Top Links
- District 4 Projects
- Upcoming Work
- District 4 Videos
- District 4 Photography
- Environmental Documents
- Records Request
- Claim Form

Caltrans District 4 | Environmental Documents
Alameda | Contra Costa | Marin | Napa | San Francisco | San Mateo | Santa Clara | Solano | Sonoma 
Alameda County
- Caldecott Improvement Projecton State Route 24, Final Environmental Assessment / Environmental Impact Report
- Caldecott Improvement Project Draft EA/EIR
- Draft Mitigated Negative Declaration/Initial Study for the Patterson Slough Bridge Deck Rehabilitation Project 4.3MB
- Final Environmental Impact Statement
- SFOBB Maintenance Complex
Project, replace and reconstruct existing maintenance facilities
located at the San Francisco ¯ Oakland Bay Bridge (SFOBB) toll plaza
area (1.5MB)
Uvas Creek Bridge Environmental Document
- Initial Study With Negative Declaration
Route 13
- Route 13 Vegetation Management Project - Finding of no significant impact
- toc.pdf
- chapter_1_proposed_project.pdf
- chapter_2a_affected_environment_human_environment.pdf
- chapter_2b_affected_environment_physical_environment.pdf
- chapter_2d_affected_environment_cumulative_and_climate_change.pdf
- chapter_2c_affected_environment_biological_environment.pdf
- chapter_3_comments_and_coordination.pdf
- chapter_4_list_of_preparers.pdf
- chapter_5_distribution_list.pdf
- chapter_6_references.pdf
- appendices_cover.pdf
- appendix_b_titleiv_policy_statement.pdf
- appendix_b_titleiv_policy_statement.pdf
- appendix_c_maps_of_project_components.pdf
- appendix_d_bcdc_jurisdiction.pdf
- appendix_e_biological_resources.pdf
- appendix_f_usfws_letter_of_concurrence.pdf
- appendix_g_usfws_species_list.pdf
- appendix_h_ecr.pdf
- list_of_acronyms.pdf
- cover_and_front_end.pdf
- Niles Canyon Project I:
- Initial Study with Negative
- Niles Canyon Project II:
- Draft Environmental Impact Report/ Environmental Assessment
- UPDATE
- Niles Canyon Safety Project Home Page
- Initial Study/Environmental Assessment, State Route 84 (Vallecitos Road), Pigeon Pass in Alameda County 04-ALA-KP 33.3137.0, (PM 20.7123.0), 04- 17 2400, April 2005
- QUALITATIVE PM2.5 HOT SPOT ANALYSIS
- Truck Climbing Lane Chapters 1 - 5
- Truck Climbing Appendices
- Initial Study (12MB)
- Air Quality Particulate Hot Spot Analysis
- Air Quality Public Notice for Draft Report on Fine Particulate Matter
- Initial Study with Proposed Mitigated Negative Declaration/Environmental Assessment
- Cover Sheet
- TOC
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- front_matter
- chapters_1_to_5
- appendix_a
- appendices_b_to_f
- I-580/Castro Valley Interchange Project - Initial Study / Environmental Assessment June, 2006 (9MB)
- Initial Study (25MB)
- cover_page
- Table of Contents
- chapter_1_proposed_project
- chapter_2_affected_environment_pages_31_to_102
- chapter_2_affected_environment_pages_103_to_178
- chapter_2_affected_environment_pages_179_to_268.pdf
- chapter_3_comments_coordination
- chapter_4_preparers
- chapter_5_distribution_list
- appendix_a
- appendix_b
- appendix_c
- appendix_d
- appendix_d
- appendix_e
- appendix_f
