/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 3 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 8 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM NB Begin: NB Interchange 10.5
End: NB Interchange 11.8
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 13 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 18 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End: SB Interchange 10.5
Restriction: Partial on ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 23 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM SB Begin:  Interchange 11.8
End:  Interchange 10.5
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 28 215 Riv 10.7 10.7 04/30/14 04/30/14 7:01 AM 2:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 14 215 Riv 10.7 11.8 05/01/14 05/01/14 7:01 AM 2:59 PM NB Begin:  Los Alamos Rd
End:  Post Mile 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 34 215 Riv 10.7 10.7 05/01/14 05/01/14 7:01 AM 2:59 PM NB Begin: NB Los Alamos Rd
End: NB Route 215
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 39 215 Riv 10.7 10.7 05/01/14 05/01/14 7:01 AM 2:59 PM NB Begin: NB Route 215
End: NB Los Alamos Rd
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 44 215 Riv 10.7 10.7 05/01/14 05/01/14 7:01 AM 2:59 PM SB Begin: SB Los Alamos Rd
End: SB Route 215
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 49 215 Riv 10.7 10.7 05/01/14 05/01/14 7:01 AM 1:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (right shoulder, left shoulder)
Reason: Landscape Work
 
C215HD 15 215 Riv 10.7 10.7 05/02/14 05/02/14 7:01 AM 2:59 PM NB Begin:  Interchange 10.5
End:  Interchange 11.8
Restriction: Right shoulder
Reason: Landscape Work
 
C215HD 35 215 Riv 10.7 10.7 05/02/14 05/02/14 7:01 AM 2:59 PM NB Begin: NB Los Alamos Rd
End: NB Route 215
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 40 215 Riv 10.7 10.7 05/02/14 05/02/14 7:01 AM 2:59 PM NB Begin: NB Route 215
End: NB Los Alamos Rd
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 45 215 Riv 10.7 10.7 05/02/14 05/02/14 7:01 AM 2:59 PM SB Begin: SB Los Alamos Rd
End: SB Route 215
Restriction: Partial on ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215HD 50 215 Riv 10.7 10.7 05/02/14 05/02/14 7:01 AM 1:59 PM SB Begin: SB Interchange 11.8
End:  Interchange 10.5
Restriction: Partial off ramp closure (left shoulder, right shoulder)
Reason: Landscape Work
 
C215ZC 1 215 Riv 23.5 18.5 04/21/14 04/22/14 9:01 PM 4:01 AM SB Begin:  Route 74
End:  Newport Rd
Restriction: #1, #2 of 2 lanes
Reason: Litter Removal
 
C215ZC 21 215 Riv 27.2 27.2 09/23/13 09/22/14 5:01 AM 6:01 AM NB Begin: NB D St
End: NB Route 215
Restriction: Long-term full on ramp closure
Reason: Bridge Work
 
C215MC 4 215 Riv 32.3 35.8 04/22/14 04/26/14 9:01 PM 5:01 AM NB Begin:  Harley Knox Road
End:  Cactus Ave
Restriction: #3, #1, #2 of 3 lanes
Reason: K-rail Removal
 
C215MC 7 215 Riv 35.8 35.8 04/22/14 04/23/14 7:01 PM 5:01 AM NB Begin: NB Harley Knox Road
End: NB Cactus Ave
Restriction: Full on ramp closure
Reason: K-rail Removal
 
C215MC 1 215 Riv 35.8 32.3 04/22/14 04/26/14 9:01 PM 5:01 AM SB Begin:  Cactus Ave
End:  Harley Knox Road
Restriction: #2, #3, #1 of 3 lanes
Reason: K-rail Removal
 
C215HC 2 215 Riv 37.4 39.5 04/21/14 04/25/14 10:01 PM 3:01 AM NB Begin:  Eucalyptus Ave
End:  Central Ave
Restriction: #1, #2 of 2 lanes
Reason: Grinding and Paving
 
C215HC 21 215 Riv 38.3 38.3 04/21/14 04/22/14 9:01 PM 3:01 AM SB Begin: SB Route 215
End: EB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C215AD 141 215 Riv 38.3 38.3 04/21/14 04/22/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: EB/WB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C215HC 22 215 Riv 38.3 38.3 04/22/14 04/23/14 9:01 PM 3:01 AM SB Begin: SB Route 215
End: EB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C215AD 142 215 Riv 38.3 38.3 04/22/14 04/23/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: EB/WB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C215HC 23 215 Riv 38.3 38.3 04/23/14 04/24/14 9:01 PM 3:01 AM SB Begin: SB Route 215
End: EB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C215AD 143 215 Riv 38.3 38.3 04/23/14 04/25/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: EB/WB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C215HC 24 215 Riv 38.3 38.3 04/24/14 04/25/14 11:01 PM 3:01 AM SB Begin: SB Route 215
End: EB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: AC Paving
 
C215AD 55 215 Riv 38.3 38.3 04/25/14 04/27/14 11:01 PM 7:01 AM SB Begin: SB Route 215
End: EB/WB Route 60/Moreno Valley IC
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C215HC 17 215 Riv 38.9 38.9 04/21/14 04/25/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Box Springs Rd/Fair Isle Dr
Restriction: Full off ramp closure
Reason: Grinding and Paving
 
C215HC 13 215 Riv 39.5 38.9 04/21/14 04/24/14 8:01 PM 4:01 AM SB Begin:  Central Ave
End:  Box Springs Rd/Fair Isle Dr
Restriction: #1, #2, #3 of 4 lanes
Reason: Grinding and Paving
 
C215HC 12 215 Riv 39.5 38.9 04/24/14 04/25/14 9:01 PM 4:01 AM SB Begin:  Central Ave
End:  Box Springs Rd/Fair Isle Dr
Restriction: #1, #2, #3 of 4 lanes
Reason: Grinding and Paving
 
C215AD 116 215 Riv 43.3 45.3 04/21/14 04/22/14 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #3, #1 of 3 lanes
Reason: Highway Construction
 
C215AD 111 215 Riv 43.3 45.3 04/21/14 04/22/14 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3, #2 of 3 lanes
Reason: Highway Construction
 
C215AD 117 215 Riv 43.3 45.3 04/22/14 04/23/14 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #3, #1 of 3 lanes
Reason: Highway Construction
 
C215AD 112 215 Riv 43.3 45.3 04/22/14 04/23/14 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #1, #3 of 3 lanes
Reason: Highway Construction
 
C215AD 118 215 Riv 43.3 45.3 04/23/14 04/24/14 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #3, #1 of 3 lanes
Reason: Highway Construction
 
C215AD 113 215 Riv 43.3 45.3 04/23/14 04/24/14 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #1, #3 of 3 lanes
Reason: Highway Construction
 
