Contract 05-0T2904

The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) Is the DVBE goal of 5% a requirement?

A1) Yes, meeting the DVBE goal is a requirement for award, there is no Good Faith Effort. 24Feb11


Q2) Plan sheet number 6 says that the City of Lompoc and Verizon will pay for the Adjustment of the existing Utilities to grade after paving. However, who pays for the lowering of these utilities prior to cold plane?

A2) The City of Lompoc and Verizon will pay for lowering and adjusting to grade of their utilities. 1Mar11


Q3) What if there are other utilities encountered, who pays for those lowering and adjustments?

A3) All utilities have been identified. 1Mar11


Q4) The Repair Failed Areas table on plan sheet 6 shows the total length of 12 feet wide repairs in each lane. How many individual Repairs are in that length, or is the length just one long continuous repair? If individual repairs, what are the Stations of these?

A4) As shown on plan, the length is just one long continuous repair. 1Mar11


Q5) Do the detector loops have to be installed before the final lift of Hot Mix Asphalt is placed?

A5) Reference Amendments Section 86-5.01A(4) Installation Details, Paragraph # 5. 1Mar11