- appendix_g
- appendix_h
- appendix_i
- appendix_j
- Project Assessment Form for PM 2.5 Interagency Consultation
- Initial Study (12MB)
- SANTA CLARA COUNTY, CA DISTRICT 4 – SCL – 880 (PM 4.1/8.7) EA 04-298300
- Final
Environmental Impact Statement
Caldecott Tunnel Environmental Document
Caldecott Tunnel
Patterson Slough Bridge Deck
SFOBB Maintenance Complex
I-80 Integrated Corridor
Mobility (ICM) Project
Route 84 Niles Canyon Safety Project
Route 84 Realignment &
widening in Alameda County
I-580 Eastbound Express Lane Project
I-580 Eastbound Truck Climbing Lane Draft. Env. Doc
I-580 Westbound HOV Lane Project
I-580 Eastbound HOV Lane Project
Environmental Assessment/ Initial Study
Environmental Assessment/ Initial Study
I-580/Castro Valley Interchange Project
I-680
Interstate 680 High Occupancy Vehicle & Auxiliary Lanes, Sunol Grade Northbound | Initial Study and Environmental Assessment
I-880 Improvements at 23rd & 29th Ave
Initial Study with Mitigated Negative Declaration (CEQA) and Environmental Assessment (NEPA) with Findings of No Significant Impact (FONSI)
ISEA for the Interstate 880 Southbound HOV Lane Extension Project
I-880 HOV Lane Widening Project
I- 880/State
Route 92 Interchange Reconstruction Project
Contra Costa County
- Antioch Bridge Seismic Retrofit Project DISTRICT 4 – CC –160, PM 0.8/1.3, SAC –160, PM 0.0/1.31A5210
(
40MB) 
- SECTION 4(F) DE MINIMIS FINDING
- Initial Study with Proposed Mitigated Negative Declaration
- Initial Studio (Proposed) Negative Declaration / Initial Study EA 2A170 0 Project Number 0400000810
- Loveridge Road to State Route 160 Draft Environmental Assessment / Initial Study
- Initial Study R4_envornmental_document | 2MB
- Discovery Bay Chapter 2
- Discovery Bay Chapters 3,4,5
- Discovery Bay FED Cover and Table of Contents
- Project Assessment Form for PM2.5 Interagency Consultation
- Initial Study with Mitigated Negative
Declaration/Environmental Assessment
with Finding of No Significant Impact
38MB - Initial Study/Proposed Mitigated Negative Declaration (31MB)
- Draft EA-IS
- Figure 3.13-1
- Figure 1-2a
- Figure 1-2b
- Figure 1-2c
- Figure 1-2d
- Figure 1-2e
- Figure 1-2f
- Figure 1-2g
- Figure 1-1
- Figure 3.13-2
- Figure 3.13-3
- Figure 3.13-4
- Figure 3.13-5
- Appendices
- Front Matter, Summary, and Chapters 1-7
- Appendix A
- Appendices B-H
- Appendix I (part 1 of 2)
- Appendices I (part 2 of 2), J, and K
- Chapter 1
- Chapter 2
- Chapter 3-6
- Appendix A
- Appendix B-G
- Appendix H
- Appendix I
- Appendix J-L
Antioch Bridge Seismic Retrofit Project
IMPACTS TO
THE MARSH ELEMENTARY SCHOOL
Mococo Overhead Seismic Restoration
Project
Route 4 Main Street Widening
Project
Route 4 (East) Widening
Project
Route 4 Median Buffer Zone Project:
Discovery Bay Appendices
I-80/San Pablo Dam Road
Interchange Project
I-80 High-Occupancy Vehicle Lane Project
The Department of Transportation (Department) has prepared this Initial Study, which examines the potential environmental impacts of the alternatives being considered for the proposed project located inand near the city of Fairfield, Solano County, California.