C215AD 119 215 Riv 43.3 45.3 04/24/14 04/25/14 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #2, #1 of 3 lanes
Reason: Highway Construction
 
C215AD 114 215 Riv 43.3 45.3 04/24/14 04/25/14 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #2, #3 of 3 lanes
Reason: Highway Construction
 
C215AD 43 215 Riv 43.3 45.3 04/25/14 04/26/14 10:01 PM 7:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #1, #2 of 3 lanes
Reason: Highway Construction
 
C215AD 45 215 Riv 43.3 45.3 04/25/14 04/27/14 11:01 PM 7:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3, #2 of 3 lanes
Reason: Highway Construction
 
C215AD 11 215 Riv 43.9 43.9 04/21/14 04/22/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 15 215 Riv 43.9 43.9 04/21/14 04/22/14 9:01 PM 5:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 21 215 Riv 43.9 43.9 04/21/14 04/22/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 36 215 Riv 43.9 43.9 04/21/14 04/22/14 9:01 PM 5:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 12 215 Riv 43.9 43.9 04/22/14 04/23/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 16 215 Riv 43.9 43.9 04/22/14 04/23/14 9:01 PM 5:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 22 215 Riv 43.9 43.9 04/22/14 04/23/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 37 215 Riv 43.9 43.9 04/22/14 04/23/14 9:01 PM 5:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 13 215 Riv 43.9 43.9 04/23/14 04/24/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 17 215 Riv 43.9 43.9 04/23/14 04/24/14 9:01 PM 5:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 23 215 Riv 43.9 43.9 04/23/14 04/24/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 38 215 Riv 43.9 43.9 04/23/14 04/24/14 9:01 PM 5:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 14 215 Riv 43.9 43.9 04/24/14 04/25/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 18 215 Riv 43.9 43.9 04/24/14 04/25/14 9:01 PM 5:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 24 215 Riv 43.9 43.9 04/24/14 04/25/14 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 39 215 Riv 43.9 43.9 04/24/14 05/05/14 9:01 PM 5:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 6 215 Riv 43.9 43.9 04/25/14 04/26/14 10:01 PM 7:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 1 215 Riv 43.9 43.9 04/25/14 04/26/14 11:01 PM 7:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 11 215 Riv 43.9 43.9 04/25/14 04/26/14 11:01 PM 7:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 4 215 Riv 43.9 43.9 04/26/14 04/27/14 11:01 PM 7:01 AM NB Begin: NB Route 215
End: NB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 5 215 Riv 43.9 43.9 04/26/14 04/27/14 11:01 PM 7:01 AM NB Begin: NB Columbia Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 10 215 Riv 43.9 43.9 04/26/14 04/27/14 11:01 PM 7:01 AM SB Begin: SB Route 215
End: SB Columbia Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 12 215 Riv 43.9 43.9 04/26/14 04/27/14 11:01 PM 7:01 AM SB Begin: SB Columbia Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 7 215 Riv 45 45 04/21/14 04/22/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 31 215 Riv 45 45 04/21/14 04/22/14 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 8 215 Riv 45 45 04/22/14 04/23/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 32 215 Riv 45 45 04/22/14 04/23/14 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 9 215 Riv 45 45 04/23/14 04/24/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 33 215 Riv 45 45 04/23/14 04/24/14 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 10 215 Riv 45 45 04/24/14 04/25/14 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 34 215 Riv 45 45 04/24/14 04/25/14 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 2 215 Riv 45 45 04/25/14 04/26/14 10:01 PM 7:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 7 215 Riv 45 45 04/25/14 04/26/14 11:01 PM 7:01 AM SB Begin: SB Route 215
End: SB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 13 215 Riv 45 45 04/25/14 04/26/14 11:01 PM 7:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215AD 3 215 Riv 45 45 04/26/14 04/27/14 11:01 PM 7:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215AD 14 215 Riv 45 45 04/26/14 04/27/14 11:01 PM 7:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C243BA 1 243 Riv 0 7.5 04/22/14 04/25/14 8:01 AM 5:01 PM NB/SB Begin:  Route 243
End:  Marion Ridge Dr
Restriction: One-way traffic control
Reason: Pavement Marker Replacement
 
T371BA 1 371 Riv 70.8 72.8 04/21/14 04/21/14 8:30 AM 1:01 PM NB/SB Begin:  Bahrman Rd
End:  Kirby Rd
Restriction: One-way traffic control
Reason: Emergency Work
 
M10CA 1 10 SBd 0 11.1 04/24/14 04/24/14 9:01 AM 3:01 PM EB/WB Begin:  Mills Ave
End:  Etiwanda Ave
Restriction: Moving closure - left shoulder, left hov
Reason: Sweeping Operation
 
M10CA 2 10 SBd 0 11.1 04/25/14 04/25/14 9:01 AM 2:01 PM EB/WB Begin:  Mills Ave
End:  Etiwanda Ave
Restriction: Moving closure - left shoulder, left hov
Reason: Sweeping Operation
 
C10HG 31 10 SBd 11.5 15.2 04/21/14 04/22/14 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #1, #2, #3 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 7 10 SBd 11.5 15.2 04/21/14 04/22/14 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #1, #2, #4, #3 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 32 10 SBd 11.5 15.2 04/22/14 04/23/14 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #1, #2, #4, #3 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 8 10 SBd 11.5 15.2 04/22/14 04/23/14 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #2, #3, #4, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 33 10 SBd 11.5 15.2 04/23/14 04/24/14 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #1, #4, #2, #3 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 9 10 SBd 11.5 15.2 04/23/14 04/24/14 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #1, #4, #2 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 34 10 SBd 11.5 15.2 04/24/14 04/25/14 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #1, #3, #2 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 10 10 SBd 11.5 15.2 04/24/14 04/25/14 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #1, #2, #4 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 5 10 SBd 11.5 15.2 04/25/14 04/26/14 11:01 PM 6:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #3, #1, #2 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 2 10 SBd 11.5 15.2 04/26/14 04/26/14 12:01 AM 7:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #2, #1, #4 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10SA 5 10 SBd 13.2 15.4 04/21/14 04/22/14 10:01 PM 4:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #3, #4 of 4 lanes
Reason: K-rail Removal
 
C10HG 23 10 SBd 13.2 13.2 04/21/14 04/22/14 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 27 10 SBd 13.2 13.2 04/21/14 04/22/14 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 11 10 SBd 13.2 13.2 04/21/14 04/22/14 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 15 10 SBd 13.2 13.2 04/21/14 04/22/14 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 6 10 SBd 13.2 15.4 04/22/14 04/23/14 10:01 PM 4:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #3, #4 of 4 lanes
Reason: K-rail Removal
 
