1895

The Bureau of Highways was created with the appointment of the Lake Tahoe Wagon Road Commissioner and the Bureau of Highways Commissioners. The bureau studied highway needs and made recommendations for a 4,500-mile state highway system.

1897

California’s Department of Highways was created and operated until 1907 when the state Department of Engineering was created. The state legislature made its first appropriation for certain state roads.

1907

The State Department of Engineering was created. The Department of Highways and Lake Tahoe Wagon Road Commission were placed under the control of the department.

1909

California’s legislature passed the state’s first state highway bond. In 1910, voters approved the State Highways Act of 1909. It provided $18 million for construction and acquisition of a state highways system.

1911

The three-member California Highway Commission was created to oversee highway maintenance and construction. Legislation also provided for a state highway engineer, appointed by the governor to serve as the commission’s executive officer.

1912

The first state highway construction contract was awarded and signed, with work beginning the same year. Awarding this contract marked the beginning of construction on the Highway 1, El Camino Real, Pacific Coast route.

1923

The first state gas tax was created to fund the expansion of the state highway system. Initially, the tax was set at 2 cents a gallon. Accompanying legislation also created the "Motor Vehicle Fuel Fund," with some of the money going directly to counties and other funds being deposited into the "State Highway Maintenance Fund" for maintenance, repair, widening, resurfacing, and reconstruction of state highways and roads and highways in state parks.

1934

The state sign route numbering system was adopted.

1936

The San Francisco–Oakland Bay Bridge opened to traffic. The bridge represented a remarkable engineering and political achievement.

1937

State Route 1, also known as the Pacific Coast Highway, was completed and served as an important tourist and commercial corridor. This is was California’s first compete north-south highway.

1940

The Arroyo-Seco Parkway, California’s first freeway, was dedicated on December 30, 1940. This project marked the beginning of the freeway era in the Golden State.

1947

The Collier-Burns Act was passed and provided $76 million annually for new highway construction. Gas and diesel taxes were raised by 1-1/2 cents a gallon and driver license and registration fees were increased. The Division of Highways was reorganized to deal with the greater volume of work the act generated.

1953

California’s gas tax was increased to 6 cents a gallon to fund highway improvements.

1956

President Dwight D. Eisenhower signed the Federal-Aid Highway Act of 1956. Under the act, the federal government supplied 90 percent of funding for interstate highways, with the state paying the remaining 10 percent.

1960

The Winter Olympics in Squaw Valley served as impetus to build Interstate 80. Interstate 80 became the first all-weather, trans-Sierra Nevada highway and was nationally recognized as a major engineering achievement.

1961

California established the Highway Transportation Agency that consisted of the Department of Public Works (which included the Division of Highways), Department of Motor Vehicles, and the California Highway Patrol.

1963

The Collier-Unruh Act was passed and authorized the first rapid transit funding. The bill allowed counties to increase the in-lieu tax by one-half cent to develop rapid transit systems. The legislature also increased the gasoline tax to 7 cents a gallon.

1964

Governor Edmund G. Brown on May 14, signed Senate Bill 64 into law. The bill provided for renumbering the state highway system, effective July 1, 1964.

1965

The Highway Transportation Agency was renamed the Transportation Agency.

1969

The Business and Transportation Agency was formed from the departments and boards of Aeronautics, Highway Patrol, Corporations, Housing and Community Development, Insurance Motor Vehicles, Public Works (which included the Division of Highways), Real Estate, Savings and Loan, and State Banking.

1970

On April 20, the first high-occupancy vehicle lane opened. It was a one-half mile, peak-period, westbound bus lane through the San Francisco–Oakland Bay Bridge toll plaza.

1971

California’s first traffic management center in was established in Los Angeles. The 42-mile surveillance loop included the Santa Monica, San Diego, and Harbor freeways. This was a significant milestone in developing a fully-automated traffic management system and included elements such as underground loop detectors and ramp metering. The passage of the Transportation Development Act extended the state's retail sales tax to include gasoline, and provided for a portion of that revenue to be returned to local governments for transportation. This provided a significant new source of revenue for local transportation facilities, in particular, for transit.

1973

The California Department of Transportation (Caltrans) was formed to unify all transportation functions under a single department.

1978

The California Transportation Commission replaced the California Highway Commission, State Transportation Board, Aeronautics Board and California Toll Bridge Authority, for the purpose of advising and assisting the governor and legislature in formulating and evaluating state policies and plans for transportation programs.

