The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Q) Please provide widths for the existing columns, as this information is needed for the 60E Rail.
A) The column width at the South Gonzales O.C. and the North Gonzales O.C. is 0.762 M and that at the Fifth Street O.C. is 0838 M
Q) Sheet 27 of 40 Section A-A . This detail shows CTB for the apron. Please clarify, as there is no pay item for CTB.
A) It should be 100 mm of PCC not 150 mm of CTB.
Q) Are cross sections available for this project? Due to the length of the job, and the varying typical sections it would nice to have them in order to accurately figure the job.
A) Yes, cross sections are available for copying from Coastal Reprographics Services, 880 Via Esteban, Suite B, San Luis Obispo, Ca. 93401, phone number (805) 543-5247.
Q) Does CDOT have a supplier or manufacturer contact name, phone number or e-mail address for the rubber Post Collar?
A) Addendum N0.1 removed contract item number 21, Weed Control (Shotcrete) and replaced it with contract item number 47, Minor Concrete (Weed Barrier).
Q) Bid Item #23 S-Compost Erosion Control it does not state the quantity per hectare for this item. please clarify.
A) Bid in accordance with the contract plans and specifications.
Q) Bid Item #22 - Erosion Control Drill Seed. Normally , the seed is included in this item as the pricing. However, it has been broken down so that the seed appears to be separate item , is this correct and / or is the seed to be used for something else as well?
A) Bid in accordance with the contract plans and specifications.