C10HG 24 10 SBd 13.2 13.2 04/22/14 04/23/14 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 28 10 SBd 13.2 13.2 04/22/14 04/23/14 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 12 10 SBd 13.2 13.2 04/22/14 04/23/14 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 16 10 SBd 13.2 13.2 04/22/14 04/23/14 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 7 10 SBd 13.2 15.4 04/23/14 04/24/14 10:01 PM 4:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #4, #3 of 4 lanes
Reason: K-rail Removal
 
C10HG 25 10 SBd 13.2 13.2 04/23/14 04/24/14 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 29 10 SBd 13.2 13.2 04/23/14 04/24/14 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 13 10 SBd 13.2 13.2 04/23/14 04/24/14 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 17 10 SBd 13.2 13.2 04/23/14 04/24/14 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 8 10 SBd 13.2 15.4 04/24/14 04/25/14 10:01 PM 4:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #4, #3 of 4 lanes
Reason: K-rail Removal
 
C10HG 26 10 SBd 13.2 13.2 04/24/14 04/25/14 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 30 10 SBd 13.2 13.2 04/24/14 04/25/14 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 14 10 SBd 13.2 13.2 04/24/14 04/25/14 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 18 10 SBd 13.2 13.2 04/24/14 04/25/14 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 1 10 SBd 13.2 15.4 04/25/14 04/26/14 11:01 PM 5:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #4, #3 of 4 lanes
Reason: Pavement Work
 
C10HG 6 10 SBd 13.2 13.2 04/25/14 04/26/14 11:01 PM 6:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 7 10 SBd 13.2 13.2 04/25/14 04/26/14 11:01 PM 6:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 3 10 SBd 13.2 13.2 04/26/14 04/26/14 12:01 AM 7:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 4 10 SBd 13.2 13.2 04/26/14 04/26/14 12:01 AM 7:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 2 10 SBd 13.2 15.4 04/26/14 04/27/14 11:01 PM 5:59 AM EB Begin:  Cherry Ave
End:  Cypress Ave
Restriction: #4, #3 of 4 lanes
Reason: Pavement Work
 
C10SA 24 10 SBd 15.2 15.2 04/21/14 04/22/14 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 28 10 SBd 15.2 15.2 04/21/14 04/22/14 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 20 10 SBd 15.2 15.2 04/21/14 04/22/14 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 32 10 SBd 15.2 15.2 04/21/14 04/22/14 11:01 PM 5:59 AM WB Begin: EB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 25 10 SBd 15.2 15.2 04/22/14 04/23/14 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 29 10 SBd 15.2 15.2 04/22/14 04/23/14 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 21 10 SBd 15.2 15.2 04/22/14 04/23/14 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 33 10 SBd 15.2 15.2 04/22/14 04/23/14 11:01 PM 5:59 AM WB Begin: EB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 26 10 SBd 15.2 15.2 04/23/14 04/24/14 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 30 10 SBd 15.2 15.2 04/23/14 04/24/14 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 22 10 SBd 15.2 15.2 04/23/14 04/24/14 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 34 10 SBd 15.2 15.2 04/23/14 04/24/14 11:01 PM 5:59 AM WB Begin: EB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 27 10 SBd 15.2 15.2 04/24/14 04/25/14 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 31 10 SBd 15.2 15.2 04/24/14 04/25/14 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 23 10 SBd 15.2 15.2 04/24/14 04/25/14 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Electrical Work
 
C10SA 35 10 SBd 15.2 15.2 04/24/14 04/25/14 11:01 PM 5:59 AM WB Begin: EB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Electrical Work
 
C10SA 15 10 SBd 15.4 13.2 04/21/14 04/21/14 12:01 AM 6:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C10SA 9 10 SBd 15.4 13.2 04/21/14 04/22/14 10:01 PM 4:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: K-rail Removal
 
C10SA 16 10 SBd 15.4 13.2 04/22/14 04/22/14 12:01 AM 6:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C10SA 10 10 SBd 15.4 13.2 04/22/14 04/23/14 10:01 PM 4:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: K-rail Removal
 
C10SA 17 10 SBd 15.4 13.2 04/23/14 04/23/14 12:01 AM 6:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Pavement Work
 
C10SA 11 10 SBd 15.4 13.2 04/23/14 04/24/14 10:01 PM 4:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: K-rail Removal
 
C10SA 18 10 SBd 15.4 13.2 04/24/14 04/24/14 12:01 AM 6:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Pavement Work
 
C10SA 12 10 SBd 15.4 13.2 04/24/14 04/25/14 10:01 PM 4:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: K-rail Removal
 
C10SA 19 10 SBd 15.4 13.2 04/25/14 04/27/14 12:01 AM 6:59 AM WB Begin:  Cypress Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Pavement Work
 
C10KG 27 10 SBd 23.2 23.2 04/21/14 04/25/14 10:01 PM 5:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10KG 11 10 SBd 23.2 23.2 04/25/14 04/27/14 11:01 PM 7:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10KG 22 10 SBd 23.6 23.6 04/21/14 04/25/14 10:01 PM 6:01 AM WB Begin: WB Sunwest Ln
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10KG 9 10 SBd 23.6 23.6 04/25/14 04/27/14 11:01 PM 7:01 AM WB Begin: WB Sunwest Ln
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10KG 17 10 SBd 24.2 24.2 04/21/14 04/22/14 9:01 PM 5:01 AM WB Begin: WB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 12 10 SBd 24.2 24.2 04/21/14 04/22/14 10:01 PM 6:01 AM EB Begin: EB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 18 10 SBd 24.2 24.2 04/22/14 04/23/14 9:01 PM 5:01 AM WB Begin: WB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 13 10 SBd 24.2 24.2 04/22/14 04/23/14 10:01 PM 6:01 AM EB Begin: EB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 19 10 SBd 24.2 24.2 04/23/14 04/24/14 9:01 PM 5:01 AM WB Begin: WB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 14 10 SBd 24.2 24.2 04/23/14 04/24/14 10:01 PM 6:01 AM EB Begin: EB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 20 10 SBd 24.2 24.2 04/24/14 04/25/14 9:01 PM 5:01 AM WB Begin: WB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 15 10 SBd 24.2 24.2 04/24/14 04/25/14 10:01 PM 6:01 AM EB Begin: EB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 5 10 SBd 24.2 24.2 04/25/14 04/27/14 11:01 PM 7:01 AM EB Begin: EB Route 10
End: NB/SB Route 215
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C10KG 2 10 SBd 24.8 23.6 04/21/14 04/22/14 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1, #3, #2 of 4 lanes
Reason: Highway Construction
 
C10KG 7 10 SBd 24.8 23.6 04/21/14 04/22/14 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #2, #3, #4 of 4 lanes
Reason: Highway Construction
 