1980

The Business and Transportation Agency was renamed the Business, Transportation and Housing Agency to better convey its broader mission.

1983

California’s gas tax increased to 9 cents a gallon, the first increase since 1963.

1987

Caltrans established its 12th and final district. The new district was in Orange County.

1989

The massive Loma Prieta Earthquake occurred on October 17, raising awareness for the need to strengthen and retrofit state highway bridges. After the earthquake, emergency transportation was greatly impacted in the Bay Area; however, Caltrans reopened the Bay Bridge in an amazing 30 days.

1990

The state gas tax increased to 14 cents a gallon with a yearly increase of 1 cent a year for four more years. A State Master Plan for Transportation was adopted, with a focus on reducing traffic congestion and an emphasis on expanding bus, rail and other public transit systems instead of adding more freeways.

1994

The state’s gas tax reached 18 cents a gallon. After the January 17 Northridge earthquake in Los Angeles, Caltrans reconstructed Interstate 5/State Route 14, the Gavan Canyon Bridge, and the Santa Monica Freeway Interstate 10 in record time.

1997

The passage of Senate Bill 45 substantially changed the process by which state and federal transportation funds are allocated, placing most of the responsibility for planning and prioritizing project funding in the hands of local and regional agencies rather than the state. To improve efficiency and reduce congestion, the Carquinez Bridge’s first dedicated electronic toll collection lane opened in August.

2002

The first Amber Alert notification occurred on August 1, when two teenage girls were abducted near Lancaster. Caltrans District 9 equipment operator Milton Walters spotted the abductor's white Bronco, scratched the license number in the dirt and on his lunchbox and contacted the California Highway Patrol.

2004

Voters approved the Transportation Congestion Improvement Act, also known as Proposition 42, to protect transportation funds. The act limited using transportation funds for nontransportation-related needs.

2005

Caltrans developed the Goods Movement Action Plan, which offered solutions to improve goods flow, while reducing environmental impacts related to good movements. The Department also distributed $5 million in federal funds as grants to metropolitan planning organizations to produce regional blueprint planning documents designed to improve environmental quality.

2006

Voters approved Propositions 1A and 1B. Proposition 1A permanently protected Proposition 42 transportation funds and required previously diverted funds to be repaid. Proposition 1B authorized the sale of $19.9 billion in bonds for a broad range of transportation projects.

The San Francisco–Oakland Bay Bridge self-anchored suspension span contract was awarded in April, which was the largest public infrastructure contract in California's history. Caltrans seismically retrofitted 99.5 percent of all state-owned bridges, making them stronger and safer if a major earthquake occurs.

2007

Caltrans, working with it partners in the private sector and government, oversaw the reconstruction of the Interstate 880 and Interstate 580 approaches to the San Francisco–Oakland Bay Bridge in a record 26 days following a devastating accident that compromised the structure.

The Devil’s Slide project began construction on State Route 1 in San Mateo County in September. Caltrans designed the project to bypass the dangerous and maintenance-intense Devil’s Slide that was frequently closed because of storm damage. When complete, the project will consist of two parallel 4,200-foot-long tunnels and a two 1,000-foot-long bridges.

In October, Caltrans quickly responded to a fiery tunnel crash on Interstate 5 near Santa Clarita that killed three people and involved 31 vehicles. Caltrans cleared the tunnel and reopened the route in a remarkable three days.

Caltrans, for the first time in history, oversaw $10 billion of construction on the State highway system.

2008

Caltrans completed the traffic-interfering work associated with rehabilitating the “boat section,” a 3/4-mile stretch of Interstate 5 in Downtown Sacramento. The work was completed in a record 38 working days, rather than the projected two years, with minimal inconvenience to the public.

2009

California received $3.64 billion from the American Recovery and Reinvestment Act (Economic Stimulus Package) for transportation and was the first state to obligate $1.5 billion to projects. These projects include a $1 billion lane widening on Interstate 405, a $13.5 million project to resurface and repair a 50-year-old section of Interstate 80 in the Bay Area and $1 billion to replace sections of Doyle Drive in San Francisco.

2013

On September 2, the new East Span of the San Francisco-Oakland Bay Bridge opened to traffic. The seismic opening of the new span is more than just an upgrade of one of the country's busiest bridges – it is an epic transformation of the bridge into a global icon.