The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) In specification section 12-2.1 Removing Portions Of Existing Facilities Part-3 Execution under Disposal states, "Materials that are to be removed, shall become the property of the Contractor and shall be disposed of outside the highway right of way in accordance with the requirements in Section 7-1.13. "Disposal of Material Outside the Highway Right of Way." of the Standard Specifications. a. Please provide the missing Specification Section 7-1.13.

A1) This Project and Contract is supplemented by Standard Specifications 2006. This can be obtained online at the following address: http://www.dot.ca.gov/hq/esc/oe/specifications/std_specs/2006_StdSpecs/2006_StdSpecs.pdf. 10Apr12.


Q2) b. On drawing sheet A1-1 it calls out for the existing two fuel delivery systems to be removed by the Contractor. Who is responsible for the disposal of the existing fuel delivery systems?

A2) Contractor is directed to read 2006 Standard Specifications, Amendments to May 2006 Standard Specifications included in the 05A1535 Bid Package and the Project Plans and Specifications. 10Apr12.


Q3) c. Will the equipment & piping that has come into contact with petroleum products need to be handled as hazardous material?

A3) Contractor is directed to read 2006 Standard Specifications, Amendments to May
2006 Standard Specifications included in the 05A1535 Bid Package and the Project Plans
and Specifications. 10Apr12.


Q4)d. If the Contractor is responsible for the offsite disposal of the fuel system equipment, and piping will the state handle all paper work and fees associated with the disposal of any and all hazardous material?

A4) Contractor is directed to read 2006 Standard Specifications, Amendments to May
2006 Standard Specifications included in the 05A1535 Bid Package and the Project Plans
and Specifications. 10Apr12.