I-80 High Occupancy
Vehicle Lane Gap Closure Project
Route 84 Expressway Widening Project
ALAMEDA COUNTY, CALIFORNIA
DISTRICT 04 - ALA - 84, PM 22.5/27.3 EA 297600
Initial Study with Negative Declaration/ Environmental Assessment with Finding of No Significant Impact
I-680/State Route 4 Interchange Improvement Project
Marin County
- MAN ROD - Record of Decision
- Final Environmental Impact Statement Document Page EA 0A0800
- Marin 101 HOV Lane Gap
Closure Final Environmental Impact Statement/Report
- Marin 101 HOV Lane
Gap Closure Record of Decision
- Sonoma County Route 101 Initial Study/Environmental Assessment
- Route 101 Widening project from Route 12 in to Steele Lane Interchange in Santa Rosa
- Route101 Auxiliary Lanes Project 3rd Avenue to Millbrae Ave San Mateo County | Complete Document 22MB
MSN ROD
Marin-Sonoma Narrows (MSN) HOV Widening Project Final Environmental Impact Report/ Final Environmental Impact Statement
Route 101
Napa County
- Initial Study with Mitigated Negative Designation | 18MB
- Part 1 | 5MB
- Part 2 | 1MB
- Initial Study (2MB)
- Arnold Drive Cross Sections (5MB)
- Initial Study with Proposed Negative Declaration
Capell Creek Bridge Replacement Project
Duhig Road Rehabilitation
and Curve Realignment Project
Route 12 Arnold Drive Curve Realignment and Trinity Road Intersection Improvements in Sonoma
County
Sarco Creek Bridge Replacement Project
San Francisco County
- Archaeologists work to uncover a San Francisco neighborhood, and learn about the people who lived there.
- The History and Archaeology of Yerba Buena Island
- Archeology of A San Francisco Neighborhood
- Digging West Oakland

- Archeology of The Central Freeway Project

- (PDF Files below Recoded 10/21/04
)
Marine
Mammal Report - Appendix C
- Appendix D
- Fisheries Report
Archaeology
of a
San Francisco Neighborhood
Bay Area Archeology
East Spans Replacement Environmental Document (Support Documents)
The Yerba Buena Island Ramps Improvement Project
- Final EIR/EIS
- volume_1_ybi_final_eir_eis_through_appendix_g.pdf
- volume_2_ybi_final_eir_eis_ toc.pdf
- volume_2_ybi_final_eir_eis_appendix_h_j.pdf
- volume_2_ybi_final_eir_eis_appendix_n_r.pdf
- volume_2_ybi_final_eir_eis_appendix_k_m.pdf
- The Draft EIR/EIS
- volume_1_ybi_ramps_draft_eir_eis_through_appendix_g.pdf
- appendix_n_natural_environment_study.pdf
- appendix_k_ybi_water_quality_report.pdf
- appendix_m_ybi_noise_study_report.pdf
- appendix_i_ybi_visual_impact_assessment.pdf
- appendix_q_preliminary_foundation_memorandum.pdf
- appendix_p_paleontological_identification_report.pdf
- appendix_o_ybi_phase_1_isa_report.pdf
- appendix_h_ybi_traffic_forecast_and_operations_reports.pdf
- ybi_air_quality_analysis.pdf
- ybi_air_quality_analysis_addendum_memorandum.pdf
- rtp_and_rtip.pdf
- ybi_ramps_signed_foe.pdf
- supplemental_ybi_ramps_hpsr.pdf
- ybi_signed_hpsr_hrer_asr.pdf
San Mateo County
- Initial Study with
Mitigated Negative Declaration (CEQA) and Environmental Assessment (NEPA) with Findings of No Significant Impact (FONSI)
- calera_pkwy_deir_ea110801combined.pdf
- Project Assessment Form for PM2.5 Interagency Consultation
Route 92
Route 92 Uphill Slow Vehicle Lane and /Safety Improvements Initial Study and Environmental Assessment &
DUMBARTON BRIDGE (#35-0038) SEISMIC RETROFIT PROJECT
Route 1/Calera Parkway Widening Project from North of Reina Del Mar to South of Fassler Avenue
