California Department of Transportation
 

Contract 09-315204

The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) The maximum length available for trim is twenty feet. Closures are generally one foot or three feet long. Can we supply samples in maximum standard lengths?

A1) Please bid per the current contract documents. 22Mar10


Q2) Insulated metal panels are not available either 36" or 24" wide. The industry standard is either 40" or 42" coverage inches. Is the standard panel coverage width acceptable?

A2) Bid per the current contract documents. Insulated metal panels in 36" width are readily available. 22Mar10


Q3) What is your specification for the underground water storage tank? or can you reference it to what specification?

A3) The specification for the underground water storage tank is provided in Section 12-2.05 " Fire Protection Water Supply System "of the Special Provisions. 18Mar10


Q4) Under Tracks, Supports, and Accessories-Adjustable Louvers-I donít see anywhere on the plans where they detail the quantity of louvers they want on the sectional door(s). Itís very unusual to have a louver in a sectional door, they maybe confused???? Door schedule says door # 2 is to be insulated with louvers? How Many and What by operative?

A4) The quantity of louver on the section doors is provided on sheet A1-4 of the contract plans as well as door schedule and exterior elevations. The operative of the louvers is provided in Section 12-8.02 of the Special Provisions. 23Mar10