Welcome to the State of California
Governor Brown Brian P. Kelly Malcolm Dougherty Carrie Bowen
Back to Project List

District 7 Projects

Pomona Freeway (SR-60) Pavement Rehabilitation Project

 

Overview

The Pomona Freeway (SR-60) is a major thoroughfare, serving commuters between Los Angeles and San Bernardino and Riverside counties. As a result of heavy use, the road has experienced extensive wear. SR-60 is being rehabilitated in both directions, between the San Gabriel River Freeway (I-605) and Orange Freeway (SR-57).  Along with pavement work, traffic loops installation and striping will take place within the project’s boundaries

 

 


Benefits
The new surface will provide a smoother, safer drive for motorists and improve traffic flow and goods movement. Pavement restoration will reduce time required for maintenance and minimize the need for lane closures
 

Schedule
Construction began in 2012 and is anticipated to complete fall, 2014

Cost 

$121.5 million.

 

Schedule
Construction began in 2012 and is anticipated to complete fall, 2014.

 

Contact
Caltrans, Public Affairs
(213) 897-3656
Website
www.dot.ca.gov/dist07
Twitter
@CaltransDist7

 

Documents

 



Press Releases






Back Button | Back To Page Top Link