- ea_235840_101bdwy_fed_1_front_matter_thru_chapter_6.pdf
- ea_235840_101bdwy_fed_2_apps_a_through_h.pdf
- ea_235840_101bdwy_fed_3_app_i_pt_1.pdf
- ea_235840_101bdwy_fed_4_app_i_pt_2.pdf
- ea_235840_101bdwy_fed_5_app_j.pdf
Route 101/Broadway Interchange Reconstruction Project - Final Environmental Document
- Notice of Availability of Project-Level Conformity Information
- 101broadway_1of3_front_cover_thru_section2_6
- 101broadway_2of3_section2_7thru_chapter6
- 101broadway_3of3_appendices
- 101broadway_is_mind_ea_aug2010
- Project Assessment Form for PM 2.5 Interagency Consultation
- Initial Study
- Final Environmental Document
- Draft Environmental Document
Route 101/Broadway Reconstruction Project - Draft Environmental Document
Route 101 Auxiliary Lanes Embarcadero to Marsh Final Env. Doc
Route 101 San Francisquito
Creek Bridge Replacement Project
Santa Clara County
- Initial Study with Proposed Mitigated Negative Declaration
- Initial Study
- Final Environmental Impact Report /
Environmental Assessment and Section
4(f) De Minimis Finding
3/8/11 - Initial Study with Proposed Mitigated Negative Declaration
- Initial Study
- Initial Study
- Initial Study / Environmental Assessment - Safety Improvement Project on State Route 152 in Santa Clara County
- Final Environmental Impact Report/Environmental Assessment for the Hecker Pass Safety Improvement Project on SCL-152
- Approved July 2011 Complete Final EIR EA
- Improvements at SR-17/I-280/I-880 Interchange and I-880/Stevens Creek Boulevard Interchange
- VTA Web Site
- Initial Study (25MB)
Lover's Lane Safety Improvement Project, Santa Clara County
Uvas Creek Bridge Replacement
State Route 9 Safety Improvement Project
Route 101 Solar Highways Pilot Project
Route 101 Auxiliary from State Route Route 85 to Embarcadero
Route 101 Auxiliary Lanes Embarcadero to Marsh Final Env. Doc.
Route 152
Route 152 Hecker Pass Safety Improvement Project
I-280/880 Stevens Creek Project Project
I-680
Interstate 680 High Occupancy Vehicle & Auxiliary Lanes, Sunol Grade Northbound | Initial Study and Environmental Assessment
Solano County
- Finding for Impacts
- jepson_parkway_feis_volume_1_appendicies_may2011.pdf
- jepson_parkway_feis_volume_1_final_may2011final.pdf
- jepson_parkway_feis_volume_2_may2011.pdf
- 1_purpose_and_need.pdf
- 2_1human_environment.pdf
- 2_2community_impacts.pdf
- 2_3utilities_emergency_services.pdf
- 2_4traffic.pdf
- 2_5visual_aesthetics.pdf
- 2_6cultural_resources.pdf
- 2_7hydrology.pdf
- 2_8water_quality.pdf
- 2_9geology_soils_seismic_topography.pdf
- 2_10air_quality.pdf
- 2_11hazardous_waste_materials.pdf
- 2_12noise.pdf
- 2_13biological_envioronment.pdf
- 2_14_4_f_resources.pdf
- 2_15cumulative_impacts.pdf
- 3_comments_coordination.pdf
- 4_list_of_preparers.pdf
- 5_distribution_list.pdf
- appendix_a_ceqa_checklist.pdf
- appendix_b_title_vi_policy_statement.pdf
- appendix_c_summary_of_relocation_benefits.pdf
- appendix_d_minimization_and_or_mitigation_summary.pdf
- appendix_e_list_of_technical_studies_and_references.pdf
- appendix_f_sta_letter_in_support_of_alignment_et3.pdf
- appendix_g_alternatives_considered.pdf
- appendix_h_section_106.pdf
- appendix_i.pdf
- cover_and_preface.pdf
- table_of_contents.pdf
- Initial Study with Proposed Mitigated
Negative Declaration (CEQA) FINAL (
90MB)
4/27/11 - Initial Study with Proposed Mitigated Negative Declaration (CEQA)
