The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) Note on sheet Q-1 states location of slab replacement to be determined by the engineer.Can we get information on the specific location of slab replacement prior to bid date?

A1) Refer to plan sheets revised by Addendum No. 2, dated October 21, 2011.24Oct11.


Q2) Sheet X-1 shows northbound rt shoulder 0.20' cold plane/0.20' HMA (PM 29.0/30.8). Sheet Q-1 shows northbound rt shoulder 0.15' cold plane/0.15' HMA (PM 29.0/30.75)?

A2) Refer to plan sheets revised by Addendum No. 2, dated October 21, 2011. 24Oct11.


Q3) Sheet X-1 shows Route 99/12 Separation Off-Ramps to have 0.25' cold plane and 0.25' HMA. Sheet Q-1 shows S/Bound Off-Ramp to be 0.15' cold plane and 0.15' HMA. Which is correct?

A3) The correct depth is 0.25' as shown on Typical Cross Sections X-1 (Sheet 2 of the plans). 11Oct11.


Q4) Sheet X-1 shows Route 99/12 Separation On-Ramps to have 0.25' cold plane and 0.25' HMA. Sheet Q-1 shows S/Bound On-Ramp Conform Taper to be 0.15' cold plane and 0.15' HMA. Which is correct?

A4) The correct depth is 0.25' as shown on Typical Cross Sections X-1 (Sheet 2 of the plans). 11Oct11.


Q5) Sheet 17, Q-3, MBGR Quantity Chart has a column for 1.95 CY of Minor Concrete, Minor Structure. Are these MBGR/TBB anchor Blocks? Please provide a detail for this concrete.

A5) Refer to Section 2-1.12B "Bid Item List and Bid Comparison" of the amended Standard Specifications, which states, "Submit a bid based on the work item quantities the Department shows in the Bid Item List." 21Oct11.