C10KG 3 10 SBd 24.8 23.6 04/22/14 04/23/14 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4, #2, #3 of 4 lanes
Reason: Highway Construction
 
C10KG 8 10 SBd 24.8 23.6 04/22/14 04/23/14 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #3, #2, #1, #4 of 4 lanes
Reason: Highway Construction
 
C10KG 4 10 SBd 24.8 23.6 04/23/14 04/24/14 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1, #2, #3 of 4 lanes
Reason: Highway Construction
 
C10KG 9 10 SBd 24.8 23.6 04/23/14 04/24/14 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #3, #1, #2, #4 of 4 lanes
Reason: Highway Construction
 
C10KG 5 10 SBd 24.8 23.6 04/24/14 04/25/14 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1, #2, #3 of 4 lanes
Reason: Highway Construction
 
C10KG 10 10 SBd 24.8 23.6 04/24/14 04/25/14 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #2, #1, #3 of 4 lanes
Reason: Highway Construction
 
C10KG 1 10 SBd 24.8 23.6 04/25/14 04/26/14 10:01 PM 7:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #3, #2, #1, #4 of 4 lanes
Reason: Highway Construction
 
C10KG 2 10 SBd 24.8 23.6 04/26/14 04/27/14 11:01 PM 7:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1, #2, #3 of 4 lanes
Reason: Highway Construction
 
C15LD 58 15 SBd 13.1 16.4 04/21/14 04/21/14 5:01 AM 2:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #3, #1, #2 of 5 lanes
Reason: Roadway Excavation
 
C15LD 42 15 SBd 13.1 16.4 04/21/14 04/22/14 7:01 PM 2:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #2, #4, #3, #1 of 5 lanes
Reason: Roadway Excavation
 
C15LD 38 15 SBd 13.1 16.4 04/21/14 04/22/14 8:01 PM 12:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1 of 2 lanes
Reason: Roadway Excavation
 
C15LD 46 15 SBd 13.1 16.4 04/21/14 04/22/14 8:01 PM 7:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #2, #1, #3 of 4 lanes
Reason: Median Barrier Work
 
C15LD 43 15 SBd 13.1 16.4 04/22/14 04/23/14 7:01 PM 2:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #2, #3, #1, #4 of 5 lanes
Reason: Roadway Excavation
 
C15LD 39 15 SBd 13.1 16.4 04/22/14 04/23/14 8:01 PM 12:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1 of 2 lanes
Reason: Roadway Excavation
 
C15LD 47 15 SBd 13.1 16.4 04/22/14 04/23/14 8:01 PM 7:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #2, #1, #3 of 4 lanes
Reason: Median Barrier Work
 
C15LD 44 15 SBd 13.1 16.4 04/23/14 04/24/14 7:01 PM 2:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1, #2, #4, #3 of 5 lanes
Reason: Roadway Excavation
 
C15LD 40 15 SBd 13.1 16.4 04/23/14 04/24/14 8:01 PM 12:01 PM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1 of 2 lanes
Reason: Roadway Excavation
 
C15LD 48 15 SBd 13.1 16.4 04/23/14 04/24/14 8:01 PM 7:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #2, #1, #3 of 4 lanes
Reason: Median Barrier Work
 
C15LD 45 15 SBd 13.1 16.4 04/24/14 04/25/14 7:01 PM 10:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1, #4, #2, #3 of 5 lanes
Reason: Roadway Excavation
 
C15LD 41 15 SBd 13.1 16.4 04/24/14 04/25/14 8:01 PM 10:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1 of 2 lanes
Reason: Roadway Excavation
 
C15LD 49 15 SBd 13.1 16.4 04/24/14 04/25/14 8:01 PM 6:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1, #3, #2 of 4 lanes
Reason: Median Barrier Work
 
C15LD 13 15 SBd 13.1 16.4 04/25/14 04/26/14 11:59 PM 10:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1 of 2 lanes
Reason: Roadway Excavation
 
C15LD 14 15 SBd 13.1 16.4 04/25/14 04/26/14 11:59 PM 11:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #4, #3, #1, #2 of 5 lanes
Reason: Roadway Excavation
 
C15LD 15 15 SBd 13.1 16.4 04/25/14 04/26/14 11:59 PM 9:01 AM NB Begin:  Lytle Creek
End:  Route 15 (Devore)
Restriction: #1, #3, #2 of 4 lanes
Reason: Median Barrier Work
 
C15LD 22 15 SBd 15 15 04/21/14 04/22/14 7:01 PM 4:01 AM SB Begin: SB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 26 15 SBd 15 15 04/21/14 04/22/14 7:01 PM 4:01 AM SB Begin:  Kenwood Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 50 15 SBd 15 15 04/21/14 04/22/14 7:01 PM 6:01 AM NB Begin: NB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 54 15 SBd 15 15 04/21/14 04/22/14 7:01 PM 6:01 AM NB Begin:  Kenwood Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 23 15 SBd 15 15 04/22/14 04/23/14 7:01 PM 4:01 AM SB Begin: SB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 27 15 SBd 15 15 04/22/14 04/23/14 7:01 PM 4:01 AM SB Begin:  Kenwood Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 51 15 SBd 15 15 04/22/14 04/23/14 7:01 PM 6:01 AM NB Begin: NB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 55 15 SBd 15 15 04/22/14 04/23/14 7:01 PM 6:01 AM NB Begin:  Kenwood Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 24 15 SBd 15 15 04/23/14 04/24/14 7:01 PM 4:01 AM SB Begin: SB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 28 15 SBd 15 15 04/23/14 04/24/14 7:01 PM 4:01 AM SB Begin:  Kenwood Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 52 15 SBd 15 15 04/23/14 04/24/14 7:01 PM 6:01 AM NB Begin: NB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 56 15 SBd 15 15 04/23/14 04/24/14 7:01 PM 6:01 AM NB Begin:  Kenwood Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
P15HA 1 15 SBd 15 17.5 04/24/14 04/24/14 1:01 AM 5:01 AM NB/SB Begin:  Kenwood Ave
End:  Oakie Flats Rd
Restriction: Intermittent full highway closure
Reason: Miscellaneous Work
 
