District 7 - Projects

Share via:


SR-2 Terminus Project

Project Overview

The Glendale Freeway (SR-2) was originally planned and constructed in 1959 to connect with the Hollywood Freeway (US-101) through the neighborhoods of Silver Lake and Echo Park. In 1962, as a result of local community opposition, the full build-out plan was rescinded and construction was terminated at the present SR-2 terminus near Glendale Boulevard and Duane Street. Since then, commuter traffic coming of and on to SR-2 has passed through the community, primarily along Glendale Bl and Alvarado St and has contributed to congestion. A Federal Transportation Equity Act for the 21st Century (TEA-21) and a High Priority Highway Project Authorization grant were provided to upgrade the southern terminus of SR-2 and help manage the flow of traffic and address safety concerns
The purpose of this project is to develop a balanced transportation system that better serves local and regional transportation needs through improved management of traffic flow; enhanced pedestrian and non-motorized accessibility and safety at the SR-2 terminus; and creation of a context sensitive designed community open space in the immediate vicinity

 

Documents

 

New

Information Notice April 20, 2015

 

SR-2 Terminus Project Fact Sheet

 

Contact

Peter Jones (213) 897-0106

District 7, Public Affairs

Peter.Jones@dot.ca.gov

Website: www.dot.ca.gov/dist07

Twitter: @CaltransDist7

 

 

Links

For more information, please visit the Metro SR-2 Terminus Page

Connect With District 7

District 7 Blog        

Contact Information

General Information:

Phone: (213) 897-3656
Fax: (213) 897-3836

Physical Address:

California Department of Transportation
District 7
100 South Main Street
Los Angeles, CA 90012

Caltrans Logo

Translate.