- Jameson Canyon Document Page
- Route 37 (Vallejo) Environmental Document
- PM 2.5 Hot Spot Analysis 2010 12/10
- Draft Environmental Impact Report/Environmental Impact Statement Vol 1
- Draft Environmental Impact Report/Environmental Impact Statement Vol 2
- Final Environmental Impact Report
- truck_scales_final_environmental_impact_report_oct2009.pdf (
140MB) - Draft Environmental Impact Report/ Environmental Assessment
- front_matter.pdf
- ch_1_prop_project.pdf
- ch_2-0_aff_env.pdf
- ch_2-1_human_env.pdf
- ch_2-2_phys_env.pdf
- ch_2-3_bio_env.pdf
- ch_2-4_cumulative.pdf
- ch_3_ceqa.pdf
- ch_4_comments_coord.pdf
- ch_5_preparers.pdf
- ch_6_distribution.pdf
- ch_7_references.pdf
Benicia State Recreation Area
Jepson Parkway Project
The North Connector Project
Presented by Chapter Below:
Route 12 Shoulder Widening from Azevedo to Liberty Island Roads, and Left-Turn Pockets at Currie, McCloskey and Azevedo Roads
Route 12 Jameson Canyon Road
Widening & state routes 29/12 interchange project
Route 37
I-80/Interstate 680/State Route 12 Interchange Project
I-80 Eastbound Cordelia Truck Scales Relocation Project
Sonoma County
- Negative Declaration
07/01/10 - Initial Study with Mitigated Negative Declaration
- Environmental Assessment/Final Environmental Impact Report (EA/FEIR)

- front_matter
- summary
- chapter_1
- chapter_2
- chapter_3_sec_1
- chapter_3_sec_2_11
- chapter_3_sec_12_16
- chapter_4
- chapter_5
- chapter_6
- chapter_7
- chapter_8
- chapter_9
- chapter_10
- appendix_a
- appendix_b
- appendix_c
- appendix_d
- appendix_e
- appendix_f
- appendix_g
- appendix_h
- appendix_i
- appendix_j
- appendix_k
- appendix_l
- Environmental Assessment/Final Environmental Impact Report (EA/FEIR)
- Chapters 1-8
- Appendices
- Madrone Channelization Project Draft Initial Study
- Initial Study with Proposed Negative Declaration
- 02 Cover, General Information, Title Page
- 03 Chapter 1
- 04 Chapter 2
- 05 Chapter 3
- 05 Chapter 4-5
- 05 Figures
- Cover, Table of Contents, and Declarations
- Chapter 1 - Proposed Project
- Chapter 2 - Affected Environment, Environmental Consequences, Avoidance, Minimization, and/or Mitigation Measures
- Chapter 3 - Biological Environment
- Chapter 4 - Comments and Coordination
- Chapter 5 - List of Preparers
- Appendices A through F - CEQA Checklist, Cumulative Effects, Title VI Policy Statement, Local Road and Intersection Reconfigurations, Growth Inducement Study, Environmental Justice Study
- Appendices G through J - US Fish and Wildlife Service Biological Opinion, Agency Consulation and Coordination, List of Technical Studies, Other Documents Referenced
Route 12 in Sonoma County at the Laguna de Santa Rosa Bridge just east of Morris Street in Sebastopol.
Route 101 East Washington Street
Interchange
101 Sonoma HOV Widening and Improvements Project
Old Redwood Highway, Petaluma to Rohnert Park Expressway, Rohnert Park
Route 101 Sonoma HOV Widening and Improvements Project
Steele Lane, Santa Rosa to Windsor Road, Windsor
Route 116 Sebastopol to Cotati Roadway Rehabilitation Initial Study with Negative Declaration -- April 2009
Route 116 - Madrone Ave. Channelization Project
Route 116 Initial Study for Stage Gulch Road project
(6/21/10)
(6/21/10)Wilfred Avenue Interchange Project Negative Declaration/Finding of No Significant Impact (November 2006-Final Document). Public comment period for this project is closed