C15LD 25 15 SBd 15 15 04/24/14 04/25/14 7:01 PM 4:01 AM SB Begin: SB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 29 15 SBd 15 15 04/24/14 04/25/14 7:01 PM 4:01 AM SB Begin:  Kenwood Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 53 15 SBd 15 15 04/24/14 04/25/14 7:01 PM 6:01 AM NB Begin: NB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 57 15 SBd 15 15 04/24/14 04/25/14 7:01 PM 6:01 AM NB Begin:  Kenwood Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 9 15 SBd 15 15 04/25/14 04/26/14 10:01 PM 7:01 AM SB Begin: SB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 10 15 SBd 15 15 04/25/14 04/26/14 10:01 PM 7:01 AM SB Begin:  Kenwood Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LD 16 15 SBd 15 15 04/25/14 04/26/14 10:01 PM 8:01 AM NB Begin: NB Route 15
End:  Kenwood Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C15LD 17 15 SBd 15 15 04/25/14 04/26/14 10:01 PM 8:01 AM NB Begin:  Kenwood Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C15LE 25 15 SBd 15.7 17.5 04/21/14 04/25/14 10:01 PM 4:59 AM NB Begin:  Glenn Helen Pkwy
End:  Oakie Flats Rd
Restriction: #3, #4, #5 of 5 lanes
Reason: Shoulder Work
 
C15LE 1 15 SBd 15.7 17.5 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin:  Glenn Helen Pkwy
End:  Oakie Flats Rd
Restriction: #4, #3, #5 of 5 lanes
Reason: Shoulder Work
 
C15LD 34 15 SBd 16.4 16.4 04/21/14 04/26/14 9:01 PM 5:01 AM SB Begin: SB Route 15
End: SB Route 215
Restriction: Full connector ramp closure
Reason: Bridge Work
 
C15LD 59 15 SBd 16.4 13.1 04/21/14 04/21/14 3:01 AM 1:01 PM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 18 15 SBd 16.4 13.1 04/21/14 04/22/14 5:01 PM 4:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #4, #2, #3, #1 of 5 lanes
Reason: Roadway Excavation
 
C15LD 30 15 SBd 16.4 13.1 04/21/14 04/22/14 6:01 PM 3:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 60 15 SBd 16.4 13.1 04/22/14 04/22/14 3:01 AM 1:01 PM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 19 15 SBd 16.4 13.1 04/22/14 04/23/14 5:01 PM 4:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #3, #1, #4, #2 of 5 lanes
Reason: Roadway Excavation
 
C15LD 31 15 SBd 16.4 13.1 04/22/14 04/23/14 6:01 PM 3:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 61 15 SBd 16.4 13.1 04/23/14 04/23/14 3:01 AM 1:01 PM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 20 15 SBd 16.4 13.1 04/23/14 04/24/14 5:01 PM 4:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #4, #3, #2, #1 of 5 lanes
Reason: Roadway Excavation
 
C15LD 32 15 SBd 16.4 13.1 04/23/14 04/24/14 6:01 PM 3:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 62 15 SBd 16.4 13.1 04/24/14 04/24/14 3:01 AM 1:01 PM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 21 15 SBd 16.4 13.1 04/24/14 04/25/14 5:01 PM 4:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #2, #4, #3, #1 of 5 lanes
Reason: Roadway Excavation
 
C15LD 33 15 SBd 16.4 13.1 04/24/14 04/25/14 6:01 PM 3:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 63 15 SBd 16.4 13.1 04/25/14 04/25/14 3:01 AM 1:01 PM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LD 1 15 SBd 16.4 13.1 04/25/14 04/26/14 6:01 PM 7:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1, #4, #3, #2 of 5 lanes
Reason: Roadway Excavation
 
C15LD 11 15 SBd 16.4 13.1 04/25/14 04/26/14 7:01 PM 11:01 AM SB Begin:  Route 15 (Devore)
End:  Lytle Creek
Restriction: #1 of 2 lanes
Reason: Bridge Work
 
C15LE 4 15 SBd 17.5 21.4 04/21/14 04/22/14 9:01 PM 5:01 AM NB Begin:  Oakie Flats Rd
End:  Route 138
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C15LE 30 15 SBd 17.5 31.1 04/21/14 04/22/14 10:01 PM 5:59 AM NB Begin:  Oakie Flats Rd
End:  W Hesperia Oh
Restriction: #4, #3, #5 of 5 lanes
Reason: Shoulder Work
 
C15LE 5 15 SBd 17.5 21.4 04/22/14 04/23/14 9:01 PM 5:01 AM NB Begin:  Oakie Flats Rd
End:  Route 138
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C15LE 31 15 SBd 17.5 31.1 04/22/14 04/23/14 10:01 PM 5:59 AM NB Begin:  Oakie Flats Rd
End:  W Hesperia Oh
Restriction: #4, #3, #5 of 5 lanes
Reason: Shoulder Work
 
C15LE 6 15 SBd 17.5 21.4 04/23/14 04/24/14 9:01 PM 5:01 AM NB Begin:  Oakie Flats Rd
End:  Route 138
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C15LE 32 15 SBd 17.5 31.1 04/23/14 04/24/14 10:01 PM 5:59 AM NB Begin:  Oakie Flats Rd
End:  W Hesperia Oh
Restriction: #3, #4, #5 of 5 lanes
Reason: Shoulder Work
 
C15LE 7 15 SBd 17.5 21.4 04/24/14 04/25/14 9:01 PM 5:01 AM NB Begin:  Oakie Flats Rd
End:  Route 138
Restriction: #3, #4 of 4 lanes
Reason: Pavement Work
 
C15LE 33 15 SBd 17.5 31.1 04/24/14 04/25/14 10:01 PM 5:59 AM NB Begin:  Oakie Flats Rd
End:  W Hesperia Oh
Restriction: #4, #5, #3 of 5 lanes
Reason: Shoulder Work
 
C15LE 2 15 SBd 17.5 31.1 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin:  Oakie Flats Rd
End:  W Hesperia Oh
Restriction: #3, #5, #4 of 5 lanes
Reason: Shoulder Work
 
