California Department of Transportation
 

Contract 06-0E1004

The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.

Q1) Are the cross sections for this project available at Airport Blueprint yet?

A1) The cross section are available at Airport Blueprint, Inc. located at 4854 N. Blackstone Fresno, CA 93726-0106. The phone number is (559) 225-9055.


Q2) Are the Portable Changeable Message Signs going to be required during the plant establishment work period?

A2) yes, if there are lane closures during the plant establishment work perio.


Q3) There is no Bid Item for Lead Compliance Plan, please issue an addendum correcting this error.

A3) Addendum #1 was issued on Nov. 6, 2008. Please refer to it.


Q4) Bid Item 26 is calling for Drill Hole (Presplitting) yet the cut slope is calling for a .75:1 slope or flatter. typically the presplitting is for slopes that are steeper than .50:1. Please clarify.

A4) Please bid according to contract bid document.


Q5) Any Minority Requirements ? Good Faith Effort Required ?

A5) This project does not have any Minority Requirements or
Good Faith Effort required.


Q6) Will cross-sections be made available for take-off purposes?

A6) The cross section are available at Airport Blueprint, Inc. located at 4854 N. Blackstone Fresno, CA 93726-0106. The phone number is (559) 225-9055.


Q7) Will the cross sections be available soon? It is very important to the blasting subs to have the information to put together a comprehensible quote.

A7) The cross section are available at Airport Blueprint, Inc. located at 4854 N. Blackstone Fresno, CA 93726-0106. The phone number is (559) 225-9055.


Q8) What is the purpose of using RHMA (gap graded) material between the HMA (Type A) and the HMA (Open Graded)?

A8) Please bid according to contract bid document.


Q9) Due to the small quantity of RHMA (gap graded) being used on this project, the end result is going to be costly. Can this material be substituted with a different mix?

A9) Please bid according to contract bid document.


Q10) IS IT THE INTENT OF THE OWNER FOR WELL SURVEYS TO BE PREFORMED BY DISASEMBLING WELL HEADS AND PULLING THE PUMP ASSEMBLY TO TAKE A MEASUREMENT OF TOTAL DEPTH?

A10) Yes, well surveys are to be performed by disassembling the well heads and pulling the pump assembly to take a measurement of the total depth.


Q11) Has this project been cleared by archeologist? Are there any known concerns?

A11) Yes, no concerns for the project.


Q12) What is the weight limit of equipment that can be on the highway?

A12) The maximum weight is 80,000 pounds. Weight exceeding 80,000 pounds will require a permit.


Q13) The highway is freashly slurry sealed. With the blasting, the rock will be on the existing roadway and will be marked and gouged. What will need to be done after the roadway is cleared and prior to opening? How will it be paid for?

A13) Please see standard specs page 153 sec 19-2.03 Blasting.


Q14) The pipe crossing are quite deep and there is a good chance of hitting rock. Is there a possiblity of doing a long weekend closure for each crossing? Are fear is, that you may have to blast to get the pipe in and with the closure period it would not allow enough time to complete the work.

A14) No, one lane must remain open at all time.


Q15) With the depth of the CMP crossing and the short closure, would Caltrans consider using concrete backfill for the entire trench?

A15) Please bid according to contract bid document.


Q16) At the discharge side of drainage system #4 the embankment is washout considerably. Are you wanting this filled and comapcted first? If so how is it paid for? Does Caltrans have access to the bottom of the toe of the slope?

A16) There will be RSP placed at the bottom. Compaction or fill is not believed to be needed. Caltrans does not have access at the bottom of the slope.


Q17) On the drainage systems that cross the highway, the MBGR will need to be removed and replaced. How will this be paid for?

A17) Please bid according to contract bid document.


Q18) Will trench plates be allowed on the highway covering trenches?

A18) Yes.


Q19) Is a CAD drawing available for this project? If so, how can we get it. Also in the inquires, Caltrans has a lot of items under consideration. Is there second addendum coming?

A19) No cad drawing are available. Questions in inquiries will be answered as soon as possible.