The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) Can pre-manufactured structural steel components be substituted for the structural steel components indicated if they meet the structural criteria and the load criteria. Benefit to State would be a cost savings over the labor required to install the structural steel as indicated (Field welding, welding inspection, etc..).

A1) Please bid per the current contract documents. No pre-engineered building is called for on contract documents.Reference Section 5-1.14 " Cost Reduction Incentive," of the Standard Specifications. Proposals for modifications to the contract documents may be submitted to the Engineer after contract award. 4May11


Q2)ST1-0, A (steel deck notes) indicates puddle welds to attach the metal deck, all other details on ST1-9 and ST1-12 indicate screws. Which is it? Also if you use puddle welds you will not have a water tight roof.

A2) The metal deck is to be attached per the Metal Deck note on plan sheet ST1-0. 4May11


Q3) There are no details or special provisions indicating the LPG system make up. What does the system comprise of, (tank, vaporizer, sizes, etc..)?

A3) LPG system shown on plan sheet 9 is a LPG dispensing system. Addendum No. 1 dated May6, 2011 has been issued showing the specification required for the dispensing system. As shown on plan sheet 9 the LPG system shall be connect to the existing tank and no new tank will be required. 10May11


Q4) Will Caltrans accept a precast concrete wall manufactured at our plant and delivered to the jobsite or does the wall have to be cast-site, in-place?

A4) Please refer to the Section 12-3.01 "Cast-In-Place Concrete," of the special provisions. And also refer to Section 5-1.14 " Cost Reduction Incentive," of the Standard Specifications. Proposals for modifications to the contract documents may be submitted to the Engineer after contract award. 17May11


Q5) There are no log of test borings or soils analysis provided by Caltrans to determine the suitability of excavation materials for compaction requirements. How do we determine if excavated materials are suitable? How do we determine if barrow materials will be required and approximately how much will be required?

A5) Your attention is directed to section 10-1.01 ORDER OF WORK of the contract special provisions. 16May11