C15LE 89 15 SBd 20 20 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: NB Cleghorn Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 93 15 SBd 20 20 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 48 15 SBd 20 20 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End:  Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 53 15 SBd 20 20 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Cleghorn Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 90 15 SBd 20 20 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: NB Cleghorn Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 94 15 SBd 20 20 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 49 15 SBd 20 20 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End:  Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 54 15 SBd 20 20 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Cleghorn Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 91 15 SBd 20 20 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: NB Cleghorn Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 95 15 SBd 20 20 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 50 15 SBd 20 20 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End:  Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 55 15 SBd 20 20 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Cleghorn Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 92 15 SBd 20 20 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: NB Cleghorn Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 96 15 SBd 20 20 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 51 15 SBd 20 20 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End:  Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 56 15 SBd 20 20 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Cleghorn Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 15 15 SBd 20 20 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: NB Cleghorn Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 16 15 SBd 20 20 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: SB Route 15
End: SB Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 6 15 SBd 20 20 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Route 15
End:  Cleghorn Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 7 15 SBd 20 20 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Cleghorn Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 85 15 SBd 20.7 20.7 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: NB Weighting Station
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 97 15 SBd 20.7 20.7 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 58 15 SBd 20.7 20.7 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Weighting Station
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 63 15 SBd 20.7 20.7 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 86 15 SBd 20.7 20.7 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: NB Weighting Station
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 98 15 SBd 20.7 20.7 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 59 15 SBd 20.7 20.7 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Weighting Station
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 64 15 SBd 20.7 20.7 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 87 15 SBd 20.7 20.7 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: NB Weighting Station
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 99 15 SBd 20.7 20.7 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 60 15 SBd 20.7 20.7 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Weighting Station
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 65 15 SBd 20.7 20.7 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 88 15 SBd 20.7 20.7 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: NB Weighting Station
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 100 15 SBd 20.7 20.7 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 61 15 SBd 20.7 20.7 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Weighting Station
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 66 15 SBd 20.7 20.7 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 14 15 SBd 20.7 20.7 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: NB Weighting Station
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 17 15 SBd 20.7 20.7 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: SB Route 15
End: SB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 8 15 SBd 20.7 20.7 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Weighting Station
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 9 15 SBd 20.7 20.7 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Route 15
End: NB Weighting Station
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 43 15 SBd 21.4 21.4 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: EB/WB Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 39 15 SBd 21.4 21.4 04/21/14 04/22/14 9:01 PM 4:59 AM NB Begin: NB Route 15
End:  Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 44 15 SBd 21.4 21.4 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: EB/WB Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 40 15 SBd 21.4 21.4 04/22/14 04/23/14 9:01 PM 4:59 AM NB Begin: NB Route 15
End:  Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 45 15 SBd 21.4 21.4 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: EB/WB Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 41 15 SBd 21.4 21.4 04/23/14 04/24/14 9:01 PM 4:59 AM NB Begin: NB Route 15
End:  Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 46 15 SBd 21.4 21.4 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: EB/WB Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 42 15 SBd 21.4 21.4 04/24/14 04/25/14 9:01 PM 4:59 AM NB Begin: NB Route 15
End:  Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 5 15 SBd 21.4 21.4 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: SB Route 15
End: EB/WB Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 4 15 SBd 21.4 21.4 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Route 15
End:  Route 138
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 81 15 SBd 25.9 25.9 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: NB Truck Safety Check Area
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 101 15 SBd 25.9 25.9 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Truck Safety Check Area
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 82 15 SBd 25.9 25.9 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: NB Truck Safety Check Area
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 102 15 SBd 25.9 25.9 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Truck Safety Check Area
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 83 15 SBd 25.9 25.9 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: NB Truck Safety Check Area
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 103 15 SBd 25.9 25.9 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Truck Safety Check Area
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 84 15 SBd 25.9 25.9 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: NB Truck Safety Check Area
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 104 15 SBd 25.9 25.9 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Truck Safety Check Area
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 13 15 SBd 25.9 25.9 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: NB Truck Safety Check Area
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 18 15 SBd 25.9 25.9 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: SB Route 15
End: SB Truck Safety Check Area
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 77 15 SBd 28.6 28.6 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: NB Oak Hill Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 105 15 SBd 28.6 28.6 04/21/14 04/22/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 68 15 SBd 28.6 28.6 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 73 15 SBd 28.6 28.6 04/21/14 04/22/14 9:01 PM 5:59 AM NB Begin: NB Oak Hill Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 78 15 SBd 28.6 28.6 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: NB Oak Hill Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 106 15 SBd 28.6 28.6 04/22/14 04/23/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 69 15 SBd 28.6 28.6 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 74 15 SBd 28.6 28.6 04/22/14 04/23/14 9:01 PM 5:59 AM NB Begin: NB Oak Hill Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 79 15 SBd 28.6 28.6 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: NB Oak Hill Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 107 15 SBd 28.6 28.6 04/23/14 04/24/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 70 15 SBd 28.6 28.6 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 75 15 SBd 28.6 28.6 04/23/14 04/24/14 9:01 PM 5:59 AM NB Begin: NB Oak Hill Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 80 15 SBd 28.6 28.6 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: NB Oak Hill Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 108 15 SBd 28.6 28.6 04/24/14 04/25/14 8:01 PM 3:59 AM SB Begin: SB Route 15
End: SB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 71 15 SBd 28.6 28.6 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Route 15
End: NB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 76 15 SBd 28.6 28.6 04/24/14 04/25/14 9:01 PM 5:59 AM NB Begin: NB Oak Hill Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 12 15 SBd 28.6 28.6 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: NB Oak Hill Rd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 19 15 SBd 28.6 28.6 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin: SB Route 15
End: SB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 10 15 SBd 28.6 28.6 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Route 15
End: NB Oak Hill Rd
Restriction: Full off ramp closure
Reason: Shoulder Work
 
C15LE 11 15 SBd 28.6 28.6 04/26/14 04/26/14 12:01 AM 6:59 AM NB Begin: NB Oak Hill Rd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Shoulder Work
 
C15LE 34 15 SBd 31.1 15.7 04/21/14 04/25/14 8:01 PM 3:59 AM SB Begin:  W Hesperia Oh
End:  Glenn Helen Pkwy
Restriction: #4, #3 of 4 lanes
Reason: Shoulder Work
 
C15LE 3 15 SBd 31.1 15.7 04/25/14 04/26/14 10:01 PM 5:59 AM SB Begin:  W Hesperia Oh
End:  Glenn Helen Pkwy
Restriction: #4, #3 of 4 lanes
Reason: Shoulder Work
 
M15JA 2 15 SBd 31.8 31.8 04/23/14 04/29/14 9:01 AM 1:01 PM NB Begin: NB Route 15
End: NB Route 395
Restriction: Full connector ramp closure
Reason: Bridge Work
 
M15AA 2 15 SBd 37.6 37.6 04/23/14 04/23/14 9:01 AM 1:01 PM SB Begin: WB Bear Valley Rd
End: SB Route 15
Restriction: Intermittent full on ramp closure
Reason: Guardrail Repair
 
M15AA 1 15 SBd 37.7 37.6 04/23/14 04/23/14 9:01 AM 1:01 PM SB Begin:  Nisqualli Rd
End:  Bear Valley Rd
Restriction: Intermittent #3 of 3 lanes
Reason: Guardrail Repair
 
C18KA 6 18 SBd 16 17 04/21/14 04/21/14 8:01 AM 6:01 PM NB Begin:  Post Mile 16.0
End:  Post Mile 17.0
Restriction: #2 of 2 lanes
Reason: AC Paving
 
C18KA 7 18 SBd 16 17 04/22/14 04/24/14 8:01 AM 6:01 PM NB Begin:  16.0 Just South of Bonnie Canyon
End:  17.0 Just North of Bonnie Canyon
Restriction: #2 of 2 lanes, right shoulder
Reason: AC Paving
 
