The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.

Q) Request that you provde a construction detail for the intended "non-pay" connection to bridge rail without sidewalk. Your contract documents are now incomplete. You make no refrence on pg. v to the required Standard Plan(s). Radiused (14.4m)mbgr at Sta 100+00 Los Carneros OH and (16.0 m) Sta 116+48 Glen Annie are not compatible with details shown on Standard Plans A 77 K1 and A 77K 2 that require tangental Transition Railing Type WB. We believe that there is no allowable design, nor is there a vendor who will fabricate and deliver radiused Transition Rail Tye WB components.

A) Bid it as Shown


Q) Clarify if the " Aux. Lane" shown on plan sheet 3 of 21 is considered a "Ramp" on Traffic Chart No. 1 pg. 144 of the Special Provisions.

A) The auxiliary lane referred to on page 3 of 21 would be considered a "Ramp" on Traffic Chart No.1 of the Special Provisions.