C18KA 10 18 SBd 16 17 04/25/14 04/25/14 8:01 AM 4:01 PM NB Begin:  16.0 Just South of Bonnie Canyon
End:  17.0 Just North of Bonnie Canyon
Restriction: #2 of 2 lanes, right shoulder
Reason: AC Paving
 
C18KA 1 18 SBd 17 16 04/21/14 04/21/14 8:01 AM 6:01 PM SB Begin:  Post Mile 17.0
End:  Post Mile 16.0
Restriction: #2 of 2 lanes
Reason: AC Paving
 
C18KA 2 18 SBd 17 16 04/22/14 04/24/14 8:01 AM 6:01 PM SB Begin:  17.0 Just North of Bonnie Canyon
End:  16.0 Just South of Bonnie Canyon
Restriction: #2 of 2 lanes, right shoulder
Reason: AC Paving
 
C18KA 5 18 SBd 17 16 04/25/14 04/25/14 8:01 AM 4:01 PM SB Begin:  17.0 Just North of Bonnie Canyon
End:  16.0 Just South of Bonnie Canyon
Restriction: #2 of 2 lanes, right shoulder
Reason: AC Paving
 
M18DA 2 18 SBd 31.7 34.5 04/22/14 04/25/14 7:01 AM 3:01 PM NB/SB Begin:  Route 330
End:  Green Valley Lake Rd
Restriction: One-way traffic control
Reason: Crack Seal Operation
 
P18AA 2 18 SBd 99.5 99.9 01/03/14 04/22/14 7:01 AM 11:01 PM WB Begin:  Cobalt Rd
End:  Emerald Rd
Restriction: Long-term #2 of 2 lanes
Reason: Shoulder Work
 
C38HA 1 38 SBd 5.1 5.5 04/21/14 04/24/14 7:01 AM 5:01 PM EB/WB Begin:  Amethyst St
End:  Mt View Ln
Restriction: One-way traffic control
Reason: Pavement Work
 
C38HA 5 38 SBd 5.1 5.5 04/25/14 04/25/14 7:01 AM 4:01 PM EB/WB Begin:  Amethyst St
End:  Mt View Ln
Restriction: One-way traffic control
Reason: Pavement Work
 
M38BA 3 38 SBd 12.2 11.3 04/24/14 04/25/14 8:30 AM 1:01 PM EB/WB Begin:  Old Mill Creek Rd
End:  Thurman Flats
Restriction: One-way traffic control
Reason: Crack Seal Operation
 
M38BA 1 38 SBd 15 12.2 04/22/14 04/23/14 8:30 AM 1:01 PM EB/WB Begin:  Valley Of The Falls Dr
End:  Old Mill Creek Rd
Restriction: One-way traffic control
Reason: Crack Seal Operation
 
C40HB 1 40 SBd 2.3 28.3 04/21/14 04/21/14 4:01 AM 7:01 PM EB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #2, #1 of 2 lanes
Reason: Pavement Work
 
C40HB 5 40 SBd 2.3 28.3 04/21/14 04/21/14 5:01 AM 7:01 PM WB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #1, #2 of 2 lanes
Reason: Pavement Work
 
C40HB 2 40 SBd 2.3 28.3 04/22/14 04/22/14 4:01 AM 7:01 PM EB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #2, #1 of 2 lanes
Reason: Pavement Work
 
C40HB 6 40 SBd 2.3 28.3 04/22/14 04/22/14 5:01 AM 7:01 PM WB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #2, #1 of 2 lanes
Reason: Pavement Work
 
C40HB 3 40 SBd 2.3 28.3 04/23/14 04/23/14 4:01 AM 7:01 PM EB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #1, #2 of 2 lanes
Reason: Pavement Work
 
C40HB 7 40 SBd 2.3 28.3 04/23/14 04/23/14 5:01 AM 7:01 PM WB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #1, #2 of 2 lanes
Reason: Pavement Work
 
C40HB 4 40 SBd 2.3 28.3 04/24/14 04/24/14 4:01 AM 7:01 PM EB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #2, #1 of 2 lanes
Reason: Pavement Work
 
C40HB 8 40 SBd 2.3 28.3 04/24/14 04/25/14 5:01 AM 7:01 PM WB Begin:  Main St
End:  Desert Oasis Roadside Rest Area
Restriction: #1, #2 of 2 lanes
Reason: Pavement Work
 
M40EA 4 40 SBd 78.2 78.2 04/23/14 04/24/14 8:01 AM 2:01 PM EB Begin:  Kelbaker Rd
End:  Kelbaker Rd
Restriction: #2 of 2 lanes
Reason: Drainage Work
 
M40EA 1 40 SBd 86 87 04/22/14 04/24/14 8:01 AM 2:01 PM EB Begin:  E40 starting at postmile 86
End:  E40 ending at postmile 87
Restriction: #2 of 2 lanes
Reason: Crack Seal Operation
 
C40IB 15 40 SBd 120 139 04/21/14 04/28/14 12:01 AM 11:59 PM WB Begin:  Water Rd
End:  Park Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 25 40 SBd 120 120 04/28/14 04/28/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Water Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 41 40 SBd 120 120 04/28/14 04/28/14 6:01 AM 2:01 PM WB Begin: WB Water Rd
End: WB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 16 40 SBd 120 139 04/29/14 04/29/14 12:01 AM 11:59 PM WB Begin:  Water Rd
End:  Park Rd
Restriction: #2, #1 of 2 lanes, right shoulder, left shoulder
Reason: Highway Construction
 
C40IB 26 40 SBd 120 120 04/29/14 04/29/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Water Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 42 40 SBd 120 120 04/29/14 04/29/14 6:01 AM 2:01 PM WB Begin: WB Water Rd
End: WB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 17 40 SBd 120 139 04/30/14 04/30/14 12:01 AM 11:59 PM WB Begin:  Water Rd
End:  Park Rd
Restriction: #2, #1 of 2 lanes, right shoulder, left shoulder
Reason: Highway Construction
 
C40IB 27 40 SBd 120 120 04/30/14 04/30/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Water Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 43 40 SBd 120 120 04/30/14 04/30/14 6:01 AM 2:01 PM WB Begin: WB Water Rd
End: WB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 18 40 SBd 120 139 05/01/14 05/01/14 12:01 AM 11:59 PM WB Begin:  Water Rd
End:  Park Rd
Restriction: #2, #1 of 2 lanes, right shoulder, left shoulder
Reason: Highway Construction
 
C40IB 28 40 SBd 120 120 05/01/14 05/01/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Water Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 44 40 SBd 120 120 05/01/14 05/01/14 6:01 AM 2:01 PM WB Begin: WB Water Rd
End: WB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 19 40 SBd 120 139 05/02/14 05/03/14 12:01 AM 11:59 PM WB Begin:  Water Rd
End:  Park Rd
Restriction: #2, #1 of 2 lanes, right shoulder, left shoulder
Reason: Highway Construction
 
C40IB 7 40 SBd 120 120 05/05/14 05/05/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Water Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 19 40 SBd 120 120 05/05/14 05/05/14 6:01 AM 2:01 PM WB Begin: WB Water Rd
End: WB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 29 40 SBd 132.7 132.7 04/28/14 04/28/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Route 95
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 49 40 SBd 132.7 132.7 04/28/14 04/28/14 6:01 AM 2:01 PM EB Begin: EB Route 95
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 57 40 SBd 132.7 132.7 04/28/14 04/28/14 6:01 AM 2:01 PM WB Begin: WB Route 95
End: WB Route 40
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C40IB 30 40 SBd 132.7 132.7 04/29/14 04/29/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Route 95
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 50 40 SBd 132.7 132.7 04/29/14 04/29/14 6:01 AM 2:01 PM EB Begin: EB Route 95
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 58 40 SBd 132.7 132.7 04/29/14 04/29/14 6:01 AM 2:01 PM WB Begin: WB Route 95
End: WB Route 40
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C40IB 31 40 SBd 132.7 132.7 04/30/14 04/30/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Route 95
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 51 40 SBd 132.7 132.7 04/30/14 04/30/14 6:01 AM 2:01 PM EB Begin: EB Route 95
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 59 40 SBd 132.7 132.7 04/30/14 04/30/14 6:01 AM 2:01 PM WB Begin: WB Route 95
End: WB Route 40
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C40IB 32 40 SBd 132.7 132.7 05/01/14 05/01/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Route 95
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 52 40 SBd 132.7 132.7 05/01/14 05/01/14 6:01 AM 2:01 PM EB Begin: EB Route 95
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 60 40 SBd 132.7 132.7 05/01/14 05/01/14 6:01 AM 2:01 PM WB Begin: WB Route 95
End: WB Route 40
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C40IB 3 40 SBd 132.7 132.7 05/05/14 05/05/14 6:01 AM 2:01 PM EB Begin: EB Route 40
End: EB Route 95
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40IB 23 40 SBd 132.7 132.7 05/05/14 05/05/14 6:01 AM 2:01 PM EB Begin: EB Route 95
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40IB 31 40 SBd 132.7 132.7 05/05/14 05/05/14 6:01 AM 2:01 PM WB Begin: WB Route 95
End: WB Route 40
Restriction: Full connector ramp closure
Reason: Highway Construction
 
C40GB 19 40 SBd 139 154.6 04/21/14 04/21/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 3 40 SBd 139 120 04/21/14 04/21/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 65 40 SBd 139 139 04/21/14 04/21/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Park Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 81 40 SBd 139 139 04/21/14 04/21/14 6:01 AM 2:01 PM EB Begin: EB Park Rd
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40GB 20 40 SBd 139 154.6 04/22/14 04/22/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 4 40 SBd 139 120 04/22/14 04/22/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 66 40 SBd 139 139 04/22/14 04/22/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Park Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 82 40 SBd 139 139 04/22/14 04/22/14 6:01 AM 2:01 PM EB Begin: EB Park Rd
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40GB 21 40 SBd 139 154.6 04/23/14 04/23/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 5 40 SBd 139 120 04/23/14 04/23/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 67 40 SBd 139 139 04/23/14 04/23/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Park Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 83 40 SBd 139 139 04/23/14 04/23/14 6:01 AM 2:01 PM EB Begin: EB Park Rd
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40GB 22 40 SBd 139 154.6 04/24/14 04/24/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 6 40 SBd 139 120 04/24/14 04/24/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 68 40 SBd 139 139 04/24/14 04/24/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Park Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 84 40 SBd 139 139 04/24/14 04/24/14 6:01 AM 2:01 PM EB Begin: EB Park Rd
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40GB 27 40 SBd 139 154.6 04/25/14 04/26/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #2, #1 of 2 lanes, right shoulder, left shoulder
Reason: Highway Construction
 
C40IB 1 40 SBd 139 120 04/26/14 04/27/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 15 40 SBd 139 154.6 04/28/14 04/28/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 3 40 SBd 139 120 04/28/14 04/28/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 16 40 SBd 139 154.6 04/29/14 04/29/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 4 40 SBd 139 120 04/29/14 04/29/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 17 40 SBd 139 154.6 04/30/14 04/30/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 5 40 SBd 139 120 04/30/14 04/30/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 18 40 SBd 139 154.6 05/01/14 05/01/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40IB 6 40 SBd 139 120 05/01/14 05/01/14 12:01 AM 11:59 PM EB Begin:  Park Rd
End:  Water Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40GB 19 40 SBd 139 154.6 05/02/14 05/03/14 12:01 AM 11:59 PM WB Begin:  Park Rd
End:  Arizona  State Line
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40OB 1 40 SBd 140.8 141 04/21/14 04/21/14 5:01 AM 2:01 PM EB Begin:  Balboa Place
End:  River Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40OB 26 40 SBd 140.8 140.8 04/21/14 04/21/14 5:01 AM 2:01 PM WB Begin: WB Balboa Place
End: WB Route 40
Restriction: Partial on ramp closure (#1 of 1 lane, left shoulder)
Reason: Highway Construction
 
C40GB 61 40 SBd 140.8 140.8 04/21/14 04/21/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Balboa Place
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 85 40 SBd 140.8 140.8 04/21/14 04/21/14 6:01 AM 2:01 PM EB Begin: EB Balboa Place
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40OB 2 40 SBd 140.8 141 04/22/14 04/22/14 5:01 AM 2:01 PM EB Begin:  Balboa Place
End:  River Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40OB 27 40 SBd 140.8 140.8 04/22/14 04/22/14 5:01 AM 2:01 PM WB Begin: WB Balboa Place
End: WB Route 40
Restriction: Partial on ramp closure (#1 of 1 lane, left shoulder)
Reason: Highway Construction
 
C40GB 62 40 SBd 140.8 140.8 04/22/14 04/22/14 6:01 AM 2:01 PM WB Begin: WB Route 40
End: WB Balboa Place
Restriction: Full off ramp closure
Reason: Highway Construction
 
C40GB 86 40 SBd 140.8 140.8 04/22/14 04/22/14 6:01 AM 2:01 PM EB Begin: EB Balboa Place
End: EB Route 40
Restriction: Full on ramp closure
Reason: Highway Construction
 
C40OB 3 40 SBd 140.8 141 04/23/14 04/23/14 5:01 AM 2:01 PM EB Begin:  Balboa Place
End:  River Rd
Restriction: #1, #2 of 2 lanes, left shoulder, right shoulder
Reason: Highway Construction
 
C40OB 28 40 SBd 140.8 140.8 04/23/14 04/23/14 5:01 AM 2:01 PM WB